					                                    ATLANTIC BOULEVARD
                                     CMS PRIORITY LIST

PRIOR-           PROJECT & LIMITS               TYPE OF WORK            IN THOUSANDS
ITY #                                                                   OF DOLLARS **

   1       Banks Rd Intersection           Provide a WBRT             ROW=TBD,CST= 175
  2        A-1-A to University             Transit Corridor           Cap=440 Op= 300
                                           Route (112 hr              Total 740
                                           service, 2 buses)
  3        Neighborhood Transit            Transfer Facility          Total   =   45
           Center at Dixie Hwy
  4        TDM Kiosk at Pompano            Establish TDM Kiosk        Total = 35
           Beach City Hall
  5        Andrews Ave. Ext.               Analyze Intersection      FDOT Traffic
                                           and recommend             Operations
                                           improvements
  6        NElSE 4 St to US I              Resurfacing, bike         Seek funding and
           (WPI 41 10786)                  lane addition and         accelerate
                                           access management         implementation

  *        US 1 Intersection               Conceptual Design         FDOT Traffic
                                           Study by FDOT             Operations
  *        SR 7 Intersection               Major Intersection        ROW= 190,CST= 151
           WPI 41 10904 (TIP #80)          Improvements              Total = 341
  *        A-1-4 to University             On-street transit         Cap=200,
                                           facility improvements     total =200
                                           (bus shelters)            40 shelters,
                                                                     jishelter
  *        TDM measures along              Major employers to        GCCS Operating
           corridor                        be contacted by GCCS      Budget
                                           in order to develop
                                           specific TDM programs
  *        Powerline Intersection          ART-PLAN analysis          CMS Operating
                                           with latest data           Budget
  *        1-95 to Cypress                 ART-PLAN Analysis          CMS Operating
           Rd (NE 18 Ave)                  with recently com-         Budget
                                           pleted improvements
                                           ART-PLAN Analysis          CMS Operating
                                           with completed             Budget
                                           improvements at
                                           Riverside
                                           Intersection
       *   Project underway and/or to be implemented as schqduled on T.1.P
      "" Preliminary estimate. 1995 dollars
                                 BROWARD BOULEVARD
                                  CMS PRIORITY LIST
PRIOR-         PROJECT &: LIMITS              TYPE OF WORK            IN THOUSANDS
ITY #                                                                 OF DOLLARS **

         SR 7 and W. 31 Ave              Signal Re-timing           Traffic Engineering
         intersections                   andlor re-phasing          Operation Budget
         1-95 Interchange,               Intermodallaccessl         Total   =   TBD
         Tri-Rail Station,               circulation study
         Park-and-Ride lot,
         HOV lane to downtown
         SR 7 Intersection               Provide RT lanes           ROW = TBD
                                         on Broward Blvd            CST = 350
         US 1 Intersection               NB dual left turn
                                         lanes
         31 Ave intersection             Add exclusive              ROW = TBD
                                         WBRT lane                  CST = 175
         W. 7 Ave Intersection           NB dual left               ROW =TBD
                                                                    CST= 175
         Support Downtown TMA            Provide technical          CMS Operating
                                         assistance for             Budget
                                         implementation of
                                         TMA projects
         W. 7 Ave to US 1                Provide improved           Traffic Engineering
                                         signing for                Operating Budget
                                         pedestrian/bicycle
                                         safety
         Downtown Ft. Lauderdale         Pedestrian                 Total = 15
                                         Circulation Study
         Route P (Weston to              Implement Route P          Cap=440, Op=300
         Downtown)                       with 30-minute             Total = 740
                                         headway service
         "Bikes on Buses" Program        Provide bicycle            Total = 7.2
         for Routes 22 and 9             racks on all buses         12 buses: .6irack
                                         serving those routes
         West Broward Terminal           Provide Tri-Rail
         to Tri-Rail                     feeder bus service




    *    Project underaay andlor to be implemented as scheduled on T I P
   "*    Prel~mlnary estimate, 1995 dollars
                                  BROWARD BOULEVARD
                                   CMS PRIORITY LIST

PRIOR-         PROJECT & LIMITS              TYPE OF WORK            IN THOUSANDS
ITY #                                                                OF DOLLARS **


         West Broward Terminal          Improve passenger          TBD
                                        anlenities
                                        Safety Review by           FDOT traffic
                                        FDOT traffic               operations
                                        operations

         Resurfacing between            Resurface and re-          PE=166, CST 2,303
         1-95 and US 1                  stripe including           Total = 2,469
         (WPI 41 10798)                 bicycle lanes

         Resurfacing east of            Resurface and re-          PE=207, CST=1,927
         SR 7 to 1-95                   stripe bicycle lanes       Total = 2,134
         (WPI 41 10742)
         Downtown Trolley               Irnprove trolley           TMA Operating
                                        shuttle service            Budget

         Corridor-wide                  Monitor system             BCT Operating
         neighborhood lllinibus         effectiveness              BudgetIFDOT
         feeder service                                            service dev. grant

         W. 719 Ave Corridor            Follow-up on 719 Ave       CMS Operating
         Connector                      Connector Study            Budget

         EB to NB flyover               ART-PLAN Analysis          CMS Operating
         ramp at 1-95                   with completed             Budget
         (U'PI 4140867)                 improvements

         NW 25 and 27 Ave                Access Management         FDOT traffic
         intersections                   Review by FDOT.           operations
                                         Enforcement needed




         Project underway andlor to be Implemented as scheduled on T I P
    **   Prel~minary estimate, 1995 dollars
                                 COCONUT CREEK PARKWAY
                                    CMS PRIORITY LIST
PRIOR-          PROJECT & LIMITS               TYPE OF WORK            IN THOUSANDS
ITY #                                                                  OF DOLLARS **

