Status report of ZH Study

Reviews
Shared by: armedman1
Stats
views:
2
rating:
not rated
reviews:
0
posted:
12/9/2008
language:
English
pages:
0
Status report of ZH Study Jan. 31. 2008 ILC Physics Study WG Meeting Hiroaki Ono Nippon Dental University School of Life Dentistry at Niigata Jan. 31. 2008 Single Higgs Study 1 Current status  Mh=120GeV mode is studied using realistic PFA, fixing difference between cheated PFA and realistic PFA, evis, mass etc. – Zhnnh (Ecm=350GeV, Mh=120GeV) 2j – Zhqqh (Ecm=350GeV, Mh=120GeV) 4j  Analizing HWW mode of Zhqqh qqWW – Ecm=350GeV, Mh=160, 140, 120GeV – qq+qq’qq’(6j), qq+lnqq’ (l+4j), qq+lnln (2l+2j) Jan. 31. 2008 Single Higgs Study 2 Comparison of realistic/cheated PFA @ Mh=120GeV Higgs mass and visible energy in Zhnnh Real : Mh=118.5 GeV Cheat : Mh=119.1 GeV Satellite hits is included now, but still some difference between them. Now investigating this reason. Jan. 31. 2008 Single Higgs Study 3 ZhqqWW channel at Mh=160GeV   6jets events are analized with cheated PFA. Chose best combination by  c2=(Mij-MZ)2/s2Z+(Mkl-MW)2/s2W+(Mmn-MW)2/s2W Cheated PFA Mz(Mjj) Mh(MjjMjj) Jan. 31. 2008 Single Higgs Study 4 Next steps Investigate the difference of realistic and cheated PFA.  Check Zhqqh, hWW mode study is ongoing and check the difference between 120GeV and 160 GeV.  Background process is concerning and analyzing in cheat and real for WW/ZZ.  Jan. 31. 2008 Single Higgs Study 5 Branching ratios of SM higgs  Zh standard model branch – Mh=120GeV : bb=68%, WW=13%, ZZ=1% – Mh=140GeV : bb=34%, WW=49%, ZZ=7%  – Mh=160GeV : bb=4%,  WW=91%, ZZ=4% bb WW ZZ   cc  Z    gg   6 Jan. 31. 2008 Single Higgs Study

Related docs
STATUS QUO REPORT
Views: 45  |  Downloads: 2
MONTHLY ECONOMIC STATUS REPORT
Views: 67  |  Downloads: 1
Status-of-Activities
Views: 7  |  Downloads: 1
Status Update
Views: 40  |  Downloads: 1
Status Report
Views: 6  |  Downloads: 0
Status Report of the
Views: 0  |  Downloads: 0
Status Report on
Views: 175  |  Downloads: 6
Status Report
Views: 0  |  Downloads: 0
Status Report
Views: 11  |  Downloads: 0
Status Report
Views: 0  |  Downloads: 0
Status Report
Views: 2  |  Downloads: 0
premium docs

Other docs by armedman1
Operating Agreement - Wilson Equity Office LLC
Views: 420  |  Downloads: 15
Dream Psychology
Views: 840  |  Downloads: 90
2007 Inst W-2G and 5754 (PDF) Instructions
Views: 262  |  Downloads: 1
Users marcsigal Desktop term papers TermPap
Views: 285  |  Downloads: 0
Overtime Policy Guidance
Views: 866  |  Downloads: 18
NOTICE OF APPEAL TO A COURT OF APPEALS
Views: 311  |  Downloads: 0
Sample Articles of Organization for a Delaware LLC
Views: 2563  |  Downloads: 75
Board Resolution For Appointment of Attorneys
Views: 309  |  Downloads: 5
cd160
Views: 132  |  Downloads: 0
Board Resolution Filling Vacancy on Board
Views: 276  |  Downloads: 6