                 Quality Assurance Plan for <Project Name>
ABOUT THIS DOCUMENT
 This Quality Assurance Plan is to be used by projects to provide more structured and
 more detailed plans for assuring that that the planning, requirements gathering and
 structuring, along with the design, construction, testing and deployment of the product
 fulfill the goals and objectives of the project sponsor and business owners. The plan is
 meant to provide outside eyes into the project and product development process.
 The Quality Assurance process is established to provide objective perspectives on the
 project to overcome the typical project team’s intense involvement that causes them to
 overlook aspects that seem to appear obvious to an outside observer. This is part of
 human nature and does not reflect any fault or aspersions about the professionalism of the
 project team and technical experts.


DEPARTMENT OF INFORMATION TECHNOLOGY QUALITY
ASSURANCE WORKBOOK
 The Department of Information Technology Quality Assurance Template Workbook is
 intended to accompany this template and provide guidance and assistance with the
 completion of the template and the development of quality project management and a
 quality product.


A POLICY STATEMENT
 All project activity is required to include QA activities as an integral part of processes
 used for the development and delivery of products/services. The policy supports:

            Quality Assurance goals must be rational to be accepted and supported.
            Continual improvement effort must be supported.
            All quality control and quality measurement activities are documented.
            A manager or management team will be designated to be responsible for Quality
            Assurance.
           The Project Manager and the Project Sponsor/Business Owners will review
            Quality Assurance activities.
            This project Quality Assurance Plan will be baselined and placed under
            Configuration Management control.
            Quality Assurance will work to foster constructive communication, provide
            feedback to detect and prevent development problems, control risks, discuss
            alternative solutions, and ensure quality is built-in to all products/services.




 Page | 2
             Quality Assurance Plan for <Project Name>


REVISION HISTORY
REVISION NUMBER   DATE               COMMENT
1.0               October 16, 2007   DoIT Project Management Office Revision
2.0
2.1
2.2




  Page | 3
                       Quality Assurance Plan for <Project Name>


                                           Table of Contents
ABOUT THIS DOCUMENT.......................................................................................................................... 2
    DEPARTMENT OF INFORMATION TECHNOLOGY QUALITY ASSURANCE WORKBOOK ...................................................... 2
    A POLICY STATEMENT ..................................................................................................................................... 2
REVISION HISTORY ................................................................................................................................... 3

1. EXECUTIVE SUMMARY ......................................................................................................................... 6
    1.1 THE PROJECT’S QUALITY FOCUS ................................................................................................................... 6
       1.1.1 SPONSOR AND BUSINESS OWNERS PROJECT OBJECTIVES ........................................................... 6
       1.1.2 CRITICAL SUCCESS FACTORS ......................................................................................................... 6
       1.1.3 QUALITY STANDARDS ................................................................................................................... 6
       1.1.4 PROJECT AND PRODUCT REVIEW AND ASSESSMENTS ................................................................. 6
2. SCOPE OF QA PLAN .............................................................................................................................. 6
    2.1 SPECIFIC ACTIVITIES THAT WILL BE REVIEWED BY QA ........................................................................................ 7
       2.1.1 Project Management ................................................................................................................... 7
            2.1.1.1 Specific Project management Activities ................................................................................................ 7
        2.1.2 Requirements Management ........................................................................................................ 7
            2.1.2.1 Specific Requirement management Activities ....................................................................................... 8
        2.1.3 System Development.................................................................................................................... 8
            2.1.3.1 Specific System Development Activities ................................................................................................ 8
        2.1.4 Testing and Acceptance ............................................................................................................... 8
            2.1.4.1 Specific Testing and Acceptance Activities ........................................................................................... 8
        2.1.5 Transition to Operations .............................................................................................................. 9
            2.1.5.1 Specific Transition to Operations Activities ........................................................................................... 9
3.0 QA ORGANIZATIONAL STRUCTURE ..................................................................................................... 9
    2.1 GOVERNANCE STRUCTURE .......................................................................................................................... 9
    2.2 QA TEAM ROLES AND RESPONSIBILITIES .................................................................................................... 10
       2.2.1 Technical Monitor/Senior Management .................................................................................... 11
       2.2.2 Quality Assurance Team............................................................................................................. 12
       2.2.4 Technical Staff ............................................................................................................................ 12
3.0 REQUIRED DOCUMENTATION/ARTIFACTS BY PROJECT PHASE ......................................................... 13
    3.1 INITIATION PHASE ................................................................................................................................... 14
    3.2 PLAN PHASE .......................................................................................................................................... 14
    3.3 DEFINE PHASE ........................................................................................................................................ 15
    3.4 DESIGN PHASE ....................................................................................................................................... 16
    3.5 BUILD PHASE ......................................................................................................................................... 16
    3.6 TEST PHASE ........................................................................................................................................... 17
    3.7 DEPLOYMENT PHASE ............................................................................................................................... 17
    3.8 CLOSE PHASE ......................................................................................................................................... 18
4. PLANNED QA ACTIVITIES .................................................................................................................... 18
    4.1 BY DELIVERABLE ...................................................................................................................................... 18
    4.2 BY PHASE FOR TOLL GATE ......................................................................................................................... 19
    4.3 AS REQUESTED ....................................................................................................................................... 19
5.0 REPORTING METHODS ..................................................................................................................... 19