 1        Access Management               Begin Study                FDOT Traffic
          Study SR 7 to Lyons Rd                                     Operations
2         Powerline Rd                    EBRT lane                  ROW =TBD
          Intersection                                               CST= 175
3         Transit Corridor Service        Provide 30-minute          Cap=220, OP=150
          (Dixie Hwy to SR 7)             service along              Total=370 (1 bus)
                                          corridor
4         "Bikes on Buses" Program        Provide bicycle racks      Total = 7.2
          for Routes 3 1 and 83           on all buses               12 buses; .6/rack
                                          serving those routes
5         BCC No. Campus and              Provide crossings,
          Coconut Crk High School         facilities and
          bicyclelpedestrian              amenities
          facilities
6         TDM Kiosk at BCC                Establisll TDM Kiosk       Total = 35
          North Campus
7         Continuity of sidewalks         Provide continuity
          and bicycle lanes               on a priority basis
          along corridor                  including Lyons Rd
                                          bike path connector
8         ART-PLAN Analysis for           Obtain new turning         B.C. Traffic Engin-
          corridor                        movement counts for        eering Operating
                                          the Powerline Rd,          Budget
                                          Banks Rd and Margate
                                          Apts. intersections
*         SR 7 to Powerline Rd            Median Revisions
          (WPI 41 10840)
*         TDM measures along              Major employers            GCCS Operating
          corridor                        contacted by GCCS in       Budget
                                          order to develop
                                          specific TDM programs




      *   Project underway andlor to be implemented as scheduled on T.I.P.
     "*   Preliminary estimate. 1995 dollars
                                     COMMERCIAL BLVD
                                     CMS PRIORITY LIST
PRIOR-          PROJECT & LIMITS               TYPE O F WORK           IN THOUSANDS
ITY #                                                                  O F DOLLARS **

 1        Corridor study                  A multimodal CMS          Total   =   50
                                          corridor study
2         Intersection                    Dual left turn lanes      ROW =TBD
          improvements                    east and westbound        CST=350
          at U.S. 1                       constructed; and          FDOT Traffic
                                          exclusive right turn      OP. Budget
                                          lanes investigated
3         Turnpike Intersection           Provide a slip ramp
                                          from EB Commercial
                                          Blvd to SB Turnpike
3-A       Bicyclelpedestrian              Study the possibility     FDOT Planning
          facilities at Turnpike          of sidewalks and          Budget
          Overpass                        bicycle facilities
4         NW 64 Avenue                    Provide an exclusive      ROW =TBD
          intersection                    WBRT lane                 CST= 175
5         Resurfacing from                Resurfacing and bike      CST     =   1,720
          Powerline to NE 15 Ave          lane addition
          (WPI 41 10817)                  Advance to FY 96197
6         Improve transit service         Reduce headway from       Cap=220, OP=150
          for bus route 55                40 to 30 minutes          Total=370 (1 bus)
7         Bus turnouts                    Construct bus             CST = 100
          along corridor                  turnout bays              10 bays; l0lbay
8         Bus shelters along              Construct shelters        Cap =200, Total =200
          corridor                        and provide proper        40 shelters;
                                          signage for Tri-Rail      5ishelter
9         Continuity of sidewalks         Construct sidewalks
          from University Dr to           at gaps
          Andrews Ave
10        Signage on Commercial           Install signs             BC Traffic Engin-
          Blvd indicating location                                  eering Operating
          of Cypress Creek Inter-                                   Budget
          modal Park-and-Ride
          facility
*         Evaluation Study of the         Evaluate project           FDOT Traffic
          SCATS de~nonstration                                       Operations Budzet
          project SR 7 to Turnpike

      "   Projcct underway and/or to be implemented as scheduled on T.1.P
      ** Preliminary estimate, 1995 dollars
                                   COMMERCIAL BLVD
                                   CMS PRIORITY LIST
PRIOR-         PROJECT & LIMITS                TYPE OF WORK            IN THOUSANDS
ITY #                                                                  O F DOLLARS **


*        EB and WB exclusive              Review ongoing study       CMS Operating
         RT lanes at Prospect             to determine if            Budget
         Rd intersection                  warranted
*        Safety and access                Review ongoing study       CMS Operating
         management study                 recommendations            Budget
         at Andrews Ave
*        Access management                Median revisions           CST    =   63
         improvements between
         Cypress Rd and US 1
         (WPI 41 10907)
*        Resurfacing between              Resurfacing and bike      CST = 525
         Cypress Rd and US 1              lane addition, side-
         (WPI 4 11-0803)                  walks and street
                                          lighting
*        Resurfacing between              Resurfacing, bicycle      CST     =   650
         US 1 and Intracoastal            lanes, signal upgrade
         (WPI 4 110642)                   and street lighting
*        CSX Railroad Crossing            Resurface and repave      CST = 58
         Improvements                     railroad crossing
         (WPI 41 10850)
*        Sidewalk enhancements           h~liscellaneous            Total   =   133
         from Prospect Rd to             construction
         Powerline
         (WPI 31 10989)
*        Park-and-Ride facility          Identify location          Cost= 110
         near SR 7iCommercial            and construct park-        60 spaces,
         Blvd intersection               and-ride lot               2.2Ispace
*        Park-and-ride facility          Examine possible           BCT and FDOT
         at Andrews Ave                  removal of P&R             Operating Budget
                                         facility
*        TDM measures along              Contact major              GCCS Operating
         corridor                        employers in order         Budget
                                         to develop specific
                                         TDM programs
*        hqaintenance of bicycle         Keep bike lanes            FDOT Operating
         lanes along corridor            free of debris             Budget

     *   Project underway andior to be implemented as scheduled on T.I.P.
    **   Prelin~inaryestimate, 1995 dollars
                                  COMMERCIAL BLVD
                                  CMS PRIORITY LIST
PRIOR-         PROJECT & LIMITS               TYPE OF WORK             IN THOUSANDS
ITY #                                                                  O F DOLLARS **


