Docstoc

GTA Form

Document Sample
GTA Form Powered By Docstoc
					 Appendix B
GTA Details
            GTA #                                    Date          Attachments   0


         GTA Title Human and Robotics Technologies

           WBS # Advanced 1
                          Space Technology Program (ASTP) Type 1

       Points of Contact            Name         Location Phone      Fax             Email
Gov't POC (Technical
Resource)
Gov't POC (Business
Resource)
Contractor/ Industry POC


Task Description
 Appendix B
Key Milestones                                           Date




Government Deliverables
Data



Hardware/ Software
Products



Shaded fields are calculated fields - no entry allowed
 Appendix are
Shaded fieldsB calculated fields - no entry allowed
Budget Information                              FY 04       FY 05       FY 06       FY 07       FY 08       FY 09             04-09 Total
Total Costs                                           0.0         0.0         0.0         0.0         0.0         0.0                                 0.0
Non-Procurement $
Civil Service FTEs                                                                                                                                        0
Total Non-Procurement Costs                           0.0         0.0         0.0         0.0         0.0         0.0                                 0.0
   CS Salary (Direct) $k                                                                                                                              0.0
   CS Travel (Direct) $k                                                                                                                              0.0
         Rate and $ Amounts                      $K          $K          $K          $K          $K          $K
   Service Pools                                      0.0         0.0         0.0         0.0         0.0         0.0                                 0.0
   Facility Utilization (see below)                   0.0         0.0         0.0         0.0         0.0         0.0                                 0.0
   Center G&A                                         0.0         0.0         0.0         0.0         0.0         0.0                                 0.0
Procurement
Support Contractor WYEs                                                                                                                                   0
Total Procurement Costs                               0.0         0.0         0.0         0.0         0.0         0.0                                 0.0
   Support Contractor Labor Costs $k                                                                                                                  0.0
   Support Contractor Travel (Direct) $k                                                                                                              0.0
   ODC                                                                                                                                                0.0
   Material                                                                                                                                           0.0
   Equipment                                                                                                                                          0.0
Facility Utilization (must enter rate and $K - this data will roll-up to Facility Utilization row above. Please note that $K must be a total - the rate
Facility modify the total.)
will not Name                     Location       $K         $K          $K         $K          $K       $K
                                                                                                                                                      0.0
                                                                                                                                                      0.0
                                                                                                                                                      0.0
                                                                                                                                                      0.0
 Appendix B

Budget Information                             FY 10        FY 11       FY 12       FY 13       FY 14       FY 15             04-15 Total
Total Costs                                           0.0         0.0         0.0         0.0         0.0         0.0                                 0.0
Non-Procurement $
Civil Service FTEs                                                                                                                                        0
Total Non-Procurement Costs                           0.0         0.0         0.0         0.0         0.0         0.0                                 0.0
   CS Salary (Direct) $k                                                                                                                              0.0
   CS Travel (Direct) $k                                                                                                                              0.0
         Rate and $ Amounts                      $K          $K          $K          $K          $K          $K
   Service Pools                                      0.0         0.0         0.0         0.0         0.0         0.0                                 0.0
   Facility Utilization (see below)                   0.0         0.0         0.0         0.0         0.0         0.0                                 0.0
   Center G&A                                         0.0         0.0         0.0         0.0         0.0         0.0                                 0.0
Procurement
Support Contractor WYEs                                                                                                                                   0
Total Procurement Costs                               0.0         0.0         0.0         0.0         0.0         0.0                                 0.0
   Support Contractor Labor Costs $k                                                                                                                  0.0
   Support Contractor Travel (Direct) $k                                                                                                              0.0
   ODC                                                                                                                                                0.0
   Material                                                                                                                                           0.0
   Equipment                                                                                                                                          0.0
Facility Utilization (must enter rate and $K - this data will roll-up to Facility Utilization row above. Please note that $K must be a total - the rate
will not Name
Facility modify the total.)       Location       $K         $K          $K         $K          $K       $K
                                                                                                                                                      0.0
                                                                                                                                                      0.0
                                                                                                                                                      0.0
                                                                                                                                                      0.0

Comments:
Field   Field Title
   1.   GTA Number


   2.   Date
   3.   Attachments
   4.   GTA Title
   5.   WBS Title & Number
   6.   Points of Contact




   7.   Task Description




   8.   Schedule and Key Milestones


   9.   Government Deliverables/ Data

   10. Government Deliverables/
       Hardware/Software Products
   12. Total Costs

   13. Direct Costs $
       ( CIVIL SERVANTS )
   14. Other Direct Cost $
       ( SUPPORT CONTRACTORS )

   15. Facility Utilization


   16. Comments/Notes
Instruction
Number assigned by the government organization. Revisions to the GTA should
be indicated by using a letter following the number (i.e. GTA-ED15-014A)

Date the GTA was originated or revised
Indicate the number of attachments that will be provided through ProjectLink.
Provide a brief title for the GTA
Select from the drop-down box the appropriate WBS number and title.
• Name of the government and contractor/industry point of contact for this task
• Location government and contractor/industry point of contact is assigned to (i.e.,
MSFC, JSC, KSC, etc.)
• Internal organization code (i.e., UP01) or address of the Government point of
contact
• Area code plus 7 digit phone number of point of contacts
• Fax number of the point of contacts
• E-mail address of the point of contacts
Describe the task that is to be performed by the government organization. If task
description is containted in an external document, that document may be uploaded
into ProjectLink as a reference object to the GTA Form. Please note in the Task
Description field that a file has been attached.
Provide schedule and key milestones that will directly affect this task ( add
attachment if needed ). Please notate in Key Milesone area that attachment as
been uploaded.
The Government Furnished Data that will be provided as a results of this activity(
i.e., reports,etc)
The Government Furnished Equipment that will be developed as a part of this task

