Word Document

Road Construction Contract

You must be logged in to download this document
Reviews
Shared by: tracy14
Stats
views:
63
rating:
not rated
reviews:
0
posted:
12/12/2008
language:
English
pages:
0
Road Construction Contract Supplementary Conditions of Contract Annexure Form C6839 March 07 THIS PAGE NOT USED Supplementary Conditions of Contract Annexure Contract Number: Clause numbers refer to clauses in the Supplementary Conditions of Contract. Item 1 Contractor’s staff 1A Mandatory Staffing Requirements (Clause 4.1) The Contractor shall maintain on the Site at least the following staff. Project Manager Contractor’s Quality Representative Landscape Representative Surveyor Project Engineer Environmental Representative Community Liaison Officer Works Supervisor Minimum Experience Level for Contractor's staff - Roadworks Minimum Years of Experience (Y) Prequalification Level Project Manager 1 Project Engineer 1 2 R1 2 2 2 2 R2 2 2 2 3 R3 4 4 4 6 R4 6 6 6 9 R5 8 8 8 12 Para-Professional Supervisory Minimum Experience Level for Contractor's staff - Bridgeworks Minimum Years of Experience (Y) Prequalification Level Project Manager 1 B1 2 2 2 2 B2 2 2 2 3 B3 4 4 4 6 B4 6 6 6 9 Project Engineer 1 Para-Professional Supervisory 2 Note: 1. For all road and bridge projects at levels 2 and higher, either the Project Manager or other officer responsible for making technical decisions (whether located on site or not) must be a qualified civil engineer. 2. Para-professional covers Contractors Quality Representative, Environmental Representatives, Landscape Representative and Community Liaison Officer. Page 1 of 7 C6839 March 07 Supplementary Conditions of Contract Annexure Contract Number: 1B Project Manager (Clause 4.2) 1C Project Engineers (Clause 4.3) 1D Contractor’s Quality Representative (Clause 4.4) 1E Environmental Representative (Clause 4.5) 1F Landscaping Representative (Clause 4.6) 1G Community Liaison Officer (Clause 4.7) 1H Surveyors (Clause 4.8) 1I Works Supervisors (Clause 4.9) Works Supervisors shall be employed in at least the following disciplines Minimum number of hours 1J Apprentice/ Training Requirements (Clause 5) 2 Contractor’s program Clause 8.2 2A Time for submission of construction program Page 2 of 7 C6839 March 07 Supplementary Conditions of Contract Annexure Contract Number: 2B Format of the construction program Clause 8.2 Critical path network Bar chart 2C Preferred format for electronic program data 2D Minimum number of activities in construction program 3 4 Time for submission of Quality Plan Time for submission of Environmental Management Plan Time for submission of Construction Workplace Plan Traffic management Clause 8.3 Clause 8.3 Clause 9.2 Clause 10.2 5 6 Clause 11.7 6A A Traffic Management Plan is required 6B Time for submission of Traffic Management Plan 7 Community Liaison 7A A Community Liaison Plan is required 7B Time for submission of Community Liaison Plan 8 Mandatory Milestones Milestone Number Clause 12.1 Yes No Clause 12.2 Clause 13.1 Yes No Clause 13.2 Clause 14 Description Completion Date † † Unless stated otherwise, where a period of time is provided, the period commences on the Date of Acceptance of Tender. Page 3 of 7 C6839 March 07 Supplementary Conditions of Contract Annexure Contract Number: 9 Lane rental charges Clause 16 Hourly Charge Location Time Lane Closure 1 Lane 2 Lanes Shoulder Closure 10 Intervals between Site Conferences 11 Survey marks 11A Survey marks provided by the Clause 17.2 Clauses 21.1, 21.2 and 21.5 Principal Station Easting Northing Height 11B Accuracy of survey marks Clause 21.5 12 Contractor’s reports Clauses 22.1 and 22.2 Clauses 22.1 and 22.3 Yes Yes No No 12A Daily reports 12B Weekly reports 13 Maintenance by the Contractor 13A Site vegetation and plantings 13B Mow grassed areas Clause 25(a) Clause 25(b) Yes Yes No No Page 4 of 7 C6839 March 07 Supplementary Conditions of Contract Annexure Contract Number: 13C Clean drains 13D Maintain existing pavement 13E Maintain completed pavement 13F Maintain lighting 13G Maintain pavement marking 14 Advertising signs Clause 26.1 Clause 25(c) Clause 25(d) Clause 25(e) Clause 25(f) Clause 25(g) Yes Yes Yes Yes Yes No No No No No 14A The number of project signs to be supplied and erected by the Contractor 14B The size and/or type of project signs 14C The location to which project signs are to be delivered at the completion of the Contract 15 Clause 26.1 Clause 26.1 Office accommodation for the Superintendent Clause 31 Yes No 15A The Contractor is to provide office accommodation for the Superintendent 15B Size of office accommodation and amenities required to be provided Clause 31 16 Restrictions to access for Constructional Plant Clause 32 Page 5 of 7 C6839 March 07 Supplementary Conditions of Contract Annexure Contract Number: 17 Areas where waterways can be filled for construction purposes, including restrictions and conditions to be applied Clause 35 18 Blasting Clause 36.4 18A Permitted times for blasting 18B Conditions under which it will be permitted to stop traffic for blasting Clause 36.5 19 Design by the Contractor Clause 37.2 19A Principal’s Requirements For a Reinforced Soil Structure, the design life, design parameters, minimum design and construction standards and performance criteria shall be as specified in Main Roads Standard Specification MRS11.06 Reinforced Soil Structures. For work which is to be designed by the Contractor as the result of the Principal accepting an alternative tender, the design shall be in accordance with the standards of the Principal’s design, if supplied, or with the requirements of the most recent versions of the following Main Roads’ publications —         Standard Specifications Roads Manual Road Planning and Design Manual Road Drainage Design Manual Australian Bridge Design Code Standard Drawings Roads Manual Manual of Uniform Traffic Control Devices Traffic and Road Use Management Manual Main Roads’ Pavement Design Manual Page 6 of 7 C6839 March 07 Supplementary Conditions of Contract Annexure Contract Number: 19A Principal’s Requirements     Main Roads’ Landscaping Manual Road Traffic Noise Management: Code of Practice Other Austroads Manuals and Guides Clause 37.4 Clause 37.2 Main Roads’ Pavement Rehabilitation Manual 19B Value of Professional Indemnity Insurance Policy 19C Period after Final Certificate to Clause 37.4 maintain Professional Indemnity Insurance Policy 20 Bonus for early completion 20A A bonus for early completion Clause 39 Clause 39 Bonus Completion Date will apply to eligible works 20B Details of applicable bonus Yes No Section of the Works to which Bonus Applies (eligible works) Bonus Amount ($) 21 NOT USED 22 Additional clauses Clause 42 Page 7 of 7 C6839 March 07