*        ART-PLAN analysis for           Collect and use            BC Traffic Engin-
         I-95/US 1 segment               actual system green        eering Operating
                                         return time at             Budget
                                         Cypress Rd




     *   Project uriderway andlor to be implemented as scheduled on T.1.P
    **   Preliminary estimate. 1995 dollars
                                      COPANS ROAD
                                    CMS PRIORITY LIST
PRIOR-         PROJECT & LIMITS                 TYPE OF WORK         IN THOUSANDS
ITY #                                                                OF DOLLARS **

         Traffic signal system             Add segment to
         coordination for                  Group 7 of BC
         SR 7JPowerline segment            system expansion
                                           (WPI 41 10953)
         Access management study           Review access           B.C.T.E.
         between Andrews Ave Ext.          management issues       Operations
         and CSX tracks                    along segment           Budget

         Intersection improvement          Eastbound dual lefts    CST   =   350
         at Andrews Ave Ext.               and increase WBL
                                           turn lane storage
         Intersection improve-             Add a WBRT lane         CST = 175
         ments at NW 42 Ave
         Provide express bus               Link three transit      Cap =440, OP=300
         service along corridor            centers (Pompano        Total = 740
                                           Square, Margate
                                           Terminal and
                                           Coral Square Mall)
         "Bikes on Buses" Program          Provide bicycle         Total = 3.6
         for Route 83                      racks on all buses      6 buses; .6irack
                                           serving that route
         Modify Tri-Rail feeder            Provide 2-way           Cap =220, OP = 150
         bus route 33                      feeder bus service      Total = 370
                                           between University Dr
                                           and Tri-Rail Station
         6 LD from Blount Rd to            Add 2 lanes to          CST   =   3,982
         Powerline Rd and inter-           segment and provide
         section improvements at           intersection
         Lyons Rd and SR 7                 improvements
         (TIP #99)
*        Intersection improvement          Additional turn         CST = 700
         at Andrews Ave Extension          and through lanes
*        TDM measures along                Major employers to      GCCS Operating
         corridor                          be contacted by         Budget
                                           GCCS in order to
                                           develop specific
                                           TDhl programs


    * Project underway andlor to be implemented as scheduled on T.1.P
    **   Prclirninary estimate, 1995 dollars
                                   HOLLYWOOD BOULEVARD
                                     CMS PRIORITY LIST
PRIOR-         PROJECT & LIMITS                 TYPE OF WORK          IN THOUSANDS
ITY #                                                                 OF DOLLARS **

         Corridor Study                     A multimodal CMS        Total   =   50
                                            Corridor Study
                                            U.S. 1 to FL. TPK.
         Johnson Street as               Study the potential        BC Traffic
         parallel facility               of Johnson St as a         Engineering
                                         parallel facility          Operating
                                         to relieve congestion      Budget
         Signal timing and               Optimize signal            BC Traffic
         phasing at 28 Ave               timing and phasing         Engineering
                                                                    Operating Budget
         Intersection                    Examine the need for       FDOT Traffic
         improvement at                  additional through         Operations
         28 Ave                          lane after signal          Budget
                                         timing optimization
         Intersection                    WBRT lane                  CST = 175
         improvements at SR 7            Addition of turn
                                         and through lanes
                                         on SR 7
         BCT Route 7 headway             Reduce headway from        CAP= 1320,OP=450
         improvement                     20 to 10 minutes           Total = 1770
                                         during peak hours
         BCT route 7                     Extend route to            CAP =440,OP = 300
         improvements                    Hiatus Rd and              Total = 740
                                         study buses with
                                         smaller turning
                                         radius
         Improve transit service         Provide Hollywood          CityICounty
         toifrom neighborhoods           community bus              funding
                                         service
         Improve pedestrian1             Promote the use of         BC Transp.Plaming
         bicycle facilities              Johnson St bicycle         Div. Operating
         along corridor                  lane as parallel           Budget
                                         facility
         Pedestrian overpass             Feasibility study          Total   =   9.5
         at 1-95                         for pedestrian
                                         overpass



   *     Project underway andlor to be implemented as scheduled on T.1.P
   * * Preliminary estimate. 1995 dollars
                                HOLLYWOOD BOULEVARD
                                  CMS PRIORITY LIST
PRIOR-         PROJECT & LIMITS               TYPE OF WORK            IN THOUSANDS
ITY #                                                                 OF DOLLARS **

*        Hollywood Tri-Rail              Study the                  BCT
         Station improvements            possibility for            Operating
                                         access improvements        Budget
                                         and shuttle service
                                         to the station
*        1-95 interchange                Analysis conducted         FDOT Traffic
         section study                   by FDOT Traffic            Operating
                                         Operations Systems         Budget
                                         Group
*        SR 7 to 1-95                    Re-run ART-PLAN            CMS Operating
         ART-PLAN Analysis               after obtaining            Budget
                                         turning movement
                                         counts at Park Rd
                                         and 56 Ave
*        1-95 Interchange                ART-PLAN analysis          CMS Operating
                                         with recently              Budget
                                         completed
                                         improvements
*        TDM measures along              Major employers to         GCCS Operating
         corridor                        be contacted by            Budget
                                         GCCS in order to
                                         develop specific
                                         TDM programs




    *    Project underway andior to be implemented as scheduled on T.I.P.
    "*   Preliminary estimate, 1995 dollars
                                    JOHNSON STREET
                                   CMS PRIORITY LIST
PRIOR-         PROJECT & LIMITS             TYPE OF WORK           IN THOUSANDS
ITY #                                                              OF DOLLARS **