Total of all Direct and Indirect Costs.
Show by FY$ amounts and Grand Total amount
Provide civil service workforce levels and civil service travel. Provide full cost rates
required by this task
Provide cost of all support contractors salary & travel, material, consumables, …
required by this task

Provide facility name and/or description to be used. Provide the location of the
facility (bldg name , no. …) requested and the rate and total $k for the planned
number of days, hrs. the facility will be utilized
Provide comments or note that would be beneficial or it can be used as a
continuation
                1
              1.1
1.1.1
1.1.1.1
1.1.1.1.1
1.1.1.1.2
1.1.1.1.3
1.1.1.1.4
1.1.1.1.5
1.1.1.1.6
1.1.1.1.6.1
1.1.1.1.6.2
1.1.2
1.1.2.1
1.1.2.1.1
1.1.2.1.1.1
1.1.2.1.1.2
1.1.2.1.1.3
1.1.2.1.2
1.1.2.2
1.1.2.3
1.1.3
1.1.3.1
1.1.3.1.1
1.1.3.1.2
1.1.3.2
1.1.3.3
1.1.4
1.1.5
1.1.5.1
1.1.5.1.1
1.1.5.1.2
1.1.6
1.1.6.1
1.1.6.1.1
1.1.6.1.2
1.1.6.1.3
1.1.6.1.3.1
1.1.6.2
1.1.6.2.1
1.1.6.2.2
1.1.6.2.3
1.1.6.3
1.1.6.4
1.1.6.5
              1.2
1.2.1
1.2.1.1
1.2.1.1.1
1.2.1.1.2
1.2.1.1.2.1
1.2.1.2
1.2.1.3
1.2.2
1.2.2.1
1.2.2.1.1
1.2.2.1.2
1.2.2.1.3
1.2.2.2
1.2.2.2.1
1.2.2.2.1.1
1.2.2.2.2
1.2.2.2.2.1
1.2.2.2.2.1.1
1.2.2.2.2.1.2
1.2.2.2.2.1.3
1.2.2.2.2.1.4
1.2.2.2.2.1.5
1.2.2.2.2.2
1.2.2.2.2.2.1
1.2.2.2.2.2.2
1.2.2.2.2.2.3
1.2.2.2.2.2.4
1.2.2.2.2.2.5
1.2.2.2.2.3
1.2.2.2.2.3.1
1.2.2.2.2.3.2
1.2.2.2.3
1.2.2.2.3.1
1.2.2.2.3.1.1
1.2.2.2.3.1.2
1.2.2.2.3.1.3
1.2.2.2.3.1.4
1.2.2.2.3.1.5
1.2.2.2.3.1.6
1.2.2.2.3.1.7
1.2.2.2.3.2
1.2.2.2.3.2.1
1.2.2.2.3.2.2
1.2.2.2.3.2.3
1.2.2.2.3.2.4
1.2.2.2.3.2.5
1.2.2.2.3.2.6
1.2.2.2.3.2.7
1.2.2.2.3.3
1.2.2.2.3.3.1
1.2.2.2.3.3.2
1.2.2.2.3.3.3
1.2.2.2.3.3.4
1.2.2.2.3.3.5
1.2.2.2.3.3.6
1.2.2.2.3.3.7
1.2.2.2.3.3.8
1.2.2.2.3.3.9
1.2.2.2.3.3.10
1.2.3
1.2.3.1
1.2.3.1.1
1.2.3.1.2
1.2.3.2
1.2.3.2.1
1.2.3.2.1.1
1.2.3.2.2
1.2.3.2.2.1
1.2.3.2.2.2
1.2.3.2.3
1.2.3.2.4
1.2.3.2.4.1
1.2.3.2.4.2
1.2.4
1.2.4.1
1.2.4.1.1
1.2.4.2
1.2.4.2.1
1.2.4.2.1.1
1.2.4.2.1.1.1
1.2.4.2.1.1.2
1.2.4.2.2
1.2.4.2.2.1
1.2.4.2.2.2
1.2.4.2.3
1.2.4.2.3.1
1.2.4.2.3.2
1.2.4.2.3.3
1.2.4.2.4
1.2.5
1.2.5.1
1.2.5.1.1
1.2.5.2
1.2.5.2.1
1.2.5.2.1.1
1.2.5.2.2
1.2.5.2.3
1.2.5.2.4
             1.3
1.3.1
1.3.1.1
1.3.1.1.1
1.3.1.1.2
1.3.1.1.3
1.3.1.1.4
1.3.1.1.4.1
1.3.1.2
1.3.1.2.1
1.3.1.2.2
1.3.1.2.3
1.3.1.2.4
1.3.1.2.5
1.3.1.2.5.1
1.3.1.3
1.3.1.4
1.3.1.5
1.3.1.6
1.3.1.7
1.3.1.7.1
1.3.1.7.2
1.3.1.7.3
1.3.1.8
1.3.1.8.1
1.3.1.8.2
1.3.1.8.3
1.3.1.8.4
1.3.1.8.5
1.3.1.8.6
1.3.1.8.7
1.3.2
1.3.2.1
1.3.2.1.1
1.3.2.1.2
1.3.2.1.3
1.3.2.1.4
1.3.2.1.5
1.3.2.1.5.1
1.3.2.1.5.1.1
1.3.2.1.5.2
1.3.2.1.5.2.1
1.3.2.1.5.2.2
1.3.2.1.5.3
1.3.2.1.5.3.1
1.3.2.1.5.3.2
1.3.2.2
1.3.2.2.1
1.3.2.2.2
1.3.2.2.3
1.3.2.2.4
1.3.2.2.5
1.3.2.2.5.1
1.3.2.2.5.1.1
1.3.2.2.5.1.2
1.3.2.2.5.1.3
1.3.2.2.5.1.4
1.3.2.2.5.2
1.3.2.2.5.2.1
1.3.2.2.5.2.2
1.3.2.2.5.2.3
1.3.2.2.5.2.4
1.3.2.2.5.3
1.3.2.2.5.3.1
1.3.2.2.5.4
1.3.2.2.5.4.1
1.3.2.2.5.4.2
1.3.2.2.5.5
1.3.2.2.5.5.1
1.3.2.2.5.5.2
1.3.2.2.5.5.3
1.3.2.2.5.5.4
1.3.2.2.5.5.5
1.3.2.2.5.5.6
1.3.2.3
1.3.2.3.1
1.3.2.3.2
1.3.2.3.3
1.3.2.3.4
1.3.2.3.5
1.3.2.3.5.1
1.3.2.3.5.1.1
1.3.2.3.5.1.2
1.3.2.3.5.1.3
1.3.2.3.5.1.4
1.3.2.3.5.2
1.3.2.3.5.2.1
1.3.2.4
1.3.2.4.1
1.3.2.4.2
1.3.2.4.3
1.3.2.4.4
1.3.2.4.5
1.3.2.4.5.1
1.3.2.4.5.2
1.3.2.5
1.3.2.6
1.3.2.7
1.3.2.8
1.3.2.9
1.3.2.10
1.3.2.11
1.3.2.12
1.3.3
1.3.3.1
1.3.3.1.1
1.3.3.1.2
1.3.3.1.3
1.3.3.1.3.1
1.3.3.2
1.3.3.3
1.3.3.4
1.3.3.5
1.3.3.6
1.3.3.7
1.3.3.8
1.3.4
1.3.4.1
1.3.4.1.1
1.3.4.1.2
1.3.4.1.3
1.3.4.1.3.1
1.3.4.2
1.3.4.3
1.3.4.4
1.3.4.5
1.3.5
1.3.5.1
1.3.5.1.1
1.3.5.1.2
1.3.5.1.2.1
1.3.5.1.2.2
1.3.5.1.2.3
1.3.5.1.3
1.3.5.1.3.1
1.3.5.1.3.2
1.3.5.1.3.3
1.3.5.1.3.4
1.3.5.1.3.5
1.3.5.1.4
1.3.5.1.4.1
1.3.5.1.4.2
1.3.5.1.4.3
1.3.5.1.4.4
1.3.5.1.4.5
1.3.5.1.4.6
1.3.5.1.4.7
1.3.5.1.4.8
1.3.5.1.4.9
1.3.5.1.5
1.3.5.1.5.1
1.3.5.1.5.2
1.3.5.1.5.3
1.3.5.1.5.4
1.3.5.1.5.5
1.3.5.1.6
