									STM-16 MADM TE MM/TX/052008/000356 issued on 16.05.2008 Clarification –I                   Annexure-A
                                                                                               Mar. 22, 10




                                 BHARAT SANCHAR NIGAM LIMITED
                              (A GOVERNMENT OF INDIA ENTERPRISE)
                              BHARAT SANCHAR BHAWAN, JANPATH
                                       NEW DELHI-110001
                                        (MMT SECTION)

No. 11-13/2008-MMT/TX(OF)                                          Dated 05.06.2008

To

All Prospective bidders.

Subject :- Tender No. MM/TX/032008/000356 issued on 16.05.2008 for Procurement of STM-16
MADM equipment.

Dear Sir,

Kindly find enclosed herewith the clarifications to the technical/commercial queries raised by some of the
prospective bidders against the subject tender. The clarifications are attached as annexure .

(i) Technical/Commercial – Queries/Clarifications – Annexure-A ( 6 pages)

(ii) The serial number 59 at page 36 & 37 in tender document is mentioned in two places, as such the
serial number 59 at page 36 &37 should be read as 59(i) and 59(ii).
Please acknowledge the receipt.


                                                                                              ADG(MMY)

Copy to ;-
(1) Jt. DDG (IT-II) for putting on BSNL website.
(2) Office copy




                                                   Page 1 of 7
STM-16 MADM TE MM/TX/052008/000356 issued on 16.05.2008 Clarification –I                             Annexure-A
                                                                                                         Mar. 22, 10

Sl   Clause no      Item description and clarification sought for                             Clarification
No   / Sec No /
.    GR No
1.   Sec - IV       Equipment backplane shall be equipped with all slots,                      Every TDM ports in
     Clause         connectors and necessary cabling in all the STM-16 MADM                   any card shall be
     No. 25         subracks. The tributary interfaces sought in one of the three             capable              of
                    configurations of STM-16 MADM shall be reusable in other                  backhauling its full
                    configurations. Every port in any card shall be capable of                capacity
                    backhauling its full capacity simultaneously along with other             simultaneously
                    ports in the same card.                                                   along with other
                    clarification sought for                                                  ports in the same
                    Request you not to insist upon the clause " Every port in any             card. However the
                    card shall be capable of backhauling its full capacity                    Ethernet ports and
                    simultaneously along with other ports in the same card" as this           Gigabit       Ethernet
                    will not be of any advantage to BSNL because all the ports of             Ports mapping to
                    the equipments may not be used simultaneously to their full               their full capacity is
                    capacity.                                                                 not insisted.
2.   Sec - IV       The tributaries and aggregate ports shall be provided on                  Please refer to the
     Clause         separate cards. The tributaries of different types shall be               clarification at sl no.
     No. 95         provided on different cards.                                              21
                    clarification sought for
                    Request you not to insist upon the clause " The tributaries of
                    different types shall be provided on different cards." The newer
                    technology and the latest advanced components available now
                    a days enable OEM vendor to develop dense cards which are
                    much smaller in size and provides multiple functionality. This
                    provides more scalability to the service providers rather than
                    restricting them and this is now a day’s demand of each Service
                    provider.
3.   2 (I) (b) /    "…………..supply experience of OEM’s product of atleast 25% of the           Request is regretted.
     Section –      tender quantity. For the purpose of supply experience, the certificate
     II             of supply of STM-16 MSPP, STM-16, and STM-64 shall be
                    considered."
                    Clarifications sought for
                     We understand that BSNL has modified the conditions of experience
                    as OEM's product and the requirement of experience of STM16
                    MSPP, STM16 and STM64 are only allowed which will restrict
                    categorically the Indian fast growing R & D based emerging company
                    to    bid    with    very     attractive and    competitive   prices.