         Corridor traffic signal       Add Johnson St to         BC Traffic
         coordination                  Broward County's          Operating
                                       coordinated traffic       Budget
                                       signal system
         Dixie Hwy signal              Optimize signal           BC Traffic
         timing                        timing                    Engineering
                                                                 Operating
                                                                 Budget
         Intersection                  Construct additional      Total = 1,400
         improvements                  through lanes at
         along corridor                University Dr.. SR 7,
                                       56 Ave, and 46 Ave
         BCT Route 9 headway           Reduce headway from       CAP=220
         inlprove~nent                 40 to 20 minutes          OP=150
                                       from U.S. 1 to            Total = 370
                                       BCC Central
         Bus bays along                Construct bus turn        CST = 80
         corridor                      out bays, priority        8 bays; lotbay
                                       near Memorial
                                       Hospital
         Pedestrian                    Construct sidewalks       Total =89
         improvements
         from 20 Ave to 30 Rd
         (WPI 4 120340)
         Bicycle laneslpath            Build bicycle lanes/
         continuity along              paths to fill in
         corridor                      gaps
         TDhI measures along           Major employers to        GCCS Operating
         corridor                      be contacted by GCCS      Budget
                                       in order to develop
                                       specific TDM programs
         ART-PLAN Analysis             Re-analyze after          CMS Operating
         of corridor                   SR 7 improvements         Budget
                                       are programmed in TIP




    * Project underway andlor to be implemented as scheduled on T.I.P.
   ** Preliminary estimate, 1995 dollars
                                 OAKLAND PARK BLVD
                                  CMS PRIORITY LIST
PRIOR-         PROJECT & LIMITS               TYPE OF WORK             IN THOUSANDS
ITY #                                                                  OF DOLLARS **

1        Review Oakland Park             Support implemen-          CMS Operating
         Blvd Corridor Study             tation of                  Budget
                                         strategies recom-
                                         mended by study
2        Intersection                    EB and WB dual             CST = 522
         improvements at US 1            lefts; SB right
         (WPI 41 10895)                  turn. Advance
         (TIP #218)                      construction to
                                         FY 96-97
*        Median revisions east           Revise median              Underway
         and west of 1-95
         (WPI 41 10839)
*        Safety improvements             Dual left turns            CST = 1,485
         1-95 to NE 2nd Ave              at Powerline Rd
         (WPI 41 10903)                  and Andrews Ave
         (TIP #124)                      and median revisions
*        Intersection                    EB and WB dual             ROW =983,UTL=40
         improvements at NW 3 1 Ave      lefts                      CST=531,
         (WPI 41 10877)                                             Total = 1,554
         (TIP #140)
*        Intersection                    Re-time signals,           ROW = 1,147
         imnrovements                    Resurfacing,               CST = 650
         at i l Ave                      and curb cut ramps         Total - 1,797
         (WPI 41 10901)
*        Resurfacing from                Resurfacing                CST = 833
         NW 3 1 Ave to east              and giving
         of 1-95                         consideration to
         (WPI 4110338)                   bike lanes
         (TIP #15)




    "    Project underway and/or to be implemented as scheduled on T.I.P.
    "*   Preliminary estimate. 1995 dollars
                                   PEMBROKE ROAD
                                  CMS PRIORITY LIST
PRIOR-         PROJECT & LIMITS               TYPE OF WORK            IN THOUSANDS
ITY #                                                                 O F DOLLARS **

 1       Signal optimization at          Study optimization        BC Traffic
         University Drive                results to determine      Engineering
                                         if additional             Operating
                                         through lanes SB          Budget
                                         and WB are needed
2        Signal optimization             Study signal              BC Traffic
         at Palm Ave                     optimization to           Engineering
                                         determine if              Operating
                                         ART-PLAN inputs           Budget
                                         are correct
3        PD&E Study                      Examine the addition      Total = 928
         Flamingo Rd to                  of lanes (2 to 4)
         Douglas Rd
4        Transit improvements            Realign and extend        CAP = 440
         along corridor                  Route 5 from SR 7         OP = 300
                                         to U.S. 1                 Total = 740
5        Sidewalk continuity             Construct sidewalks
         along corridor                  to fill in gaps
+        Road widening W of              Add lanes to              ROW = 4,000
         SR 7 to 1-95                    make it 6 LD              CST = 5,919
         (WPI 41 103 18)                                           Total = 9,919
         (TIP 55145)
*        ART PLAN Analysis               Re-run ART-PLAN with      CMS Operating
         SR 7% University Dr             road widening             Budget
                                         improvementi as per
                                         WPI4110818
*        TDM measures along              Major employers to        GCCS Operating
         corridor                        be contacted by GCCS      Budget
                                         in order to develop
                                         specific TDM programs




      * Project underway and!or to be implemented as scheduled on T.I.P.
     *' Preliminary estimate. 1995 dollars
                                   ROCK ISLAND ROAD
                                   CMS PRIORITY LIST

PRIOR-         PROJECT & LIMITS                TYPE OF WORK            IN THOUSANDS
ITY #                                                                  OF DOLLARS **

 1        Transit improvement             Introduce Route "Mu        CAP = 660
          along corridor                  with 30 minute             OP = 450
                                          headway                    Total = 1,110
*         Road widening between           Add 2 lanes and            CST = 4,930
          Commercial & Oakland            reconstruct 2 lanes
          Park Blvd                       to make it 4 LD
          (TIP #64)
*         Study Kimberly Blvd             Re-run ART-PLAN            BC Traffic
          Intersection                    and determine if NB        Engineering
                                          and SB right turn          Operating
                                          lanes are possible1        Budget
                                          needed
*         ART-PLAN Analysis               Re-run ART PLAN with       CMS Operating
          Commercial to                   new improv~mentsand        Budget
          Atlantic                        turning movement
                                          counts at Bailey Rd,
                                          NcNab Rd and
                                          Kimberly Blvd




     *    Project underway and/or to be implemented as scheduled on T.I.P.
     *"   Preli~ninaryestimate. 1995 dollars
                                      SAMPLE ROAD
                                    CMS PRIORITY LIST

PFUOR-         PROJECT & LIMITS                TYPE OF WORK            IN THOUSANDS
ITY #                                                                  OF DOLLARS **