1.3.5.1.6.1
1.3.5.2
1.3.5.2.1
1.3.5.2.2
1.3.5.2.2.1
1.3.5.2.2.1.1
1.3.5.2.2.1.2
1.3.5.2.2.1.3
1.3.5.2.2.2
1.3.5.2.3
1.3.5.2.4
1.3.5.3
1.3.5.3.1
1.3.5.3.2
1.3.5.3.3
1.3.5.4
1.3.5.4.1
1.3.5.4.2
1.3.5.4.3
1.3.5.4.4
1.3.5.4.5
1.3.5.4.6
1.3.5.4.6.1
1.3.5.4.6.2
1.3.5.4.6.3
1.3.5.4.6.4
1.3.5.5
1.3.5.5.1
1.3.5.5.2
1.3.5.5.3
1.3.5.5.4
1.3.5.5.5
1.3.5.5.6
1.3.5.5.6.1
1.3.5.5.6.2
1.3.5.5.6.3
1.3.5.5.6.4
1.3.5.5.6.5
1.3.5.5.6.6
1.3.5.5.6.7
1.3.5.5.6.8
1.3.5.5.6.9
1.3.5.5.6.10
1.3.5.5.7
1.3.5.5.8
1.3.5.5.8.1
1.3.5.5.8.2
1.3.5.5.8.3
1.3.5.5.8.4
1.3.5.5.8.5
1.3.5.5.8.6
1.3.5.5.8.7
1.3.5.5.8.8
1.3.5.5.8.9
1.3.5.5.8.10
1.3.5.5.8.11
1.3.5.5.8.12
1.3.5.5.8.13
1.3.5.5.9
1.3.5.5.9.1
1.3.5.5.9.2
1.3.5.5.9.3
1.3.5.5.10
1.3.5.5.11
1.3.5.5.11.1
1.3.5.5.11.2
1.3.5.5.11.3
1.3.5.5.11.4
1.3.5.5.12
1.3.5.6
1.3.5.6.1
1.3.5.6.2
1.3.5.6.3
1.3.5.7
1.3.5.7.1
1.3.5.7.2
1.3.5.7.3
1.3.5.7.4
1.3.5.7.5
1.3.5.8
1.3.5.8.1
1.3.5.8.2
1.3.5.8.3
1.3.5.8.4
1.3.5.8.5
1.3.5.9
1.3.5.9.1
1.3.5.9.2
1.3.5.9.3
1.3.5.9.4
1.3.5.9.5
1.3.5.10
1.3.5.11
1.3.5.11.1
1.3.5.11.2
1.3.6
1.3.6.1
1.3.6.1.1
1.3.6.1.1.1
1.3.6.1.1.2
1.3.6.1.1.3
1.3.6.1.1.4
1.3.6.1.1.5
1.3.6.1.1.6
1.3.6.1.1.7
1.3.6.1.1.8
1.3.6.1.2
1.3.6.1.2.1
1.3.6.1.2.2
1.3.6.1.2.3
1.3.6.1.2.4
1.3.6.1.2.5
1.3.6.1.2.6
1.3.6.1.2.7
1.3.6.1.3
1.3.6.1.4
1.3.6.1.4.1
1.3.6.2
1.3.6.2.1
1.3.6.2.1.1
1.3.6.2.1.1.1
1.3.6.2.1.1.2
1.3.6.2.1.1.3
1.3.6.2.1.1.4
1.3.6.2.1.1.5
1.3.6.2.1.2
1.3.6.2.1.2.1
1.3.6.2.1.2.2
1.3.6.2.1.2.3
1.3.6.2.1.2.4
1.3.6.2.1.2.5
1.3.6.2.1.2.6
1.3.6.2.1.2.7
1.3.6.2.1.3
1.3.6.2.1.4
1.3.6.2.1.5
1.3.6.2.1.5.1
1.3.6.2.1.5.2
1.3.6.2.1.5.3
1.3.6.2.1.5.4
1.3.6.2.1.5.5
1.3.6.2.2
1.3.6.3
1.3.6.3.1
1.3.6.3.1.1
1.3.6.3.1.2
1.3.6.3.1.3
1.3.6.3.1.4
1.3.6.3.1.5
1.3.6.3.1.6
1.3.6.3.1.7
1.3.6.3.1.8
1.3.6.3.1.9
1.3.6.3.2
1.3.6.4
1.3.6.4.1
1.3.6.4.1.1
1.3.6.4.1.1.1
1.3.6.4.1.1.2
1.3.6.4.1.1.3
1.3.6.4.1.1.4
1.3.6.4.1.1.5
1.3.6.4.1.1.6
1.3.6.4.1.1.7
1.3.6.4.1.1.8
1.3.6.4.1.1.9
1.3.6.4.1.1.10
1.3.6.4.1.2
1.3.6.4.1.2.1
1.3.6.4.1.2.2
1.3.6.4.1.2.3
1.3.6.4.1.2.4
1.3.6.4.1.3
1.3.6.4.2
1.3.6.4.2.1
1.3.6.4.2.2
1.3.6.4.2.3
1.3.6.4.2.4
1.3.6.4.3
1.3.6.5
1.3.6.5.1
1.3.6.5.1.1
1.3.6.5.1.2
1.3.6.5.1.2.1
1.3.6.5.1.2.2
1.3.6.5.1.2.3
1.3.6.5.1.2.4
1.3.6.5.1.2.5
1.3.6.5.1.2.6
1.3.6.5.1.3
1.3.6.5.2
1.3.6.6
1.3.6.6.1
1.3.6.6.2
1.3.6.6.3
1.3.6.6.4
1.3.6.7
1.3.6.7.1
1.3.6.7.1.1
1.3.6.7.1.1.1
1.3.6.7.1.1.1.1
1.3.6.7.1.1.1.2
1.3.6.7.1.1.1.3
1.3.6.7.1.1.2
1.3.6.7.1.1.2.1
1.3.6.7.1.1.2.2
1.3.6.7.1.1.2.3
1.3.6.7.1.1.2.4
1.3.6.7.1.1.3
1.3.6.7.1.1.4
1.3.6.7.1.1.5
1.3.6.7.1.1.6
1.3.6.7.1.2
1.3.6.7.1.2.1
1.3.6.7.1.2.2
1.3.6.7.1.2.3
1.3.6.7.1.2.4
1.3.6.7.1.2.4.1
1.3.6.7.1.2.4.2
1.3.6.7.1.2.5
1.3.6.7.1.2.5.1
1.3.6.7.1.2.5.2
1.3.6.7.1.2.5.3
1.3.6.7.1.2.6
1.3.6.7.1.2.7
1.3.6.7.1.3
1.3.6.7.1.4
1.3.6.7.1.5
1.3.6.7.2
1.3.6.8
1.3.6.8.1
1.3.6.8.2
1.3.6.8.3
1.3.7
1.3.7.1
1.3.7.1.1
1.3.7.1.2
1.3.7.1.3
1.3.7.1.3.1
1.3.7.2
1.3.7.3
1.3.7.3.1
1.3.7.3.2
1.3.7.3.3
1.3.7.3.4
1.3.7.4
1.3.7.5
1.3.7.6
1.3.8
1.3.8.1
1.3.8.1.1
1.3.8.1.1.1
1.3.8.1.1.2
1.3.8.1.1.3
1.3.8.1.1.4
1.3.8.1.1.5
1.3.8.1.1.6
1.3.8.1.1.7
1.3.8.1.1.8
1.3.8.1.1.9
1.3.8.1.2
1.3.8.1.3
1.3.8.1.3.1
1.3.8.2
1.3.8.2.1
1.3.8.2.1.1
1.3.8.2.1.1.1
1.3.8.2.1.1.2
1.3.8.2.1.1.3
1.3.8.2.1.1.4
1.3.8.2.1.1.5
1.3.8.2.1.1.6
1.3.8.2.1.2
1.3.8.2.1.2.1
1.3.8.2.1.2.2
1.3.8.2.1.2.3
1.3.8.2.1.2.4
1.3.8.2.1.2.5
1.3.8.2.1.2.6
1.3.8.2.1.3
1.3.8.2.1.3.1
1.3.8.2.1.3.2
1.3.8.2.1.3.3
1.3.8.2.1.3.4
1.3.8.2.1.3.5
1.3.8.2.1.4
1.3.8.2.1.4.1
1.3.8.2.1.4.2
1.3.8.2.1.4.3
1.3.8.2.1.4.4
1.3.8.2.1.4.5
1.3.8.2.1.5
1.3.8.2.1.5.1
1.3.8.2.1.5.1.1
1.3.8.2.1.5.1.2
1.3.8.2.1.5.2
1.3.8.2.1.5.2.1
1.3.8.2.1.5.2.2
1.3.8.2.2
1.3.8.2.2.1
1.3.8.2.2.2
1.3.8.2.2.3
1.3.8.2.3
1.3.8.2.3.1
1.3.8.2.3.2
1.3.8.2.3.3
1.3.9
1.3.9.1
1.3.9.1.1
1.3.9.1.2
1.3.9.1.3
1.3.9.1.3.1
1.3.9.2
1.3.9.3
1.3.9.4
1.3.9.5
1.3.9.6
1.3.9.7
1.3.9.8
1.3.9.9
1.3.9.10
1.3.10
Orbital Space Plane (OSP) Program
OSP Program Office
Program Office
Program Office Operations