                    We request you to kindly allow the experience of STM-1 and STM-4
                    also since these are parts of SDH series equipments and BSNL was
                    also previously considering the same in various tenders for allowing of
                    Indian fast growing and emerging company to offer more compliant
                    products at very attractive & competitive prices.
4.   10.1 (viii)    Undertaking      duly     signed   by      front  bidder     and    its   The clause shall be
     & 12.7 (d) /   technology/consortium partner stating that both of them shall be          read as,” Undertaking
     Section - II   liable for due performance of the contract jointly and severally. The     duly signed by front
                    front bidder shall submit an irrevocable undertaking duly signed by it    bidder and its OEM
                    and its technology/consortium partner …                                   stating that both of
                    Clarifications sought for                                                 them shall be liable
                    We understand the consortium bid with OEM is allowed.                     for due performance
                                                                                              of the contract jointly
                                                                                              and severally. The
                                                                                              front   bidder   shall
                                                                                              submit an irrevocable
                                                                                              undertaking       duly
                                                                                              signed by it and its
                                                                                              OEM partner …”.

                                                    Page 2 of 7
STM-16 MADM TE MM/TX/052008/000356 issued on 16.05.2008 Clarification –I                                   Annexure-A
                                                                                                               Mar. 22, 10
Sl   Clause no    Item description and clarification sought for                                    Clarification
No   / Sec No /
.    GR No

5.   5 (ii) of    Field trial ----------------------- within one month of the issue of the         The clause shall be
     Section -    advance purchase order. If the field trial ......................within one      read as,” ………If the
     IV           month of issue of the                                                            field                      trial
                   purchase order…………..                                                            ......................within
                  Clarifications sought for                                                        one month of issue of
                  The reference mentioned is from the date of issue of APO at one                  advance             purchase
                  place and PO at the other place. We feel that there may be some                  order…………..”
                  typographical mistake, please review and confirm the same.
6.   6 (i) of     ………...The training shall be held at the Original Equipment                       The training shall be
     Section -    Manufacturing (OEM) place, the Complete Knock Down (CKD)                         held at the OEM place
     IV           manufacturing place of the bidder …………..                                         or the complete knock
                  Clarifications sought for                                                        down         place(CKD)
                  If an OEM is utilizing a contract manufacturing which is a current               manufacturing place
                  international norms then we feel that training will be at the location of        of the bidder. The
                  OEM (other than knock down CKD location). Please confirm the                     location of the OEM
                  same.                                                                            facility     shall     be
                                                                                                   specified      by     the
                                                                                                   bidder.
7.   7 (e) & 7    The EMS shall be integrated with the network elements by the                     a) The integration of
     (g) of       respective                                            bidder.                    the EMS with NE is
     Section IV                                                                                    part of supply of the
                  .......The 10% Payment shall be released after EMS integration with              EMS and its software
                  the equipment installed in local & at remote stations and issuance of            implementation.
                  Successful Acceptance Testing certificate for EMS by the T&D Circle              b) The clause is clear.
                  of the BSNL. The bidder shall be liable to integrate EMS with all the            The bidder shall be
                  network elements that are installed within six months period starting            liable to integrate
                  from the date of completion of supplies. The installation of the network         EMS with all the
                  elements and the requirement of integration shall be intimated to the            network elements that
                  bidder before the expiry of the period                                           are installed within six
                  Clarifications sought for                                                        months period starting
                  a) We understand that the tender is only for supply but also on the              from the date of
                  other side we understand that the integration of EMS is to be done by            completion              of
                  bidder which comes under services. In such case, tender shall be                 supplies.
                  called as supply and services and WCT may also be involved in this               c) Yes please.
                  case. (i) Please confirm who shall bear the cost of Work Contract Tax            d)       Yes      please.
                  on the total contract value (ii) If bidder has to take this in their account     However bidder will
                  then under which coloumn the same shall be quoted since this may be              assist in integration of
                  on       total package       value.      Please     confirm      /    clarify.   the left out NE with
                                                                                                   the EMS whenever
                  b) We understand from the tender that the delivery period (expiry of             required.
                  period) is 6 months from APO and BSNL will confirm the installed NE              e) Yes please.
                  status for EMS integration within 6 months of completion of supplies             f) BSNL will provide
                  and is to be completed within the expiry of the period. We feel that             the        transmission
                  there is some contradictory. Please review and reconfirm the same.               media (E1) for DCN
                  c) We understand that installation of NE is BSNL's responsibilities and          from NE to EMS.
                  availability of all the supplied hardware / software / additional if any         Bidder will integrate
                  are BSNL's responsibilities to make the same available to the bidder             the DCN with EMS.
                  for integration of EMS at site. Please confirm the same.
                  d) We understand that BSNL Circle must inform the status of the
                  installed NE for EMS integration within 6 months of completion of
                  supplies. In case BSNL circle has not installed the balance NE
                  available with the circles then integration with the EMS for balance
                  NEs will be the responsibilities of BSNL. Please confirm the same.
                  e) In case the training is completed then 5 % payment shall be
                  released within 6 months of supplies even pending for integration of
                  EMS if any and corresponding 10 % payment of integration. Kindly
                  confirm the same.
                  f) We understand that BSNL shall extend the DCN upto EMS for the