         Traffic signal                  Bring coordinated          B.C. Traffic Eng.
         Coordination from Lyons         signal system              Operating Budget
         to Powerline Rd                 on-line
         Signal timing and               Re-time and re-phase      B.C. Traffic Eng.
         phasing investigation           if needed                 Operating Budget
         at Powerline Rd
         intersection
         Access management and           Perform study             FDOT Traffic
         safety study between            including 1-95 ramp       Operations Budget
         1-95 and Military Trail         and signage
         Intersection improvement        Resurfacing and           PE=75, CST=537
         at Powerline Rd                 bike lane                 Total =612
         (WPI 41 10761)                  consideration.
         (TIP #36)                       Advance to
                                         FY 96/97
         Resurfacing from                Repairing and             PE=72, CST=528
         F L TPK to west                 resurfacing with          Total = 660
         of 1-95                         bike lane
         (WPI 41 10937)                  consideration.
         (TIP #98)                       Advance to
                                         FY 96/97
         Intersection                    Increase WB left          Total    =   80
         improvement at NW 5 Ave         turn storage
         Transit improvements            Implement Route "B"       Cap=660,
         corridor-wide                   with 30-minute            OP=450,
                                         headway                   Total = 1,110
         Tri-Rail feeder bus             Modify feeder route       BCT
         improvements at                 to serve Sample and       Operating
         Pompano Station                 Copans corridors          Budget
                                         exclusively
         TDM Kiosk at the                Establish Kiosk            Total   =   35
         Pompano Outlet Mall




    *    Project underway andlor to be implemented as scheduled on T.1.P
   *"    Preliminary estimate, 1995 dollars
                                       SAMPLE ROAD
                                     CMS PRIORITY LIST

PRIOR-         PROJECT & LIMITS                TYPE OF WORK         IN THOUSANDS
ITY #                                                               OF DOLLARS     **

         Sidewalk continuity             Fill in sidewalk        Include in
         along corridor                  gaps                    programmed
                                                                 repaving and
                                                                 resurfacing
                                                                 Work Program
                                                                 items
         Road widening between           Add 2 lanes to          ROW = 300
         Powerline and Military Tr       make it 6LD             CST = 2041
         (WPI 41 10767)                                          Total = 2,440
         (TIP #113)
         Pompano Beach Tri-Rail          Improve signage
         Station improvements            and access to
                                         the Station
         Park-and-Ride Lot at            Study feasibility
         Pompano Outlet Mall             of Park-and-
                                         Ride lot
         ART-PLAN Analysis from          Collect new turning     B.C. Traffic Eng. and
         Powerline to 1-95               movement counts and     CMS Operating
                                         green return times      Budget
                                         for NW 5th Street
                                         intersection
         TDM lneasures                   Major employers to      GCCS Operating
         along corridor                  be contacted by         Budget
                                         GCSS in order to
                                         develop specific
                                         TDM programs




    * Project underway andlor to be implemented as scheduled on T.I.P.
   "* Preliminary estimate. 1995 dollars
                                      S.R. 7/US 441
                                   CMS PRIORITY LIST
PRIOR-          PROJECT & LIMITS               TYPE O F WORK           IN THOUSANDS
ITY                                                                    O F DOLLARS **

 1        Conceptual design               Begin conceptual          FDOT Traffic
          study at Atlantic               design and purchase       Operations
          Intersection                    ROW if needed
2         Intersection                    Add a NB right            ROW = 190
          improvements at                 turn lane                 CST = 151
          Atlantic Blvd                   (Move construction        Total = 341
          (WPI 41 10904)                  up to 1997)
          (TIP #80)
          Safety project from             Reconstruct SR 7          CST = 473
          No. of Prospect Rd to           with consideration
          Bailey Rd                       for bicycle lanes.
          (WPI 41 10769)                  Advance to
                                          FY 96197
4         Intersection                    Construct                 ROW = 2,927
          improvements at                 improvements              CST = 9,475
          Sunrise Blvd                    including                 Total = 12,402
                                          transitlpedestrian
                                          access

5         Intersection                    Include NB and SB         CST = 350
          improvements                    exclusive right
          at Broward Blvd                 turn lanes as part
                                          of WPI 41 10920
6         Pedestrianibicycle              Provide continuity
          facilities continuity           through existing
          from Riverland Rd to            WPI 4110569 and
          Brorvard Blvd                   WPI 4110920
7         Road widening from              Add lanes to relieve
          Orange Dr to Oakes Rd           southbound maneuver
          (WPI 4 110668)                  within next five
                                          years FY 97198
 8        Intersection                    Construct dual left       Total = 525
          improvements at                 turn lanes on
          Sheridan Street                 Sheridan St and a
          (WPI 41 10568)                  S.B. exclusive
                                          right turn lane
                                          FY 97/98




     "    Project underuay andlor to be implemented as scheduled on T.1 P
     ""   Preliminary estimate, 1995 dollars
                                        S.R. 7/US 441
                                     CMS PRIORITY LIST
PRIOR-          PROJECT & LIMITS                TYPE OF WORK          IN THOUSANDS
ITY #                                                                 OF DOLLARS **
9         Improve Route 18                 Reduce headway from      Cap = 2,200
          transit service                  15 to 10 minutes at      Op = 1,050
          along corridor                   peak hours, and from     Total = 3,250
                                           30 to 20 min. off peak
10        Road widening from Dade          Conclude P.D.&E.         P.E. = 2,000
          County Line to                   phase and pursue         ROW = 123,000
          Griffin Rd                       addition of 2            CST = 20,000
                                           lanes to 6LD within      Total= 145,000
                                           next five years
10-A      Transit facility                 Provide on-street        Total = 600
          improvements along               facilities including     40 bus shelters;
          corridor                         bus turnout bays         Slshelter
                                                                    40 turnout bays;
                                                                    1OIturnout bays
11        Exclusive busltransit            Study feasibility        BCT Operating
          lane feasibility study                                    Budget
          along corridor
12        Transit and pedestrian           Improve pedestrian
          improvements between             access and transit
          Commercial and                   amenities
          Atlantic BIvds
13        Sidewalk continuity              Construct sidewalks
          between Southgate                to fill in gaps
          Blvd and McNab Rd
11        Study need for                   Examine viability 06     BCT Operating
          I-Iollywood Transit              existing Transit         Budget
          Center at SR 7                   Center
*         Road widening from               Ad 2 lanes to            ROW = 300
          No. of Blvd of Champions         make it 6LD              CST = 3,857
          to No. of C-14 Canal                                      Total = 4,157
          including intersection
          improvements at
          Southgate Blvd
          (WPI 41 10637)
          (TIP 146)
*         Intersection                     Review FDOT Traffic      CMS Operating
          improvements at                  Operations Report on     Budget
          Commercial Blvd                  north-south overpass



