Docstoc

HOT WORK NOTICE FORM

Document Sample
HOT WORK NOTICE FORM Powered By Docstoc
					HOT WORK NOTICE FORM The University of Iowa NOTE: The General Contractor must obtain Hot Work Tags from the Owner; Subcontractors must obtain Hot Work Tags from the General Contractor. The General Contractor shall submit this notice to the Construction Manager. The General Contractor shall display this notice at the jobsite with other OSHA required safety documents. The Construction Manager shall copy this notice to the Department of Public Safety, Office of Risk Management and project file.

Please be advised that hot work will be occurring as noted below. All hot work will be in full compliance with the UI Hot Work Program (See Document 00 73 13 - Supplementary Conditions), including the use of Hot Work Tags and all other OSHA and NFPA hot work requirements.

Notice Date:

Project Data Project Number: Project Title: Project Location: Construction Manager:

Contractor Data Contractor Name: Safety Officer: Hot Work Supervisor: Hot Work Description: Duration Data Hot Work Start Date: Hot Work Completion Date: Time: Time: am / pm am / pm

Signed: Print Name (General Contractor’s Representative) Signature


				
DOCUMENT INFO
Shared By:
Categories:
Tags: WORK, NOTICE, FORM
Stats:
views:18
posted:12/13/2008
language:English
pages:1