Hall Lane Strategic Gateway

Document Sample
Hall Lane Strategic Gateway Powered By Docstoc
					                  Hall Lane
         Strategic Gateway

Major Scheme Business Case
 Application for Full Approval
                     Main Text




                  March 2009
Hall Lane Strategic Gateway




Major Scheme Business Case
Application for Full Approval

March 2009


Main Text


Notice
This report was produced by Atkins Transport Planning for Liverpool City Council for the specific purpose of
Hall Lane Strategic Gateway project.

This report may not be used by any person other than Liverpool City Council without Liverpool City Council's
express permission. In any event, Atkins accepts no liability for any costs, liabilities or losses arising as a
result of the use of or reliance upon the contents of this report by any person other than Liverpool City
Council.


Document History

JOB NUMBER:                                                 DOCUMENT REF:
                                                            Hall_Lane_Business_Case_Full_Approval_Mar_09.doc




   1       Draft Final                           GR                                                            Mar 09

           Draft                              GR / ILM          GR              GR              GJ             Oct 07

Revision        Purpose Description           Originated     Checked         Reviewed       Authorised          Date

/ Hall_Lane_Business_Case_Full_Approval_Report_Mar_09.doc
Hall Lane Strategic Gateway
Major Scheme Business Case – Application for Full Approval




Contents
Section                                                                                    Page
1.       Introduction                                                                          7
2.       Background                                                                            8
         Area Affected by Scheme                                                               8
         Need for Scheme                                                                       9
         Existing Highway Network                                                              9
         Local Access                                                                         11
         Public Transport Provision                                                           12
         Pedestrian Facilities                                                                12
         Cyclist Facilities                                                                   13
         Environmental Issues                                                                 16
         The ‘Gateway’ to the City Centre                                                     16
         Summary                                                                              19
         Scheme Objectives                                                                    19
         Scheme Description                                                                   20
         Choice of Routes                                                                     21
3.       Strategic Case and Planning Policy Support for the Scheme                            24
         Strategic Case                                                                       24
         Planning Policy Support for the Scheme                                               30
4.       Appraisal and Value for Money: Traffic Forecasting                                   39
         Local Model Validation                                                               39
         Demand Forecasts                                                                     90
5.       Appraisal and Value for Money: Assessment Against Central Government Objectives     105
         Introduction                                                                        105
         Economic Objective                                                                  105
         Safety Objective                                                                    120
         Accessibility Objective                                                             121
         Environmental Objective                                                             122
         Consultation with Key Local Stakeholders                                            132
         Statutory Consultees                                                                133
6.       Appraisals and Value for Money: Assessment Against Scheme Objectives                134
         Introduction                                                                        134
         ‘Gateway’ to Liverpool City Centre                                                  134
         Environmental Impact                                                                135
         Highway Capacity                                                                    135
         Kensington Regeneration                                                             135
         Road Safety                                                                         136
         Highway Network                                                                     137
         Public Transport                                                                    139
         Pedestrian and Cycling Facilities                                                   140
7.       Appraisals and Value for Money: Supporting Analyses                                 143

/ Hall_Lane_Business_Case_Full_Approval_Report_Mar_09.doc                                      2
Hall Lane Strategic Gateway
Major Scheme Business Case – Application for Full Approval




         Introduction                                                       143
         Distribution and Equity                                            143
         Financial Sustainability and Affordability                         145
         Practicality and Public Acceptability                              147
         Contribution to Ten Year Plan Targets                              147
8.       Financial                                                          148
         The Local Transport Plan                                           148
         Procedure for Consultation and Adoption of LTP’s                   148
         Construction Funding                                               149
         LCC Project Funding                                                149
         Financial                                                          150
9.       Delivery / Commercial                                              152
         Introduction                                                       152
         Strategy                                                           152
         Risks and Issues                                                   153
         Stakeholder Management                                             161
         Governance                                                         161
         Roles and Responsibilities                                         161