                                                     Page 3 of 7
STM-16 MADM TE MM/TX/052008/000356 issued on 16.05.2008 Clarification –I                             Annexure-A
                                                                                                         Mar. 22, 10
Sl    Clause no     Item description and clarification sought for                            Clarification
No    / Sec No /
.     GR No
                    integration. Kindly confirm the same.
8.    21 of         ….supply 700 nos Ethernet cable crimping tools (RJ 45).                  Yes please.
      Section -     Clarifications sought for
      IV & 10 .4    We understand that both (21 of Section - IV & 10 .4 of SOR (Section -
      of SOR        V)) are the same requirements. Please confirm for clarity.
      (Section -
      V)
9.    31 of         Bidders shall have to provide four number of 10 dB and four number       a) Attenuators in the
      Section -     of 5 dB optical attenuators with each MADM STM-16 equipment, for         SOR at 10.2 & 10.3
      IV and        incorporating additional loss in the short links. …………..                 are same as asked in
      10.2 &        Clarifications sought for                                                the clause but bidder
      10.3 of       a) We understand that both (31 of Section - IV and 10.2 & 10.3 of        has to supply the
      SOR           SOR (Section - V)) are the same requirements. Please confirm for         patch cords also as
      (Section -    clarity.                                                                 per this clause.
      V)            b) If any bidder quote STM16 equipment of superior's quality which       b)      Request     is
                    does not require attenuators for incorporating additional loss in the    regretted.
                    short links then the required attenuators has not been to be quoted
                    and not to be supplied . Please confirm the same.
10.   32 of         Ten sets of SFP modules for each type of optical SFP port in an          a) Yes please.
      Section -     MADM shall be supplied as spares in addition to the maintenance          b) The last sentence
      IV and        spares sought in the bill of material. One set of SFP module shall be    of the clause shall be
      10.1 of       the number of SFP modules provided in one MADM of configuration 1        read as,” One set of
      SOR           and one ADM of configuration 2 of the SOR.                               SFP module shall be
      (Section -    Clarifications sought for                                                the number of SFP
      V)            a) We understand that both (32 of Section - IV and 10.1 of SOR           modules provided in
                    (Section - V)) are the same requirements. Please confirm for clarity.    one       MADM        of
                    b) SOR indicates configuration A, B & C not configuration 1 & 2.         configuration A, one
                    Please review the same and reconfirm the same.                           ADM of configuration
                                                                                             B and one ADM of
                                                                                             configuration C of the
                                                                                             SOR.
11.       &
      261 66 of     Cl. 26 : Wire wrapping points are to be provided for 2 Mb/s interface.   Clarifications sought
      Section-
        2           PCM cables for every interface along with the suitable wrapping tools    for
      IV/ 26 & 66   shall also be supplied. One wrapping tool shall be supplied along with   a) 5 wrapping tool
                    every 5 MADM/ADMs. If the card has IDC type, D type or any other         shall    be    supplied
                    type connector, the PCM cables are to be crimped accordingly at the      along     with   every
                    equipment end and supplied. No wire wrapping points shall be             MADM/ ADM.
                    provided in such case. PCM cables for every interface along with the     b) One crimping tool
                    suitable crimping tools shall be supplied. One crimping tool shall be    shall be supplied for
                    supplied for every 20 MADM/ADMs. 80% of the PCM cables shall             every                20
                    have 15 mtr length and 20% of the PCM cables shall have 30 mtr           MADM/ADMs.
                    lengths.                                                                 c) The required length
                    ery 6 ADMs. Please review and reconfirm the requirement of crimping      of coaxial cables for
                    tool.                                                                    STM-1e       and     E3
                    Cl. 66 : - PCM cable and Coaxial cables etc. shall be supplied as per    interface is 20 mtrs for
                    the specification of relevant TEC GRs. The cables shall be supplied      each interfaces.
                    with double screen. The length of each of the cable shall be 20 mtrs.    d) as per c) above.
                    The cable shall be crimped in the field by the consignees. The bidder    e) 80% of the PCM
                    may supply continuous lengths of the cable in drums & connectors.        cables shall have 15
                    The actual cable deployment shall be as per the field requirements.      mtr length and 20% of
                    The necessary tools/crimping tool used from preparing the cable with     the PCM cables shall
                    the suitable connector shall be supplied along with every MADM/ADM.      have 30 mtr lengths.
                    30 Mtr Coaxial cable shall be supplied for every STM-1e interface for    f) as above in e)
                    termination at DDF. The PCM cables are preferred in 16 pairs or 24       please.
                    pairs or more. Incase the bidder supplies The PCM cable supplied
                    shall be of 30mtr length for 20% of the interfaces and 15 mtr lengths
                    shall be supplied for the 80% interfaces.
                    30 mtr PCM cables for every interface along with the suitable
                    wrapping tools shall also be supplied. One wrapping tool shall be