     * Project underwa). andlor to be implemented as scheduled on T.I.P.
     *-   Preliminary estimate. 1995 dollars
                                      S.R. 7/US 441
                                   CMS PRIORITY LIST
PRIOR-         PROJECT & LIMITS              TYPE OF WORK           IN THOUSANDS
ITY #                                                               OF DOLLARS **

*        Intersection                   NB right turn             CST = 251
         improvements at
         Oakland Park Blvd
         (WPI 41 10972)
*        Road widening from             Add 2 lanes to            ROW = 13,365
         north of Peters Rd             make it 61,D              CST = 4,760
         to No. of Broward Blvd                                   Total = 18,125
         (WPI 41 10920)
         (TIP #276)
*        Road widening between          Add 2 lanes to            ROW = 140
         no. of Riverland Rd to         make it 6LD               CST = 3,259
         no. of Peters Rd                                         Total= 3,399
         (WPI 41 10569)
         (TIP #180)
*        Study feasibility of           Investigate               BCT Operating
         Park-and-Ride lot and          possibility of            Budget
         neighborhood Transit           providing
         Center near Oakland            facilities
         Park Blvd
*        Multimodal transfer and        Corisider                 FDOT Traffic
         connectivity at Oakland        transfer connectivity     Operations Budget
         Park Blvd intersection         by providing
                                        pedestrian/bicycle/
                                        transit access
+        ART-PLAN Analysis              Obtain new turning '      B.C. Traffic Eng.
         between Colnrnercial           movement counts and       and CMS
         arid Atlantic Blvds            glc ratios and            Operating Budget
                                        re-run ART-PLAN
*        TDM measures along             Major employers to        GCCS Operating
         corridor                       be contacted by           Budget
                                        GCCS in order to
                                        develop specific
                                        TDM programs




         Project underway and/or to be in~plemented scheduled on T.I.P.
                                                   as
    ""   Prelirn~naryestrmate. 1995 dollars
                                     SUNRISE BLVD
                                   CMS PRIORITY LIST
PRIOR-          PROJECT & LIMITS              TYPE OF WORK            IN THOUSANDS
ITY #                                                                 OF DOLLARS **

1        Signal re-timing at             Examine need for           B.C. Traffic Eng.
         NE 15 Ave                       signal re-timing           Operating Budget
                                         and/or re-phasing
                                         as per FDOT study
2        Service improvements            Implement 15-minute        CAP = 1,320
         for Route 36                    headway for peak           OP = 45
                                         hour and realign           Total = 1,770
                                         bus route from
                                         Sunset Strip to
                                         Sunrise Blvd
3        Resurfacing, bridge             Widen bridge over          PE = 300
         widening and                    Turnpike, resurface        CST = 2,730
         intersection                    segment including          Total = 3,034
         improvements                    access roads, and
         between University              add right turn lanes.
         and Turnpike                    Move up for
         (WPI 41 10982)                  construction in
                                         FY 96197
4        Intersection                    EB and SB dual lefts       Total   =   484
         improvements at                 and signal re-timing.
         NW 47 Ave                       Advance
         (WPI 41 10878)                  implementation to
         (TIP #141)                      FY 96/97
5        Interchange                     Construction of            ROW = 2,927
         improvements at SR 7            major interchange          CST = 10,475
                                         improvements at            Total = 13,402
                                         intersection.
                                         Include pedestrian/
                                         transit
6        Intersection                    WB exclusive               ROW = TBD
         improvements                    right turn lane            CST = 175
         at Sunset Strip
7        Transit facility                Study feasibility          BCT Operations
         improvenlents                   of queue jumpers           Budget
         corridor-wide                   and far side
                                         turnout bays at
                                         major intersection




    *    Project underway andior to be implemented as scheduled on T.I.P.
    * * Preliminary estimate, 1995 dollars
                                       SUNRISE BLVD
                                     CMS PRIORITY LIST
PRIOR-         PROJECT & LIMITS                TYPE OF WORK             IN THOUSANDS
ITY #                                                                   OF DOLLARS **

         Transit transfer                Provide a park &           Kiosk = 35;
         facility improvements           ride facility and          Park & ride
                                         establish a TDM            facility planning
                                         Kiosk                      with BCT
                                                                    Operating Budget
         Sidewalk continuity             Fill in sidewalk
         between NW 5 St and             gaps
         SR 7
         Expand studies for              Include possibility        FDOT traffic
         Powerline Rd and                of providing RT            operations
         Andrews Ave intersections       lanes on Sunrise
                                         and the need for
                                         signal re-timing
                                         and/or re-phasing
         Expand study underway           Include possibility        FDOT Traffic
         for NW 15 Ave                   of providing EB            Operations
         intersection                    dual lefts and WB          Budget
                                         right turn lanes
         Feasibility study for           Study possibility          FDOT Traffic
         NW 16 Ave intersection          of providing EB            Operations
                                         right turn lane            Budget
         Intersection                    Construct EB and           Total = 513
         improvements                    WB dual left turn
         at NW 31 Ave                    lanes. WB and SB
         (WPI 4110841)                   right turn lanes
         (TIP #330)                      and signal retiming
         Resurfacing from west           Resurface segment          CST = 270
         of SR 7 to 1-95                 and consider
         (WPI 4110941)                   providing bicycle
         (TIP # 43)                      lanes
         TDM measures along              Major employers to         GCCS Operations
         corridor                        be contacted by            Budget
                                         GCCS in order to
                                         develop specific
                                         TDM programs