Program Management
Program Office Support/PMS, ODIN, Office Funds, Office SC, Program Reserves
Procurement Support
Reserved
NRA Proposal Cycle I & II
Program Office Overhead
HQ Taxes
Institutional (service pools, etc)
Program Control (MSFC)
Program Control Operations
Program Control Office Management (includes Procurement Specialists)
Program Scheduling
Program Information Technology (IT)
Process Systems Integration
Program Control Office Support/PMS, ODIN, Office Funds, Office SC
Configuration & Data Management
Program Risk Management
Chief Engineer (MSFC) and Mission Success Office (UP10)
Chief Eng Office Operations
Chief Eng Office Management (includes Procurement Specialists)
Chief Eng Office Support/PMS, ODIN, Office Funds, Office SC
Program Special Studies
Mission Success Office Operations
Reserved
Requirements Management (MSFC)
Req Management Office Operations
RM Office Management (includes Procurement Specialists)
Req Management Office Support/PMS, ODIN, Office Funds, Office SC
Acquisition Management (MSFC)
Acq Management Office Operations
Acq Mgmt Office Management
Acq Mgmt Office Support/PMS, ODIN, Office Funds, Office SC
Acq Mgmt Office Overhead
AMO Institutional (Service pools, etc)
Procurement
Logistics
Training and Evaluation
SEB Activities
Management and Operations
Policy
Technical
Flight Demos & Experiment Integration (MSFC)
Flight Demos Office Operations
FD Office Management
FD Office Management and Support (PMS, ODIN, Office Funds, Office SC, Reserves, S&MA, C&DM)
FD Office Overhead
FD Institutional (service pools, etc)
FD Office Design Insight
FD Office Design Participation
X-37 Project (MSFC)
X-37 Prime Contracts
NAS8-2070 -- Boeing Prime
NCC8-190 -- Boeing Cooperative Agreement
NLS Launcher Contract
X-37 Project Management, Design Participation, Insight and GTAs
X-37 Project Management
X-37 Project Mgmt and Support (PMS, ODIN, Proj Funds, Proj SC, Reserves, S&MA, C&DM)
ALTV
ALTV Design Insight
DFRC
GSFC
JSC
LARC
MSFC
ALTV Design Participation
DFRC Flight Test Support (Insight)
GSFC IV&V
JSC
LARC
MSFC
ALTV GTAs
8-30 GTA -- DRFC X-37 ALTV Flight Test Support (Direct)
8-30 GTA -- LaRC PETI 5 Body Flap & Speed Brake Engine Support
OV
OV Design Insight
ARC
DFRC
GSFC
JSC
KSC
LARC
MSFC
OV Design Participation
ARC
DFRC Flight Test Support (Insight)
GSFC
JSC
KSC
LARC
MSFC
OV GTAs
8-30 GTA -- ARC DurAFRSI TPS Experiment Test Panel
8-30 GTA -- ARC RSI Leading Edge TPS Experiment
8-30 GTA -- ARC TPS Arcjet Testing in Support of X-37
8-30 GTA -- DRFC X-37 OV Flight Test Support Insight
8-30 GTA -- LaRC Aerodynamic Heating Database Development
8-30 GTA -- LaRC Metallic TPS Experiment Test Panel
8-30 GTA -- LaRC Aerodynamics Database Development
8-30 GTA -- LaRC Design, Fabricate, and Test C/SiC Control Surface
8-30 GTA -- LaRC Testing (LaRC/AFRL-VAS)
8-30 GTA -- LaRC Flight Test
DART Project (MSFC)
DART Prime Contracts
OSC Prime Contractor
SELVS KSC Pegasus Launch Services
DART Project Management, Design Participation, Insight and GTAs
DART Project Management
DART Project Mgmt and Support (PMS, ODIN, Proj Funds, Proj SC, Reserves, S&MA, C&DM)
DART Design Insight
GSFC
MSFC
DART Design Participation
DART GTAs
8-30 GTA -- MSFC Advanced Video Guidance Sensor
8-30 GTA -002 -- MSFC T--Vac and Balance Testing
PAD Abort Project (JSC)
PAD Prime Contracts
Lockheed Martin Prime Contractor
PAD Project Management, Design Participation, Insight and GTAs
PAD Project Management
PAD Project Mgmt and Support (PMS, ODIN, Proj Funds, Proj SC, Reserves, S&MA, C&DM)
JSC PM and Support
MSFC PM and Support
PAD Design Insight
JSC
MSFC
PAD Design Participation
JSC and WSTF
MSFC (WSMR and YUMA)
SSC
PAD GTAs
Kistler Project (MSFC)
Kistler Prime Contracts
Kistler Prime Contractor
Kistler Project Management and Design Insight
Kistler Project Management
Kistler Project Mgmt and Support (PMS, ODIN, Proj Funds, Proj SC, Reserves, S&MA, C&DM)
