Docstoc

Bid

Document Sample
Bid Powered By Docstoc
					                                                                                                                       ac0aed68-d265-48a6-ba64-2ea281e0e6fe.XLS




           <====CONTRACTOR NUMBER
                         CONTRACTOR NAME====>
                           COUNTY(IES)========> KANE- -
                           AIRPORT============> AURORA MUNICIPAL                                 BLANK PRICES   69
                           LETTING DATE=======> March 8, 2002
                          ITEM NUMBER========> 011A                TOTAL QUANTITY                PAY ITEMS      69      TOTAL BID                             $0.00
                         STATE NUMBER========> ARR2886
    AU057 <====CONTRACT NUMBER                                          33,247.600
 PIN       PAY ITEM DESCRIPTION                        U OF M           QUANTITY             X     UNIT PRICE   =    TOTAL PRICE

AR106511   TYPE A AREA LGHT POLE W/1 FIXTURE              EACH                       4.000                                      $0.00




                                                                       2
CONTRACTOR NUMBER                           0
CONTRACTOR NAME               0
ITEM NUMBER                   011A
STATE NUMBER                  ARR2886
CONTRACT NUMBER               AU057
THIS IS THE TOTAL BID>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>                    $0.00

NOTES:
1. Each PAY ITEM should have a UNIT PRICE and a TOTAL PRICE.
2. The UNIT PRICE shall govern if no TOTAL PRICE is shown or if there is a
   discrepancy between the product of the UNIT PRICE multiplied by the QUANTITY.
3. If a UNIT PRICE is omitted, the TOTAL PRICE will be divided by the QUANTITY
   in order to establish a UNIT PRICE.
4. A bid may be declared UNACCEPTABLE if neither a unit price nor a total price is shown.

ADDITIONAL NOTES WHICH APPLY FOR THE COMPUTER GENERATED (IDOTCBID)
SCHEDULE OF PRICES:
5. Pay item numbers (PIN), descriptions, unit of measure (U OF M), quantities, and Department
   supplied unit prices MUST BE CORRECT and CORRESPOND to the latest
   schedule of prices issued by the Department or the bid may be declared UNACCEPTABLE.
6. Insert this computer generated schedule of prices into the bidding proposal directly
   in front of the Department issued schedule of prices.
                            INSTRUCTIONS FOR CBID SPREADSHEET




To fill out Cbid spreadsheet all you will need to do is make sure your cursor is sitting
in the Contractor Number cell, enter your Contractor Number then hit your tab key or
the down arrow, you will then go to the Contractor Name field, fill that in then hit the Tab
key or the down arrow again and you will then be in the Unit Price column to begin entering
the Unit Price that you are bidding.

After you have completed all the unit price entries you will need to hold
down the CTRL key and the letter A for the contract to print.


If there is an addendum you will need to go to TOOLS, PROTECTION,
UNPROTECT SHEET to be able to delete contents of row. Highlight entire row then
go to Edit, Delete, the remaining rows will automatically move up so there will
be no blank lines. To add a row go to the last line of pay items then enter required information.
The formulas will automatically recalculate the number of line items and the Total Quantity.

!!!! DO NOT ADD A ROW IN THE MIDDLE OF SPREADSHEET !!!!

** There will be a separate sheet that will print out first, that has all the
information needed on it, there will be no need to fill it out separately.
You will also need to send it along with your bid, it will now be the first
sheet of the bid. The information on this sheet was previously the last page of your bid.

				
DOCUMENT INFO
Shared By:
Categories:
Stats:
views:46
posted:3/23/2010
language:English
pages:3