professional documents
home
Profile
Upload
docsters
Blogs
Upload
about me
contact me
user photo
submit clear
Word Document

Management Plan Template center doc

D:\Docstoc\Working\ActivePDF\Input\$ASQManagement Plan Template.doc.doc Study name Management Plan Prepared by Name Title Job title Branch/District Branch/District Division/Region Division/Region Location Floor, street, city Version no. 1.0 Revision date 28 January 2008 Status Draft/Final Review/Sign Off (Delete 2 of) DMS ref. no. DMS reference number File/doc.no File number/document number Action statement Date Name Position Action required (Review/Endorse/Approve) Due date On-Q Template version date 8.07.02 Study Name Study Plan Queensland Transport Version 1.0 28/01/2008 Page 2 of 14 Document control sheet Contact for enquiries and proposed changes If you have any questions regarding this document or if you have a suggestion for improvements, please contact: Study Manager Insert Study Manager's name here Phone Insert phone number here Version history Version no. Date Changed by Nature of amendment 02/07/2002 Initial draft. . Name Position Signature Date Study Name Study Plan Queensland Transport Version 1.0 28/01/2008 Page 3 of 14 Contents 1 Broad strategy ............................................................................................................ 4 2 Study control .............................................................................................................. 4 2.1 Integration ................................................................................................................... 4 2.2 Scope management ...................................................................................................... 4 2.3 Time management........................................................................................................ 4 2.4 Cost management ......................................................................................................... 4 2.5 Quality management .................................................................................................... 4 2.6 Human Resources management ................................................................................... 5 2.7 Communication management ...................................................................................... 5 2.7.1 Internal communication ............................................................................................... 5 2.7.2 External communication .............................................................................................. 5 2.8 Risk and issues ............................................................................................................. 5 2.8.1 Risk ......................................................................................................................................... 5 2.8.2 Issues....................................................................................................................................... 5 2.9 Procurement management............................................................................................ 6 Appendix A – Study scope....................................................................................................... 7 2.1 In scope ........................................................................................................................ 7 2.2 Out of scope ................................................................................................................. 7 2.3 Related Studys.............................................................................................................. 7 2.4 Constraints ................................................................................................................... 7 2.5 Urgency........................................................................................................................ 7 2.6 Assumptions................................................................................................................. 7 Appendix B – Study schedule.................................................................................................. 8 Appendix C – Study budget..................................................................................................... 9 Appendix D – Risk management plan.................................................................................. 10 Appendix E – Internal communication management plan................................................. 12 Appendix F – External communications.............................................................................. 13 Appendix G – Responsibility assignment matrix ................................................................ 14 Study Name Study Plan Queensland Transport Version 1.0 28/01/2008 Page 4 of 14 1 Broad strategy Discuss the broad strategy to deliver the . To delete this guidance text box, double click mouse in the left margin then press delete. Type here 2 Study control 2.1 Integration Integration of the following eight elements will be achieved by development of this management plan, managing the in accordance with it and updating the plan and its attachments as the progresses and circumstances change. To delete this guidance text box, double click mouse in the left margin then press delete. Type here 2.2 Scope management Describe how changes to scope will be managed (including software tools to be used). Refer to a detailed attachment showing scope in detail (could be drawings for physical Studys or Business Process Analysis for business change Studys). Describe how variations to scope will be identified, approved and funded.. To delete this guidance text box, double click mouse in the left margin then press delete. Type here 2.3 Time management Describe how changes to time and resources will be managed (including any software tools to be used). Refer to an attached Study Schedule breaking the Study into activities (work breakdown structures) displaying start, finish, internal resources, external resources and major milestones. To delete this guidance text box, double click mouse in the left margin then press delete. Type here 2.4 Cost management Describe how changes to costs will be managed (including software tools to be used). Refer to an attached budget estimate breaking the Study into activities (work breakdown structures) displaying the estimated costs for internal resources and external resources. To delete this guidance text box, double click mouse in the left margin then press delete. Type here 2.5 Quality management The quality assurance process used in completing the study will be the process outlined in the ITPF. To delete this guidance text box, double click mouse in the left margin then press delete. Type here Study Name Study Plan Queensland Transport Version 1.0 28/01/2008 Page 5 of 14 2.6 Human Resources management Describe the approach to be taken with the deployment of internal and external resources. Provide a Study team organisation structure and describe roles and responsibilities. Provide details of any Study specific training required. Refer to a responsibility matrix (if required). To delete this guidance text box, double click mouse in the left margin then press delete. Type here 2.7 Communication management Describe the approach to be taken with the deployment of internal and external resources. Provide a Study team organisation structure and describe roles and responsibilities. Provide details of any Study specific training required. Refer to a responsibility matrix (if required). To delete this guidance text box, double click mouse in the left margin then press delete. Type here 2.7.1 Internal communication Detail the Study reports to be produced. Identify who will produce them, who will receive