Kistler Design Insight
Kistler Design Participation
Kistler GTA's
OSP Program Integration (MSFC)
OSP Integration Office
Program Integration Office Management and Support
OSP Integration Office Management (includes S&MA, C&DM and Procurement Specialists)
OSP Integration Office Support/PMS, ODIN, Office Funds, Office SC, Reserves
Cost Credibility Analysis
OSP Office Overhead
OSP Office Institutional (service pools, etc)
AAS Office Operations (MSFC)
AAS Office Management (includes S&MA, C&DM and Procurement Specialists)
AAS Office Support/PMS, ODIN, Office Funds, Office SC, Reserves
Design Participation
Design Insight
AAS GTAs
Reserved
AAS Prime Contract -- CSI
AAS Prime Contract -- Andrews
AAS Prime Contract -- Lockheed
AAS Prime Contract -- Boeing
Other Centers and Agencies
DARPA
GSFC -- Project Insight (Wallops)
Facility COF
Concept Assessment and Optimization (LaRC)
CAO Management (includes S&MA, C&DM and Procurement Specialists)
Requirements Definition/Validation
Concept Assessment
Concept Optimization
Design Participation (with Contractor)
Space Flight Definition/Validation
Experimental Studies
Systems Contract Management
Boeing Project Office Operations
Boeing Project Office Management (includes S&MA, C&DM and Procurement specialists)
Boeing Project Office Support/PMS, ODIN, Office Funds, Office SC, Reserves
Boeing Project Design Participation
Boeing Project Design Insight
Boeing Project GTAs
Boeing Project GTAs: MSFC
8-30 Boeing GTA-1 -- MSFC - Wind Tunnel Testing
Boeing Project GTAs: LaRC
8-30 Boeing GTA-2 -- LaRC - Wind Tunnel Testing
8-30 Boeing GTA-5 -- LaRC - System Engineering and Architecture Definition
Boeing Project GTAs: ARC
8-30 Boeing GTA-3 -- ARC - Wind Tunnel Testing
8-30 Boeing GTA-4 -- ARC - IVHM
Lockheed Project Office Operations
Lockheed Project Office Management (includes S&MA, C&DM and Procurement specialists)
Lockheed Project Office Support/PMS, ODIN, Office Funds, Office SC, Reserves
Lockheed Project Design Participation
Lockheed Project Design Insight
Lockheed Project GTAs
Lockheed Project TA-1 GTAs: MSFC
8-30 LM GTA -- MSFC GN&C Vehicle Architecture Analysis (TSTO)
8-30 LM GTA -- MSFC TSTO Wind Tunnel Tests
8-30 LM GTA -- MSFC OSP Wind Tunnel Tests
8-30 LM GTA -- MSFC Simulation Analysis and Vehicle Support for OSP
Lockheed Project TA-1 GTAs: LaRC
8-30 LM GTA -- LaRC Separation Studies for OSP from ELV During Abort
8-30 LM GTA -- LaRC Hypersonic Wind Tunnel Test for OSP
8-30 LM GTA -- Hypersonic Aeroheating Wind Tunnel Test
8-30 LM GTA -- Large Scale Subsonic / Transonic Wind Tunnel Test
Lockheed Project TA-1 GTAs: GRC
8-30 LM GTA -- GRC Configuration Analysis and Flight Sciences
Lockheed Project TA-1 GTAs: KSC
8-30 LM GTA -- KSC Architecture & Business Case Def
8-30 OSC GTA -- KSC Operations Support
Lockheed Project TA-1 GTAs: ARC
8-30 LM GTA -- ARC CTV Aero and Aerothermal Analysis
8-30 LM GTA -- ARC TSTO Systems Analysis
8-30 LM GTA -- ARC TSTO CFD Analysis
8-30 LM GTA -- ARC CFD Optimization Study
8-30 LM GTA -- ARC CFD Analysis of OSP Vehicle During Abort & Reentry
8-30 LM GTA -- ARC Aerodynamic Performance Constraints (APC) Definition
Northrop Grumman/Orbital (NGO) Project Office Operations
NGO Project Office Management (includes S&MA, C&DM and Procurement specialists)
NGO Project Office Support/PMS, ODIN, Office Funds, Office SC, Reserves
NGO Project Design Participation
NGO Project Design Insight
NGO Project GTAs
NGO Project TA-1 GTAs: JSC
8-30 OSC GTA -- JSC TA1-02 CFD Analysis
8-30 OSC GTA -- JSC TA1-03 GN&C
8-30 OSC GTA -- JSC TA1-04 Adaptive GN&C, and Autopilot Definition Support
8-30 OSC GTA -- JSC TA1-09 Crew Transfer/Crew Rescue Entry Trajectory Support
NGO Project TA-1 GTAs: LaRC
8-30 OSC GTA -- LaRC TA1-01 Aeroheating and Shock Impingement CFD Modeling and Analysis
OSP Prime Contract Project Office Operations