                                                   Page 4 of 7
STM-16 MADM TE MM/TX/052008/000356 issued on 16.05.2008 Clarification –I                               Annexure-A
                                                                                                           Mar. 22, 10
Sl    Clause no      Item description and clarification sought for                             Clarification
No    / Sec No /
.     GR No
                     supplied along with every ADM. If Any other type interface points ( For
                     IDC-Type connectors/ other types) are provided, the PCM cables are
                     to be crimped at the equipment end and supplied. 30 mtr PCM cables
                     for every interface along with the suitable crimping tools shall be
                     supplied. One crimping tool shall be supplied for every 6 ADMs. The
                     PCM cables for E1 interfaces are preferred in 16 pairs or 24 pairs.
                     Clarifications sought for
                     a) Cl 26 indicates the requirement of one wrapping tool with every 5
                     MADM however Cl 66 requires one wrapping tool with each MADM.
                     Please review and reconfirm the requirement of wrapping tool
                     b) Cl 26 indicates the requirement of One crimping tool for every 20
                     MADM/ADMs however Cl 66 require One crimping tool for ever.
                     c) We understand that the required length of coaxial cables for STM-
                     1e is 30 mtrs for each interfaces. Please confirm.
                     d) We understand that the required length of coaxial cables for E3
                     interfaces is 20 mtrs for each interfaces. Please confirm.
                     e) We understand that the required length of PCM cables for E1
                     interfaces is 30 mtrs (80% quantity) and 15 mtr (20% quantity). Please
                     confirm.
                     f) In case of crimping PCM cable, the required length of PCM cables
                     for E1 interfaces is 30 mtrs (80% quantity) and 15 mtr (20% quantity).
                     Please confirm.
12.   36 of          36. The expansion subrack shall be as per the relevant clauses of the     The clause is clear.
      Section IV     TEC GR. Expansion rack shall be supplied with minimum cards and           The equipment shall
                     inter subrack cabling required as per the TEC GR ( such as switch,        be supplied as per the
                     control, management, power supply etc) for satisfactory working of the    tender     and     GR
                     tributary interfaces that can be plugged into the supplied expansion      condition.
                     subrack. Expansion chassis with or without cross connection/switch
                     matrix modules is acceptable. .....................
                     Clarifications sought for
                     a) We feel that clause is ambigous . On one side the requirement is
                     with minimum cards and inter subrack cabling in expension subrack
                     however on other side the requirement is Expansion chassis with or
                     without cross connection/switch matrix modules. Please review and
                     reconfirm                             the                         same