Related docs
Road Construction Contract
Views: 39  |  Downloads: 0
CONTRACT FOR CONSTRUCTION
Views: 2914  |  Downloads: 74
Construction Contract Packages
Views: 137  |  Downloads: 6
NEW CONSTRUCTION CONTRACT
Views: 244  |  Downloads: 20
Construction Contract Awareness
Views: 6  |  Downloads: 0
CONSTRUCTION CONTRACT PROCESSES
Views: 0  |  Downloads: 0
General Construction Contract
Views: 0  |  Downloads: 0
Construction Contract Modifications
Views: 0  |  Downloads: 0
ConstruCtion ContraCt ManageMent
Views: 0  |  Downloads: 0
CONSTRUCTION CONTRACT GUIDELINES
Views: 0  |  Downloads: 0
#20-Rails to Trails Construction Contract
Views: 0  |  Downloads: 0
premium docs
Other docs by tracy14
Option to purchase business of going corporation
Views: 274  |  Downloads: 10
2mg
Views: 120  |  Downloads: 0
Natural fathers application
Views: 196  |  Downloads: 0
Business interest power to manage and control
Views: 160  |  Downloads: 0
Guaranty of equipment lease
Views: 265  |  Downloads: 6
WAIVER OF NOTICE OF MEETING
Views: 155  |  Downloads: 4
Transcript of Compromise of 1850
Views: 248  |  Downloads: 1
Wallops Island Ballon
Views: 163  |  Downloads: 0
Publishing agreement general editor consultant
Views: 326  |  Downloads: 8
Application for requisition
Views: 192  |  Downloads: 0
Telecommunications
Views: 218  |  Downloads: 1
3812[0]
Views: 98  |  Downloads: 0
AP French Language 2001 Free Response Questions
Views: 1831  |  Downloads: 17
Finance Lecture3
Views: 301  |  Downloads: 7