Page | 4
                      Quality Assurance Plan for <Project Name>
   5.1 QA CHECKLISTS ...................................................................................................................................... 19
   5.2 VENDOR CHECKLISTS OR PROCESSES ........................................................................................................... 19
   5.3 NONCOMPLIANCE REPORTING PROCEDURES ................................................................................................ 20
6.0 QUALITY ASSURANCE METRICS ....................................................................................................... 20




Page | 5
               Quality Assurance Plan for <Project Name>
1. EXECUTIVE SUMMARY
  The Quality Assurance Plan for <Project Name> has been established to support the
  objective review of aspects of the project and its product development phases to insure
  that the purposes of the project are being met in the most productive manner.
  Quality Assurance Plan- Establishes the basis for reviewing and auditing of the products
  and activities to verify that they comply with applicable procedures and standards and to
  assure the production and operation of high quality products according to stated
  requirements.
  Quality Assurance – Management Aspect –Planned and systematic activities
  implemented within the quality system to provide confidence that the project will satisfy
  the relevant quality standards.
  Quality Control – Technical Aspect – monitoring specific project results to determine if
  they comply with relevant quality standards, identifying ways to eliminate unsatisfactory
  results.


1.1 THE PROJECT’S QUALITY FOCUS
  Provide a brief summary of project from the Project Management Plan
  1.1.1 SPONSOR AND BUSINESS OWNERS PROJECT OBJECTIVES
  Copy the Business and Technical objectives from section 3.1 of the Project Management
  Plan
  1.1.2 CRITICAL SUCCESS FACTORS
  Copy the Critical Success factors from Section 3.3 of the Project Management Plan.


  1.1.3 QUALITY STANDARDS
  Copy the Quality Standards from Section 6.7.1 of the Project Management Plan

  1.1.4 PROJECT AND PRODUCT REVIEW AND ASSESSMENTS
  Copy the project and Product review and assessments from section 6.7.2 of the Project
  Management Plan
2. SCOPE OF QA PLAN
  The scope of this project QA plan covers the project activities and product development
  phases to meet the business objectives established by the project sponsors and business
  owners. This includes but is not restricted to the following QA topics:


  Page | 6
                 Quality Assurance Plan for <Project Name>
           Organizational structure
           Documentation required
           Procedures to be enforced
           Audits and reviews to be conducted
           Process improvement
           Problem reporting and resolution
           Quality Assurance metrics



2.1 SPECIFIC ACTIVITIES THAT WILL BE REVIEWED BY QA
 The following five activities comprise the main aspects of the project. Each has
 subsidiary activities that will vary according to the type and complexity of the project.
 These activities combine to meet the project sponsor and business owner’s expectations
 as defined in the 1.1.Executive Summary Introduction which essentially copies these
 expectations from the Project Management Plan.
 The subsidiary activities are determined by the type and complexity of the project as
 established during the project initiation phase.
 2.1.1 PROJECT MANAGEMENT
 Project Management establishes the business and technical goals of the project, the
 project’s authority and organizational structure, the scope of the project, its deliverables
 and methodology, the work of the project, its schedule, project team, and the project
 monitoring and control mechanisms.