OSP Prime Contract Project Office Management (includes S&MA, C&DM and Procurement specialists)
OSP Prime Contract Project Office Support/PMS, ODIN, Office Funds, Office SC, Reserves
OSP Prime Contract Project Design Participation
OSP Prime Contract Project Design Insight
OSP Prime Contract Project GTAs
OSP GTA-1 (TBD)
OSP GTA-2 (TBD)
OSP Prime Contract
Reserved
Boeing OSP Contract
LM OSP Contract
NG OSP Contract
Reserved
Reserved
OSC OSP Contract
Systems Engineering & Integration
Sys Engineering Office Operations
Sys Eng Office Management (includes S&MA, C&DM and Procurement specialists)
Sys Eng Office Support/PMS, ODIN, Office Funds, Office SC, Reserves
Sys Eng & Int Office Overhead
Sys Eng & Int Institutional (service pools, etc)
SE&I Task Management
Requirements, Interface Management, and Verification & Validation
Engineering Practices and Procedures
Technical Integration
Systems Trade Studies and Analyses
Advanced Development Needs
IVHM
System Operations Integration Element
Operations Office Operations
Ops Office Management (includes S&MA, C&DM and Procurement specialists)
Ops Office Support/PMS, ODIN, Office Funds, Office SC, Reserves
Operations Office Overhead
Operations Institutional (service pools, etc)
Operations Integration
OSP Integrated System Logistics
Operations Concept Development
Mission Integration and Operation
Spacecraft Integration Element
Management, Integration and Control
Program Management Support (PMS)
Management
Project Management
Administrative Support
Reserve
Project Integration
Management and Insight
Spacecraft Products Assessments
Risk Management
Schedule Integration and Management
Statistical Measurement
Project Control
Management & Insight
Financial/Earned Value Management
Resources Management
Configuration/Data Management
External Reviews and Audits
IT and Web Management
Procurement
ODIN
Public Outreach
Safety and Mission Assurance (S&MA)
SR&QA Management and Insight
Risk Analysis
Requirements Development
Product Assurance
Vehicle S&MA Engineering
Spacecraft Office Ovehead
Spacecraft Institutional (service pools, etc)
Crew Survival & Escape
Crew Survival & Escape Task Management & Insight
CS&E Analysis and Trades
Boeing GTA ( GTA 9-jsc-01)
CES Data Review and Analysis
Crew Suit Analysis
Automated Touchdown With Hazard Avoidance
Integrated Trade Study Assessments
Architecture and OSP Integration
Test & Demonstration
Human Engineering
Requirements
NASA Standard 3000, Man-Systems Integration Standards, Tailoring
Human Rating
Systems Engineering & Integration
SE&I Task Management & Insight
Architecture Definition and Technical Integration
Requirements, Interface Management, & Verification
Engineering Practices and Procedures
Integrated Systems Analysis
Specialty Engineering
Integrated Logistics
Environments
Materials/processes
EEE Parts
Vehicle Engineering
Management & Task Integration
Vehicle Level Design & Analyses
Lessons Learned
Resolution of Technical Issues
Advanced Development
Airframe/Flight Systems
Management and Insight
Aerosciences
Structures
Mechanisms
Propulsion
Electrical Power & Lighting (EPS)
Thermal Protection System (TPS)
Active Thermal Control System (ATCS)
Passive Thermal Control System (PTCS)
Environmental Control & Life Support (ECLS)
Reserved
Avionics and FSW
Management and Insight
Guidance, Navigation, & Contrl (GN&C)
Communications & Tracking (C&T)
Command & Data Handling (C&DH)
Displays & Controls
Integrated Vehicle Health Management (IVHM)
Software Design
Avionics Software Integration
Instrumentation, Paramenters, & Command List
Flight Software Production
Hardware/Software Integration
Ironbird/Trainer
Independent Validation &Verification (IV&V)
Crew Systems
Management and Insight
Flight Crew Systems
Crew Health Care Systems
Crew Escape System
Vehicle Integration
Management & Insight
Requirements & Interfaces