List of Tables
Table - 4.1 - Yearly Correction Factors                                     41
Table 4.2 - Monthly Correction Factors                                      41
Table 4.3 - Daily Correction Factors                                        41
Table 4.4 - Prior matrix construction                                       56
Table 4.5 - PCU Factors                                                     58
Table 4.6 - GEH Statistics for Calibration Links Used in the ME Process     59
Table 4.7 - Matrix Summary (PCUs)                                           59
Table 4.8 - Convergence Statistics for Model                                61
Table 4.9 - Convergence in the Morning Peak Hour                            61
Table 4.10 - Convergence in Inter Peak Hour                                 62
Table 4.11 - Convergence in Evening Peak Hour                               62
Table 4.12 - Summary of Screenline Comparison - All Counts                  77
Table 4.13 - Summary of Screenline Comparison - Calibration Counts          77
Table 4.14 - Summary of Screenline Comparison - Validation Counts           77
Table 4.15 - Other Calibration Counts                                       77
Table 4.16 – Screenline Validation / Calibration in the Morning Peak Hour   78
Table 4.17 – Screenline Validation / Calibration in the Inter Peak Hour     79
Table 4.18 – Screenline Validation / Calibration in the Evening Peak Hour   80
Table 4.19 - Summary of Journey Time Validation Results                     83
Table 4.20 – Comparison of Journey Times in the Morning Peak Hour           83
Table 4.21 – Comparison of Journey Times in the Inter Peak Hour             84
Table 4.22 – Comparison of Journey Times in the Evening Peak Hour           86
Table 4.23 – Ratio of the Shoulder Hours to Peak Hour Flows                 90
Table 4.24 - Default TEMPRO Growth for Car Driver in the Merseyside Area    91
Table 4.25 - Fuel Price and Income Forecast Adjustment Factors              92
Table 4.26 - Adjusted TEMPRO Growth for Car Driver in the Merseyside Area   92
Table 4.27 - Development Growth Assumptions                                 93
Table 4.28 - Fixed Demand Matrix Total                                      93

/ Hall_Lane_Business_Case_Full_Approval_Report_Mar_09.doc                     3
Hall Lane Strategic Gateway
Major Scheme Business Case – Application for Full Approval




Table 4.29 – Convergence Summary for Fixed Matrix Runs                        95
Table 5.1 – Summary of Scheme Costs (2008 Q2 Prices)                         107
Table 5.2 – Scheme Cost Spend Profile (2008 Q2 Prices, £’000s)               107
Table 5.3 - Annualisation Factor Derivation                                  108
Table 5.4 – Summary of Present Value of Benefits of the Scheme               110
Table 5.5 – Economic Appraisal Summary Results                               111
Table 5.6 - Journey Cost Elasticity Values for All Purposes Combined         112
Table 5.7 - Tests for Future Year Forecasts                                  112
Table 5.8 – Matrix Total Fixed Demand versus Variable Demand                 113
Table 5.9 – Sensitivity of Elastic Assignment on Scheme Benefits             114
Table 5.10 – Effects of Uncertainty on Economic Appraisal                    115
Table 5.11 – Approximated Social Grade                                       117
Table 5.12 – Present Value of Benefits of Accidents                          120
Table 5.13 – Accident Savings                                                120
Table 5.14 – Local Air Quality Assessment Results                            123
Table 5.15 – Carbon Dioxide Emissions (tonnes / year)                        123
Table 5.16 – Summary of AST Assessment Scores                                131
Table 7.1 - Local Government Affordability and Financial Sustainability      146
Table 8.1 - Summary of Scheme Costs (2008 Q2 Prices)                         150
Table 8.2 - Summary of Construction Costs (2008 Q2 Prices)                   151
Table 9.1 – Tender Framework Risk Register for Hall Lane Strategic Gateway   154


List of Figures
Figure 2.1 – Existing Highway Network (Local Area)                           14
Figure 2.2 – Existing Highway Network (Wider Area)                           15
Figure 2.3 – Urban Grain (Early Twentieth Century and Now)                   16
Figure 2.4 – Loss in Urban Character                                         17
Figure 2.5 – Example of Poorly Defined Open Space                            17
Figure 2.6 – View West from Edge Lane Towards City Centre                    18
Figure 2.7 – View North West Along Hall Lane                                 18
Figure 2.8 – View North West through Holland Place from Wavertree            18
Figure 2.9 – Hall Lane Strategic Gateway Scheme                              23
Figure 4.1 - Roadside Interview Locations                                    43
Figure 4.2 - Automatic Traffic Count Locations                               44
Figure 4.3 - Permanent Liverpool Automatic Traffic Count Locations           45
Figure 4.4 - Manual Classified Count Locations (Wider Area)                  46
Figure 4.5 - Manual Classified Count Locations (Liverpool Area)              47
Figure 4.6 - Journey Time Survey Routes                                      48
Figure 4.7 - Merseytram Study Area                                           51
Figure 4.8 - Zonal Plan (Wider Area)                                         52
Figure 4.9 - Zonal Plan (Hall Lane Area)                                     53
Figure 4.10 - Junction Types in the Hall Lane Area                           54
Figure 4.11 - Sector System                                                  57
Figure 4.12 – Hall Lane Study Area (Screenlines)                             63
Figure 4.13 – 2004 Morning Peak Hour Observed Traffic Flows (pcus)           65
Figure 4.14 - 2004 Morning Peak Hour Modelled Traffic Flows (pcus)           66
Figure 4.15 – 2004 Inter Peak Hour Observed Traffic Flows (pcus)             67
Figure 4.16 – 2004 Inter Peak Hour Modelled Traffic Flows (pcus)             68