    "    Project underway andlor to be implemented as scheduled on T.I.P.
   "* Preliminary estilnate, 1995 dollars
                                    SUNRISE BLVD
                                  CMS PRIORITY LIST
PRIOR-         PROJECT & LIMITS                TYPE OF WORK            IN THOUSANDS
ITY #                                                                  OF DOLLARS **

*        ART-PLAN analysis               Re-run ART-PLAN            CMS Operating
         from Turnpike                   with recently              Budget
         to 1-95                         completed
                                         improvements
                                         at 31st and 47th
                                         Avenues
*        ART-PLAN analysls               Re-run ART-PLAN            B.C. Traffic Eng.
         between University Dr           with recently              and CMS Operating
         and Fia. Turnpike               completed                  Budgets
                                         improvements and
                                         traffic volume
                                         recount at Turnpike
                                         access; new green
                                         return timing at
                                         NW 16 St should
                                         be added




    "    Project underway andlor to be implemented as scheduled on T.I.P.
    "" Preliminary estimate. 1995 dollars
                                    UNIVERSITY DRIVE
                                    CMS PRIORITY LIST
PRIOR-          PROJECT & LIMITS                TYPE OF WORK            IN THOUSANDS
ITY #                                                                   O F DOLLARS **

 1        Corridor Study                  A multimodal CMS           Total = 50
                                          Corridor Study
2         Signal timing                   Optimize timing and        B.C. Traffic Eng.
          improvements at                 phasing                    Operating Budget
          Commercial Blvd
          intersection
3         Study 1-595 interchange         Conduct study and          FDOT Traffic
          for potential                   take into account          Operations Budget
          improvements                    access management
                                          and internal
                                          circulation for
                                          adjacent commercial
                                          areas
4         Transit and                     Construct sidewalks        CST = 70
          pedestrian facility             connecting commercial
          enhancement around              areas to transit
          the Broward Mall area           services.
          (WPI 4 110990) (TIP #208)       Advance to FY 96197
          (WPI 4120324) (TIP #326)
5         Sidewalks from Fashion          Construct                  CST = 34
          Mall to St. Tropez              sidewalks
          (WPI 41 10991)
          (TIP # 2 10)
6         Promote TDM through             Vanpool Program,           TMA Operating
          the South Florida               BCT promotions,            Budget
          Educational Center              Tri-Rail feeder,
          (S.F.E.C.) TMA                  establish TDM kiosk.
7         Intersection                    Examine the need for       FDOT Traffic
          improvements at                 improvements               Operations Budget
          Sunset Strip
8         Transit service                 Reduce headway to          CAP = 880
          improvements                    15 minutes in              OP = 300
          on Bus Route 2                  peak direction             Total = 1.180
                                          during peak period
9         Increase bus service            Implement Bus              CAP = 880
          between West Broward            Route "S" on               OP = 300
          Term~nal  and Coral             Pine Island Rd             Total = 480
          Square Mall                     with 30-minute
                                          headway

     *    Project underway and/or to be implemented as scheduled on T.I.P.
     **   Preliminary estimate, 1995 dollars
                                   UNIVERSITY DRIVE
                                   CMS PRIORITY LIST
PRIOR-          PROJECT & LIMITS               TYPE OF WORK             IN THOUSANDS
ITY #                                                                   O F DOLLARS **

         Transit amenities at            Improve amenities          TBD by BCT
         the West Broward
         Transit Terminal
         Bicycle facilities/             Develop bicycle
         amenities at                    facilities at Mall
         Broward Mall
         Bicyclelpedestrian              Add 5' paved
         facilities improvements         shoulder on west
         from Oakland Park to            side and include
         Commercial Blvd                 bicycle lane
         (WPI 41 10977)                  connections as
                                         part of project.
                                         Program construction
                                         funds.
         Neighborhood transit            Investigate                BCT Operating
         center near Commercial          possibility of             Budget
         Blvd intersection               providing transit
                                         center
         Bicycling facilities            Provide bike lanes
         between Peters Rd
         and SR 84
         Transit corridor                Follow study               CMS Operating
         study from Dade                 developments               Budget
         County Line to
         Broward Mall
         Segment improvement             Intersection               CST = 1,073
         SR 84 to Nova Dr                improvements,
         (WPI 41 10998)                  resurfacing and
         (TIP #224)                      signal and sign
                                         up-grades
         Intersection                    NB and EB right            CST = 1,290
         improvements at                 turn lanes,
         SR 84                           SB through lane
         (WPI 41 10887)
         (TIP #188)




    *    Project underway andior to be implemented as scheduled on T.I.P.
   **    Preliminary estimate, 1995 dollars
                                    UNIVERSITY DRIVE
                                    CMS PRIORITY LIST
PRIOR-         PROJECT & LIMITS                 TYPE OF WORK            IN THOUSANDS
ITY #                                                                   OF DOLLARS **

rc       Intersection                     Construct NB left         CST = 548
         improvements                     to NW 2nd St.;
         from Broward to                  dual WB and SB
         Sunrise Blvd                     lefts at NW 5 St.
         (WPI 41 10885)                   NB and SB right
         (TIP # 174)                      turn lanes at
                                          Sunrise Blvd
*        Feasibility study for            Study and identify        BCT Operations
         park & ride lot near             suitable location         Budget
         1-595 interchange                for park & ride lot
*        TDM measures near                Present TDM               GCCS Operating
         Broward Blvd                     strategies and            Budget
         intersection                     enlist employer
                                          support
*        TDM measures near the            Present TDM               GCCS Operations
         Commercial Blvd                  strategies and            Budget
         intersection                     enlist employer
                                          support
*        ART-PLAN analysis                Obtain new green          CMS Operating
         from Broward to                  return time for           Budget
         Oakland Park Blvd                Sunset Strip
                                          intersection and
                                          re-run ART-PLAN




