Road Construction Contract
Supplementary Conditions of Contract
Annexure
Form C6839
March 07
THIS PAGE NOT USED
Supplementary Conditions of Contract Annexure
Contract Number:
Clause numbers refer to clauses in the Supplementary Conditions of Contract.
Item
1 Contractor’s staff 1A Mandatory Staffing Requirements (Clause 4.1) The Contractor shall maintain on the Site at least the following staff. Project Manager Contractor’s Quality Representative Landscape Representative Surveyor Project Engineer Environmental Representative Community Liaison Officer Works Supervisor
Minimum Experience Level for Contractor's staff - Roadworks Minimum Years of Experience (Y) Prequalification Level
Project Manager 1 Project Engineer
1 2
R1
2 2 2 2
R2
2 2 2 3
R3
4 4 4 6
R4
6 6 6 9
R5
8 8 8 12
Para-Professional Supervisory
Minimum Experience Level for Contractor's staff - Bridgeworks Minimum Years of Experience (Y) Prequalification Level
Project Manager
1
B1
2 2 2 2
B2
2 2 2 3
B3
4 4 4 6
B4
6 6 6 9
Project Engineer 1 Para-Professional Supervisory
2
Note: 1. For all road and bridge projects at levels 2 and higher, either the Project Manager or other officer responsible for making technical decisions (whether located on site or not) must be a qualified civil engineer. 2. Para-professional covers Contractors Quality Representative, Environmental Representatives, Landscape Representative and Community Liaison Officer.
Page 1 of 7 C6839 March 07
Supplementary Conditions of Contract Annexure
Contract Number: 1B Project Manager
(Clause 4.2)
1C Project Engineers
(Clause 4.3)
1D Contractor’s Quality Representative
(Clause 4.4)
1E Environmental Representative
(Clause 4.5)
1F Landscaping Representative
(Clause 4.6)
1G Community Liaison Officer
(Clause 4.7)
1H Surveyors
(Clause 4.8)
1I Works Supervisors (Clause 4.9)
Works Supervisors shall be employed in at least the following disciplines
Minimum number of hours 1J Apprentice/ Training Requirements (Clause 5)
2
Contractor’s program
Clause 8.2
2A Time for submission of construction program
Page 2 of 7 C6839 March 07
Supplementary Conditions of Contract Annexure
Contract Number: 2B Format of the construction program
Clause 8.2
Critical path network Bar chart
2C Preferred format for electronic program data 2D Minimum number of activities in construction program 3 4 Time for submission of Quality Plan Time for submission of Environmental Management Plan Time for submission of Construction Workplace Plan Traffic management
Clause 8.3 Clause 8.3 Clause 9.2 Clause 10.2
5 6
Clause 11.7
6A A Traffic Management Plan is required 6B Time for submission of Traffic Management Plan 7 Community Liaison 7A A Community Liaison Plan is required 7B Time for submission of Community Liaison Plan 8 Mandatory Milestones Milestone Number
Clause 12.1
Yes
No
Clause 12.2
Clause 13.1
Yes
No
Clause 13.2
Clause 14
Description
Completion Date †
†
Unless stated otherwise, where a period of time is provided, the period commences on the Date of Acceptance of Tender.
Page 3 of 7 C6839 March 07
Supplementary Conditions of Contract Annexure
Contract Number: 9 Lane rental charges
Clause 16
Hourly Charge Location Time Lane Closure 1 Lane 2 Lanes Shoulder Closure
10 Intervals between Site Conferences 11 Survey marks
11A Survey marks provided by the
Clause 17.2
Clauses 21.1, 21.2 and 21.5
Principal Station Easting Northing Height
11B Accuracy of survey marks
Clause 21.5
12
Contractor’s reports
Clauses 22.1 and 22.2 Clauses 22.1 and 22.3 Yes Yes No No
12A Daily reports 12B Weekly reports 13 Maintenance by the Contractor
13A Site vegetation and plantings 13B Mow grassed areas
Clause 25(a) Clause 25(b)
Yes Yes
No No
Page 4 of 7 C6839 March 07
Supplementary Conditions of Contract Annexure
Contract Number: 13C Clean drains 13D Maintain existing pavement 13E Maintain completed pavement 13F Maintain lighting 13G Maintain pavement marking 14 Advertising signs
Clause 26.1 Clause 25(c) Clause 25(d) Clause 25(e) Clause 25(f) Clause 25(g) Yes Yes Yes Yes Yes No No No No No
14A The number of project signs to be supplied and erected by the Contractor 14B The size and/or type of project signs 14C The location to which project signs are to be delivered at the completion of the Contract 15
Clause 26.1
Clause 26.1
Office accommodation for the Superintendent
Clause 31 Yes No
15A The Contractor is to provide office accommodation for the Superintendent 15B Size of office accommodation and amenities required to be provided
Clause 31
16
Restrictions to access for Constructional Plant
Clause 32
Page 5 of 7 C6839 March 07
Supplementary Conditions of Contract Annexure
Contract Number: 17 Areas where waterways can be filled for construction purposes, including restrictions and conditions to be applied
Clause 35
18
Blasting
Clause 36.4
18A Permitted times for blasting
18B Conditions under which it will be permitted to stop traffic for blasting
Clause 36.5
19
Design by the Contractor
Clause 37.2
19A Principal’s Requirements
For a Reinforced Soil Structure, the design life, design parameters, minimum design and construction standards and performance criteria shall be as specified in Main Roads Standard Specification MRS11.06 Reinforced Soil Structures. For work which is to be designed by the Contractor as the result of the Principal accepting an alternative tender, the design shall be in accordance with the standards of the Principal’s design, if supplied, or with the requirements of the most recent versions of the following Main Roads’ publications — Standard Specifications Roads Manual Road Planning and Design Manual Road Drainage Design Manual Australian Bridge Design Code Standard Drawings Roads Manual Manual of Uniform Traffic Control Devices Traffic and Road Use Management Manual Main Roads’ Pavement Design Manual
Page 6 of 7 C6839 March 07
Supplementary Conditions of Contract Annexure
Contract Number: 19A Principal’s Requirements
Main Roads’ Landscaping Manual Road Traffic Noise Management: Code of Practice Other Austroads Manuals and Guides Clause 37.4 Clause 37.2
Main Roads’ Pavement Rehabilitation Manual
19B Value of Professional
Indemnity Insurance Policy
19C Period after Final Certificate to Clause 37.4
maintain Professional Indemnity Insurance Policy 20 Bonus for early completion
20A A bonus for early completion Clause 39 Clause 39 Bonus Completion Date
will apply to eligible works
20B Details of applicable bonus
Yes
No
Section of the Works to which Bonus Applies (eligible works)
Bonus Amount ($)
21 NOT USED 22 Additional clauses Clause 42
Page 7 of 7 C6839 March 07