                      b) We understand that If Switch matrix card is provided in expansion
                     chassis, then also the system must be of full non blocking cross
                     connection of 128 x 128 VC-4 for HOVC or equivalent for LOVC at
                     VC-12 & VC-3 or in combination .Please review and reconfirm the
                     same.
13.   52 of          The bidder shall supply Laser printer, along with each EMS………….           The             printers
      Section IV     Clarifications sought for                                                 mentioned in the SOR
      & 6.1 & 7.4    We understand that one printer with each EMS against item no. 6.1 of      are for EMS locations.
      of SOR         SOR is to be supplied apart from item no. 7.4 of SOR . Please review      The quantity in the
                     and reconfirm the same.                                                   Item no. 7.4 of the
                                                                                               SOR shall be read as
                                                                                               32 in place of 20.
14.   59 of          The Clauses in the GR for LCT is modified as given below. Branded         The clause no. 59 is
      Section IV     Laptop/Desktop should be provided as per the configuration                clear. As per the SOR
      (LCT           mentioned below…………...………………                                              No.7.1 section V, only
      specificatio   Clarifications sought for                                                 Laptop     shall     be
      n)             We understand that there is mix up of specification of laptop &           supplied.
                     desktop. Please review the same and reconfirm the individual required
                     specification for laptop and Desktop separately so that no confusion
                     shall arise at later date. Please review & confirm the same.
15.   75 of          The system shall provide the capability for translation of a contiguous   The clause is clear.
      Section- IV    concatenated payload into a VCG (and vie-versa) through EMS/LCT.          Request is regretted.
                     The STM-N (N=4, 16) interfaces of the equipment shall be capable of


                                                     Page 5 of 7
STM-16 MADM TE MM/TX/052008/000356 issued on 16.05.2008 Clarification –I                              Annexure-A
                                                                                                          Mar. 22, 10
Sl    Clause no    Item description and clarification sought for                              Clarification
No    / Sec No /
.     GR No
                   transporting POS output from routers, and similar contiguous
                   concatenated payloads.
                   Clarifications sought for
                   Please provide some more details to check it. However we also
                   request you to please delete the requirement of contiguous
                   concatenation as it is more related to the legacy old classical
                   equipment and none of the latest equipment supports it due to the
                   availability of virtual concatenation.
16.   79 of        …... 8FE+1GE shall be provided on one IO card. Implementation of           The equipment shall
      Section IV   FE & GE on different cards shall be permitted. However the                 be supplied as per the
                   equipment must support L2 aggregation among the different cards. L2        GR      and     tender
                   aggregation shall be as per clause 6.3.3 of part II of the GR              conditions.
                   Clarifications sought for
                   a) We understand that more than 8 FE + 1 GE on one I/O card is not
                   acceptable and not to be quoted / supplied. Please confirm the same.
                   b) We also understand that if the FE port or GE port are more than 8
                   or 1 respectively on one I/O card then bidders has to quote / supply
                   the different cards for FE and GE. Please review and confirm the
                   same.
                   c) We understand that L-2 aggregation and L-2 switching shall be
                   provided on a centralized switch fabric, not on individual Ethernet
                   cards. Please confirm.
17.   80 of        ADM and MADM shall interoperate completely. The cross connect              The clause is clear.
      Section IV   size of an MADM/ADM shall be 128 x 128 VC-4 for HOVC and 128 x
      and 89 of    128 VC-4 equivalent for LOVC at VC-12 & VC-3. ………….
      Section -    Clarifications sought for
      IV           We understand that the required cross connection of MADM / ADM is
                   128 x 128 VC-4 for HOVC or equivalent for LOVC at VC-12 & VC-3 or
                   in combination. Please confirm the same.
18.   86 of        SAN Interfaces                                                             Yes please.
      Section IV   Clarifications sought for
                   We understand that SAN interfaces are optional requirement and
                   hence not be considered for TSEC evaluation for this tender purpose.
                   When ever BSNL places an order for these interfaces, TSEC
                   evaluation can be carried out / obtained for these interfaces. Please
                   confirm the same.
19.   91 of        The MAC/Packet switch redundancy is not mandatory.                         The equipment shall
      Section IV   Clarifications sought for                                                  be supplied as per the
                   Please that clarify that Ethernet L-2 switching redundancy is not          GR      and     tender
                   required. As we understand that this is a mandatory clause in TEC          condition.
                   G.R. Since access technogies like Wi-Max, DSLAM,3G aggregates
                   their traffic through packet transport, it is advisable to have Packet
                   switch redundancy. In the previous tender L-2 switching redundancy
                   was the mandatory requirement and has not been relaxed. Please
                   review and reconfirm the same.
20.   93 of        Clause no. 93 of Section IV : The LAN switch shall be equipped with        LAN switch shall be
      Section IV   100 Base FX-32 ports, 100 BaseT 32 ports and 1000 Base T 2                 supplied as per the
      &            ports……….                                                                  clause93 Section IV.
      6.3 of SOR
                    6.3 of SOR ( Section - V) : LAN Switch 96 port Medium range (100
                   Base T-96 ports, 1000 Base T-4 ports)
                   Clarifications sought for
                   The specification of LAN switch mentioned at 93 of Section IV & 6.3
                   of SOR are different. Please review and reconfirm the correct
                   requirements of ports of LAN Switch.
21.   95 of        The tributaries and aggregate ports shall be provided on separate          a) The STM-4 and
      Section IV   cards. The tributaries of different types shall be provided on different   STM-1 tributaries on
                   cards.                                                                     same card are also
                   Clarifications sought for                                                  acceptable. However