     *   Projsct underway andlor to be implemented as scheduled on T.I.P.
     * * Preliminary estimate, 1995 dollars
                                          U.S. 1
                                    CMS PRIORITY LIST
PRIOR-          PROJECT & LIMITS                TYPE OF WORK             IN THOUSANDS
ITY #                                                                    OF DOLLARS **

 1        Intersection                    Provide EB and WB          CST = 350
          improvements at                 dual left turn lanes       ROW = 2,000
          Commercial Blvd                 and re-time and            In-house FDOT
                                          re-phase signal.           Traffic Operations
                                          Also investigate           Study
                                          right turn lanes
                                          for all approaches
2         Intersection                    Study possible             FDOT Traffic
          improvements                    improvements               Operations
          at NE 62 St                     including SB right
                                          turn lane and
                                          signal re-timing
                                          and phasing
3         Intersection                    Complete conceptual        FDOT Traffic
          improvements                    design study and           Operating
          at Atlantic Blvd                implement                  Budget
                                          recommendations
4         Intersection                    Study the possibility      FDOT Traffic
          improvements                    of intersection            Operating
          at Sample Rd                    improvements               Budget
                                          including exclusive
                                          right turn lanes
                                          improvements
5         "Bikes on Buses"                Provide bicycle racks      Total = 7.2
          Program for Route 10            on all buses serving       12 buses;
                                          this route                 .6/rack

6         Transit service                 Provide 15-minute          CAP = 1,320
          improvements on                 headway during peak        OP = 450
          Bus Route 10                    hours                      Total = 1770
7         Transit improvements            Investigate priority       To be determined
          around Oakland Park             treatment of buses         by BCT
          Blvd intersection               and make improvements
                                          to Regional Transit
                                          Center at Coral Ridge
                                          Mall including
                                          bicyclelpedes~rian
                                          facilities. TDM
                                          Kiosk and park &
                                          ride facility



     *    Project underway andlor to be implemented as scheduled on T.I.P.
     *-   Preliminary estimate. 1995 dollars
                                         U.S. 1
                                   CMS PRIORITY LIST
PRIOR-          PROJECT & LIMITS                TYPE OF WORK             IN THOUSANDS
ITY #                                                                    OF DOLLARS **

8         Transit improvements            Investigate queue          BCT Operating
          at Commercial Blvd              jumpers                    Budget
9         Pedestrian crossing             Examine signal             B.C. Traffic Eng.
          and safety at a11               re-timing                  Operating
          major intersections                                        Budget
          from Sunrise Blvd
          to Sample Rd
10        Improve pedestrian1             Provide sidewalks along
          bicycle facilities              segment extending north
          from Atlantic Blvd              of Sample Rd and
          to Sample Rd                    including pedestrian
                                          crossing on north leg
                                          of NE 14 St
11        TDM Kiosk in                    Establish TDM Kiosk        CST = 35
          Pompano Square Mall
12        Tri-Rail feeder bus             Re-establish Route         BCT
          Route 34                        and improve signing        Operating Budget
                                          and marketing along
                                          route
*         ART-PLAN analysis               Obtain new count           CMS Operations
          from Sunrise to                 information and            Budget
          Oakland Park BLvd               glc ratio and
                                          re-run ART-PLAN
*         ART-PLAN analysis               Obtain on-line green       CMS Operations
          from Oakland Park to            return time, results       Budget
          Con~mercialBlvd                 of FDOT in-house
                                          study, and future
                                          signal timing plans
                                          and re-run ART-PLAN
*         ART-PLAN analysis               Re-run ART-PLAN          CMS Operating
          from Atlantic Blvd              with completed           Budget
          to Sample Rd                    improvements
                                          alone seement
                                                4
                                          ( W P ~ 130256)(~1~#26)
                                          (WPI 41 10936)(TIP #371)
                                          (WPI 41 10755)




      *   Projsct underway andlor to be implemented as scheduled on T.I.P.
     **   Preliminary estimate, 1995 dollars
                                        U.S. 1
                                  CMS PRIORITY LIST
PRTOR-         PROJECT & LIMITS                TYPE OF WORK             IN THOUSANDS
ITY #                                                                   OF DOLLARS **

*        ART-PLAN Analysis               Re-run ART-PLAN with       CMS Operating
         for corridor                    actual green return        Budget
                                         time when signals
                                         are on line and
                                         improvements are
                                         completed
*        TDM measures along              Major employers to         GCCS Operating
         corridor                        be contacted by GCCS       Budget
                                         in order to develop
                                         specific TDM programs




    "    Project underway andlor to be implemented as scheduled on T.I.P.
    **   Preliminary estimate. 1995 dollars
Conclusion


The Broward County Congestion hlanagernent Plan has been presented here as a list of
recommendations and actions that address deficiencies identified through the Congestion
Management System evaluation process. This list was prioritized based on cost-effectiveness and
from feedback obtained through the public participation process The recommendations are listed
by priority, for each conidor considered, and includes a brief description of the project and its' limits,
the type ofwork or improvement required and an estimated cost of the improvement in 1995 dollars
                                                                  possible. This list of evaluated
A responsible agency for implementation lias becn identified ~vhere
and selected congestion nianage~nentstrategies, prioritized for each corridor as reconimendations,
is Broivard County's Conges~ion
                              ?.lanagcment Plan