/ Hall_Lane_Business_Case_Full_Approval_Report_Mar_09.doc                      4
Hall Lane Strategic Gateway
Major Scheme Business Case – Application for Full Approval




Figure 4.17 – 2004 Evening Peak Hour Observed Traffic Flows (pcus)             69
Figure 4.18 – 2004 Evening Peak Hour Modelled Traffic Flows (pcus)             70
Figure 4.19 – 2004 AADT Observed Traffic Flows (vehicles)                      71
Figure 4.20 – 2004 AADT Modelled Traffic Flows (vehicles)                      72
Figure 4.21 - Morning Peak Hour Flow Calibration / Validation                  74
Figure 4.22 - Inter Peak Hour Flow Calibration / Validation                    75
Figure 4.23 - Evening Peak Hour Flow Calibration / Validation                  76
Figure 4.24 - Screenline System (Wider Merseyside Area)                        81
Figure 4.25 - Screenline System (Liverpool Area)                               82
Figure 4.26 – Treatment of Traffic Growth in the SATURN Highway Model          93
Figure 4.27 - Do Minimum Traffic Forecasts (2010 AADT)                         97
Figure 4.28 - Do Something Traffic Forecasts (2010 AADT)                       98
Figure 4.29 - Do Minimum Traffic Forecasts (2025 AADT)                         99
Figure 4.30 - Do Something Traffic Forecasts (2025 AADT)                      100
Figure 4.31 – Key Junction Affected by the Hall Lane Scheme                   103
Figure 5.1 – Relationship of Scheme to Regeneration Areas                     119
Figure 6.1 – East-West Route through the Study Area                           138
Figure 6.2 – North-South Route through the Study Area                         139
Figure 7.1 – Indices of Deprivation 2004                                      144



Appendices (Bound Separately)
Appendix A         SoS Decision Letter
Appendix B         Edge Lane West Improvement Scheme
Appendix C         Flow Differences With / Without Scheme
Appendix D         Junction Delay With / Without Scheme
Appendix E         Economic Summary of Core Scenario
Appendix F         Summary Forecast Traffic Flows (AADT)
Appendix G         Effects of Elasticity Sensitivity on Economic Assessment
Appendix H         Effects of Uncertainty on Economic Assessment
Appendix I         Security Worksheet
Appendix J         Severance Worksheet
Appendix K         Noise Worksheet
Appendix L         Local Air Quality Worksheets
Appendix M         Greenhouse Gases Worksheet
Appendix N         Townscape Worksheet
Appendix O         Heritage of Historic Resources Worksheet
Appendix P         Biodiversity Worksheet
Appendix Q         Water Environment Worksheet
Appendix R         Physical Fitness Worksheet
Appendix S         Journey Ambience Worksheet
Appendix T         Integration Worksheets
Appendix U         Appraisal Summary Table
Appendix V         Stakeholder Response
Appendix W         LCC S151 Officer Letter
Appendix X         Independent Surveyor’s Report
/ Hall_Lane_Business_Case_Full_Approval_Report_Mar_09.doc                       5
Hall Lane Strategic Gateway
Major Scheme Business Case – Application for Full Approval




Appendix Y         Risk Register
Appendix Z         Birse Civils Risk Statement
Appendix AA Key Stakeholder Directory
Appendix BB Governance / Roles and Responsibilities
Appendix CC Project Plan




/ Hall_Lane_Business_Case_Full_Approval_Report_Mar_09.doc    6
Hall Lane Strategic Gateway
Major Scheme Business Case – Application for Full Approval




1.          Introduction
1.1         This document is the Application for Full Approval for Department for Transport (DfT) funding of
            the Hall Lane Strategic Gateway. This is a project for a restructuring of the highway network
            where the main road route into the city from the M62 (and most of the rest of the country) enters
            the central areas of the city.
1.2         The Scheme has completed the statutory procedures and the Compulsory Purchase Order and
            the Side Roads Order were confirmed by the First Secretary of State on 15 October 2008 (see
            Appendix A).
1.3         It was first accepted for programme entry into the regional programme, for DfT funding through the
            Regional Funding Allocation, in 2000 at a total scheme cost of £12.2m.




/ Hall_Lane_Business_Case_Full_Approval_Report_Mar_09.doc                                                   7

				