Acceptance
Integration, Assembly, & Check-Out
Sustaining Engineering
Vehicle Flight Test
Vehicle Flight Test Management
Atmospheric Flight Test
Space Flight Test
Boeing Vehicle
Management
Spacecraft Integration
Task Integration & Risk Management
Architecture Integration
Integrated Test and Verification
Lockheed Martin Vehicle
Management
Spacecraft Integration
Task Integration & Risk Management
Architecture Integration
Integrated Test and Verification
Northrup Grumman/Orbital Sciences Vehicle
Management
Spacecraft Integration
Task Integration & Risk Management
Architecture Integration
Integrated Test and Verification
Spacecraft Facility Development (Gov't Infra--design, enhance, construct, operate & maintain facilities)
NASA Unique Closeout
NASA Unique Closeout Other than Prime
NASA Unique Closeout - Prime
Launch Site and Landing Integration and Operations
Launch Site & Landing Integration Office Operations
Launch Site Integ Office Management (includes S&MA, C&DM and Procurement specialists)
Project Mgmt
Business and Financial Mgmt
Resource Mgmt
Configuration Mgmt
Admin Briefs/Reporting (etc)
Procurement
Risk Mgmt
Scheduling
Safety & Mission Assurance
Ground Operations
Facilities
Turnaround Processing
Launch Operations
Landing & Recovery
Ground Support Equipment
Logistics
Launch Site Integ Office Support/PMS, ODIN, Office Funds, Office SC, Reserves
Launch Site Integ Office Overhead
Launch Site Integ Institutional (service pools, etc)
Systems Engineering
Systems Engineering Integration
Requirements Definition
Subsystem and Lower
Processing and Operations
GSE
Facilities
SS Interface Test and Validation
Trade Studies/Infrastructure/Logistics Analysis
Toxic vs. Non Toxic Propellant
Horizontal vs. Vertical Processing
Range Tracking and Air Space Transportation Trades
OSP System Elements Transportation Trades
Ground Cooling Method
OSP Communications Requirements
Other
Cost Analysis
Advanced Technology Needs
Spacecraft Architecture Concept Development and Assessment
IVHM
Avionics/Electrical
Fluids
Mechanical
Operations and GSE
Trade Studies and Analysis Procurements
Integrated Logistics Support
Logistics and Material Support
Logistics Support Analysis
Depot Operations
Safety and Environmental
Maintenance
Material Support
Technical Data
Transportation
Engineering
Reliability/Maintainability/Quality Assurance
Logistics Procurement
GSE Design and Production
OSP and Integration GSE
Mechanical Access System (OSP Processing)
Crew Access Systems (Landing)
Maintenance Access Hardware
Lifting Devices
Fluid & Gas Servicing Equipment
New Transporter to/from Off-Line Facility
Portable Purge System
Fixed ECS
Fixed Cooling System
Portable Cooling System
Hazardous Gas Detection System
Electrical GSE Systems
Power Supplies
Cabling
Avionics (GPC, GNS, etc.)
Other Electrical
Initial GSE Spares
ISS Integrated Testing GSE
Hardware
Software
Reconfigure Emulators
Cabling
GSE Design and Production Procurements
Launch Site Facility Development (Gov't Infra--design, enhance, construct, operate & maintain facilities)
Launch and Landing Site Facilities, Studies and Development
Facility Concept Studies
Facility Development
OSP Processing and Servicing Facility
Payload (Cargo) Processing and Servicing Facility
Logistics Facilities
Landing Facilities
Infrastructure
Other Facilities Design
Facilities O&M
Facilities, Studies and Development Procurements
Information Tech Support
Launch IT Support
Landing IT Support
Processing IT Support
OSP IT Security
Launch and Landing Operations
Launch and Landing Operations Analysis and Integration
Processing
Assembly and Integration
Discipline Engineering Support
Assembly and Integration Operations
ISS Integration Testing
Ground Processing and Servicing (Vehicle)
Pre-flight/turnaround processing & ground support
Ground Transportation
Air Transportation
IVHM
Storage Operation