them and what action is required from the receiver. To delete this guidance text box, double click mouse in the left margin then press delete. Type here 2.7.2 External communication Describe the communication processes for all internal parties including Executive Management, Advisory Group Members, Stakeholders, Sponsor, Director, team members, and users. Refer to a detailed Communication Plan (if required). To delete this guidance text box, double click mouse in the left margin then press delete. Type here 2.8 Risk and issues 2.8.1 Risk Describe how the will manage risk in Section 10 of the proposal document. Ensure the attached risk table covers all these items. Refer to an attached risk plan showing identified risks, severity, likelihood and mitigation actions (Actions should be included in the Study schedule). To delete this guidance text box, double click mouse in the left margin then press delete. Type here 2.8.2 Issues Describe how the Study will manage issues (including software tools to be used). Refer to an attached listing of issues. To delete this guidance text box, double click mouse in the left margin then press delete. Type here Study Name Study Plan Queensland Transport Version 1.0 28/01/2008 Page 6 of 14 2.9 Procurement management Describe how external goods and services will be procured. This includes contract/subcontract management, land acquisition, material procurement, contract administration. Refer to an attached procurement plan (if required). To delete this guidance text box, double click mouse in the left margin then press delete. Type here Study name Queensland Transport Version 1.0 28/01/2008 Page 7 of 14 Appendix A – Study scope 2.1 In scope This defines the Study boundaries to facilitate effective management of deliverables on time and to agreed/approved cost. The scope outlined in any previous document should be confirmed here or updated as necessary. List all items that are included in the scope of this Study. To delete this guidance text box, double click mouse in the left margin then press delete. 2.2 Out of scope List identified items that will not be delivered as part of this Study. This is most important as it specifies items which will not be undertaken as part of this Study. This assists in managing/avoiding scope creep. The importance of individual out of scope items should be mentioned. Such items may pose significant risks to the Study if they are not done at all by others. This may create risks for the Study which need to be recognised and managed. To delete this guidance text box, double click mouse in the left margin then press delete. 2.3 Related Studys List any related Studys or proposals affecting this Study (whether past, current or planned) and their relationship to this Study. The impact of these on your Study should be described. Such Studys may pose significant risks to the Study if they are not done at all by others or not completed in time. This may create risks for the Study which need to be recognised and managed. To delete this guidance text box, double click mouse in the left margin then press delete. 2.4 Constraints Restrictions which will limit the way the objective is to be achieved (describe anything that might impact on the successful development and/or implementation of the Study). This may include restrictions on budget /funding, political issues, limited resources to work on the Study, timing constraints or constraints on the implementation of the outcomes of the Study. To delete this guidance text box, double click mouse in the left margin then press delete. 2.5 Urgency Identify the urgency of the Study stating reasons. To delete this guidance text box, double click mouse in the left margin then press delete. 2.6 Assumptions List all assumptions made in producing this document. To delete this guidance text box, double click mouse in the left margin then press delete. Study name Queensland Transport Version 1.0 28/01/2008 Page 8 of 14 Appendix B – Study schedule ID WBS ID Task name Resources Duration Depend. Start Finish 1 2 3 4 5 6 7 8 9 10 11 12 Study name Queensland Transport Version 1.0 22 September 2005 Page 9 of 14 Appendix C – Study budget ID WBS ID Task name Resources Duration Depend. Start Finish Internal labour cost Contract labour cost External services and material costs Other costs Total costs 1 2 3 4 5 6 7 8 9 10 11 12 Study name Queensland Transport Version 1.0 22 September 2005 Page 10 of 14 Appendix D – Risk management plan Broad strategy for risk management Type here A summary of significant risk factors Type here Overall assessment of Study risk Type here Study name Queensland Transport Version 1.0 22 September 2005 Page 11 of 14 Appendix D – Risk management table No. Risk factor Likelihood Impact Risk rating Proposed response/mitigation (what) Action (how) Related activity number 1 2 3 4 5 Study name Queensland Transport Version 1.0 22 September 2005 Page 12 of 14 Appendix E – Internal communication management plan References Study Plan dated ….. Introduction Type here Standard Study reporting Type here Monthly reports Type here Exception reports Type here Conduct of meetings Type here Management of information systems Type here Study office procedures Type here Control mechanisms Type here Addendum 1 -Communications management matrix No. Identified staff Function /skill Role description 1 2 3 4 Study name Queensland Transport Version 1.0 22 September 2005 Page 13 of 14 Appendix F – External communications • Communication Goal (Outline here what the communication is to achieve – in say 25 words or less) • Communication Objectives (The objectives should be clear and measurable, dot points only. Breakdown the elements of how the goal will be achieved. These should state what the communication is to achieve and must be realistic. They should contain the elements – inform, persuade, motivate). • Communication Strategy (The strategy should indicate how to go from what is, to what should or could be). • Key messages (There should only be one to three key messages in dot point format. These key messages should be what needs to be said to get the target audiences to walk away thinking/doing as desired). • Target audiences (Who is to be influenced? These should be broken down into primary and secondary audiences. In some cases the objectives and strategies for each audience need to be separated). • Tactics (What will actually be done? This is where the communication activities are listed, at a broad level, against the target audiences. A matrix helps in this instance to clearly show the activity, audience, purpose and timeframe). • Budget (How much will it cost? Has funding been provided? – from another source?). • Resourcing • Timelines • Activities to be undertaken. • Communication tools to be used such as: • Frequently asked questions and responses • Project website • Freecall 1800 telephone enquiry line • Fact sheets/information kit • Display material • Project contact cards • Communications management • Project team • Schedule • Cost/budget • Risk identification and risk response protocols • Communication approval process • Role of consultants • Communication and consultation reporting • Evaluation Study name Queensland Transport Version 1.0 22 September 2005 Page 14 of 14 Appendix G – Responsibility assignment matrix Legend PM Study Manager SG Stakeholder group PG Program Manager PC Study Manager – concept phase CR Customer representative EM Executive management PO Study officer UR User representative AG Advisory group SP Sponsor A Assist C Consult O Coordinate P Primary responsibility R Review S Sign off Role WBS ID Task PM PC PO AG SG CR UR SP PG EM
rate this doc
email this doc
embed this doc
add to folder
digg reddit stumble delicious
flag this doc
262
23
not rated
0
1/28/2008
English
search termpage on Googletimes searched
Preview