                                                   Page 6 of 7
STM-16 MADM TE MM/TX/052008/000356 issued on 16.05.2008 Clarification –I                             Annexure-A
                                                                                                         Mar. 22, 10
Sl    Clause no    Item description and clarification sought for                             Clarification
No    / Sec No /
.     GR No
                   a) We understand that bidder has to quote / supply separate cards for     in such condition, no
                   STM4 & STM1 tributaries. Please review and confirm the same.              blocking simultaneous
                                                                                             individual ports shall
                   b) We understand that optical and electrical trib of STM-1 on same        be supplied.
                   card is acceptable being same type of SDH interface. Please review        b)      Optical      and
                   and                 confirm                the               same.        Electrical    tributaries
                                                                                             on same card is also
                   c) We also understand that E1 and E3 tribs are different categories of    acceptable. However
                   trib interface and bidders has to quote / supply different cards for E1   in such condition, non
                   and       E3.    Please    review    and     confirm      the    same.    blocking simultaneous
                                                                                             individual ports shall
                   d) We understand that the functionality of aggregate and cross            be supplied.
                   connection is required to quote and supply on separate cards. Please      c)     E1     and     E3
                   confirm the same.                                                         tributaries on same
                                                                                             card       is        also
                                                                                             acceptable. However
                                                                                             in such condition, non
                                                                                             blocking simultaneous
                                                                                             individual ports shall
                                                                                             be supplied.
                                                                                             d) Yes please.
22.   4.1 of SOR   Additional Maintenance spares set consisting of complete equipment        Wired rack is not
      (Section -   from 1.1 to 1.10 including soft copy of manuals                           required. It should be
      V)           Clarifications sought for                                                 read as ,” 1.1 to 1.9”.
                   Item no. 1.10 i.e. Wired Rack is also required in the additional
                   maintenance spares set or not. Please review and reconfirm the
                   same.
23.   4.2 of SOR   Additional maintenance Spares set consisting of complete equipment        Wired rack is not
      (Section -   from 2.1 to 2.11 including Soft copy of manuals                           required. It should be
      V)           Clarifications sought for                                                 read as ,” 2.1 to 2.10”.
                   Item no. 2.11 i.e. Wired Rack is also required in the additional
                   maintenance spares set or not. Please review and reconfirm the
                   same.




                                                   Page 7 of 7

								