Cargo Processing
Landing and Recovery Operations/ Post Landing Servicing
Alternate Landing Site (ALS)
Operations Planning and Support
Pre- Planning for Processing
Operations and Schedule Development Process
Systems Engineering
GSE Sustaining
Sustaining Engineering
Maintenance
Range Support
Traffic Control
Flight Control
Weather
Launch Operations Support
Mission Operations Support
Ground Based Network (KSC only, GSFC will also have FTEs)
Depot Operations
Launch/Landing Site Support (Public Affairs Office, security, training, badging, )
Launch and Landing Operations Integration Procurements
Disposal
Hazardous Materials (Hazmat)
Demilitarization (Demil)
Transport
ISS Integration Outside OSP Contracts
ISS Integration Office Operations
ISS Integ Office Management (includes S&MA, C&DM and Procurement specialists)
ISS Integ Office Support/PMS, ODIN, Office Funds, Office SC, Reserves
ISS Integ Office Overhead
ISS Integ Institutional (service pools, etc)
ISS/OSP Spacecraft Studies and Analysis
ISS Hardware
Mating Element
Mating Mechanism
Node Mods
Communications, Tracking, & Monitoring
ISS FSW
ISS Operations Integration
ISS Requirements
Launch Services Operations Outside OSP Contracts
Launch Services Integration and Studies
OSP Launch Services Integration Office Management
Project Mgmt
Business and Financial Mgmt
Resource Mgmt
Configuration Mgmt
Admin Briefs/Reporting (etc)
Procurement
Risk Mgmt
Safety and Mission Assurance
Scheduling
Launch Services Operations Office Support/PMS, ODIN, Office Funds, Office SC, Reserves
Launch Services Operations Office Overhead
Launch Services Institutional (service pools, etc)
ELV Launch Services Operations
ELV Launch Services Program
Atlas V Development
Studies/Preliminary Analysis
Reliability Improvements
Mission Unique Mods
Process Modifications
LV Certification/Qualification Assessment
Pad Mods
Delta IV Development
Studies/Preliminary Analysis
Reliability Improvements
Mission Unique Mods
Process Modifications
LV Certification/Qualification Assessment
Pad Mods
Atlas Mission Integration (Launch Service ATP thru Launch)
Integrated Stack Analyses
Spacecraft Interface Engineering
Readiness reviews
Launch Operations
Post flight mission analysis
Delta Mission Integration (Launch Service ATP thru Launch)
Integrated Stack Analyses
Spacecraft Interface Engineering
Readiness reviews
Launch Operations
Post flight mission analysis
Government Independent Analysis
Atlas V
Preflight Independent Mission analyses (trajectory, controls, software IV&V, etc)
Postflight Independent Analyses
Delta IV
Preflight Independent Mission analyses (trajectory, controls, software IV&V, etc)
Postflight Independent Analyses
Atlas V Procurements
Atlas V Feasibility Study
ELV support to OSP concepts on Atlas V
ELV Modeling Support for Atlas V
Delta IV Procurements
Delta IV Feasibility Study
ELV support toOSP concepts on Delta IV
ELV Modeling Support for Delta IV
Mission and Flight Operations
Mission and Flight Operations (MFO) Office
MFO Office Management (includes S&MA, C&DM and Procurement Specialists)
MFO Office Support/PMS, ODIN, Office Funds, Office SC
MFO Office Overhead
MFO Institutional (service pools, etc)
Mission Operations
Flight Operations
Training
Network
Flight Crew Operations
Flight Facility
Medical Operations and Flight Medicine
ISS Operations Integration
Crew Survival and Escape
FSD Demo (TBD)
Advanced Space Technology Program (ASTP) Type 1   Attachments
Advanced Space Technology Program (ASTP) Type 2           0
Advanced Space Technology Program (ASTP) Type 3           1
Technology Maturation Program (TMP) Type 4                2
Technology Maturation Program (TMP) Type 5                3
Technology Maturation Program (TMP) Type 6                4
Attachments

				
DOCUMENT INFO
Shared By:
Categories:
Stats:
views:90
posted:3/14/2010
language:English
pages:43