Project Risk Management Plan

ocak 1/28/2008 | 1334 | 406 | 0 | business
Preview

Document Management Plan Template[1]

ocak 1/28/2008 | 742 | 141 | 0 | business
Preview

Document Management Plan Template 1

ocak 1/28/2008 | 1080 | 136 | 0 | business
Preview

Project Communication Management Plan Template

ocak 1/28/2008 | 2026 | 408 | 0 | business
Preview

Project Communications Management Plan Template

ocak 1/28/2008 | 1123 | 272 | 0 | business
Preview

Project Contract Management Plan Template

ocak 1/28/2008 | 993 | 320 | 0 | business
Preview

Project Issue Management Plan Template

ocak 1/28/2008 | 907 | 240 | 0 | business
Preview

Project Quality management plan template

ocak 1/28/2008 | 1239 | 347 | 0 | business
Preview

Configration Management Plan Template

ocak 1/28/2008 | 289 | 39 | 0 | business
Preview

Project Change Control Management Plan Template

ocak 1/28/2008 | 856 | 172 | 0 | business
Preview

Project Project Plan Template

ocak 1/28/2008 | 2560 | 589 | 0 | business
Preview

Project Management Plan 1

banter 1/8/2008 | 2820 | 563 | 2 | business
Preview

Change and Configuration Management Plan Template

ocak 1/28/2008 | 546 | 110 | 0 | business
Preview

Configration Management Short Plan Template

ocak 1/28/2008 | 117 | 8 | 0 | business
Preview

Contract Management Plan Template[2]

ocak 1/28/2008 | 455 | 52 | 0 | business
Preview

Template Project Scale[1]

ocak 1/28/2008 | 1805 | 1641 | 2 |
Preview

Strategic Asset Plans[1]

ocak 1/28/2008 | 1055 | 358 | 2 | business
Preview

Steering Committee Charter template[1]

ocak 1/28/2008 | 2230 | 419 | 3 | business
Preview

Status Report Management Process Flow example[1]

ocak 1/28/2008 | 2190 | 689 | 1 | business
Preview

Status Report example[1]

ocak 1/28/2008 | 2545 | 909 | 2 | business
Preview

Software Requirement Specifications Document Template[1]

ocak 1/28/2008 | 1818 | 324 | 1 | business
Preview

Scope Statement Development Instructions[1]

ocak 1/28/2008 | 738 | 40 | 0 | business
Preview

Schedule Of Excess Risks[1]

ocak 1/28/2008 | 417 | 21 | 0 | business
Preview

Sample Performance Based Requirement Template for use with Task Orders[1]

ocak 1/28/2008 | 1023 | 24 | 0 | business
Preview

Risk Value Assessment Tool

ocak 1/28/2008 | 683 | 83 | 1 | business
 
review this doc