       2.1.1.1 Specific Project management Activities


 Activity                                        Description




 2.1.2 REQUIREMENTS MANAGEMENT
 Requirements Management covers the business requirements for the project, the user and
 system as well as the operations specifications that derive from the business requirements.
 Included in these requirements are the end user training and documentation needed to
 insure the success of the end users with the solution. These requirements are elaborated in
 a set of documents which are then provided to the system designers and developers or

 Page | 7
             Quality Assurance Plan for <Project Name>
assemblers of the system. A fundamental component of this area is tracing a requirement
from its business purpose through to the solution that is designed, built and ready for
deployment.

      2.1.2.1 Specific Requirement management Activities


Activity                                     Description




2.1.3 SYSTEM DEVELOPMENT
Within System Development are the activities that take the requirements specifications
and build the design for the business solution. The system is then built to these
specifications and tested within the development process.

      2.1.3.1 Specific System Development Activities


Activity                                     Description




2.1.4 TESTING AND ACCEPTANCE
Testing and Acceptance covers the user acceptance testing of the system, its
administration, its documentation and its training classes and materials. The testing
process insures that the product meets the various requirements established and refined
during the project.

      2.1.4.1 Specific Testing and Acceptance Activities


Activity                                     Description

Page | 8
              Quality Assurance Plan for <Project Name>




 2.1.5 TRANSITION TO OPERATIONS
 Transition to operations covers the planning for deploying the product, usually involving
 pilots that affirm the assumptions made in the development process, the transition of the
 product from the development teams to the operations teams that will be managing the
 developed solution, Transition to operations also covers the business continuity and
 disaster recovery planning for the product.

       2.1.5.1 Specific Transition to Operations Activities


 Activity                                     Description




3.0 QA ORGANIZATIONAL STRUCTURE

2.1 GOVERNANCE STRUCTURE

 The QA function will be a separate entity and will maintain independence from the
 project management team by possessing a direct reporting function to the technical
 monitor/senior management. This structure will protect the QA team’s independence and
 objectivity concerning the assurance of high-quality, professional products and services.
 This team is responsible for the development of this Quality Assurance Plan (QAP) will
 be used to identify the roles and responsibilities of the QA team.

  ROLE                RESPONSIBILITY                                                NAME




 Page | 9
               Quality Assurance Plan for <Project Name>

  ROLE                 RESPONSIBILITY                                                 NAME

  Project Sponsor,     Help define product quality expectation. Periodically
  Business Owners      reviews QA and resolves issues as necessary. Provides
                       leadership for acquiring QA resources and keeps QA
                       distinct from Project team. Promotes the objective
                       verification of project activities toward meeting Business
                       and Technical requirements. Accepts QA findings at Toll
                       Gates
  Project Manager      Ensures implementation of QA activities, Co-ordinates
                       with Project Sponsors/Business owners the establishment
                       of the QA function and resources. Co-ordinates resolution
                       of Issues. Provides regular and timely communications.
                       Manages the QA activities within the project Schedule
                       and schedules Phase Toll Gate reviews. Ensures QA
                       function maintains organizational freedom, authority and
                       independence to objectively evaluate and report on all
                       project activities.
  QA Manager           Manages the QA Plan and activities, planning and taking
                       responsibility for the documentation of QA activities in
                       the project management plan, manages the QA schedule.
                       Co-ordinates with the Project manager on the project
                       documents and deliverables subject to the QA reviews.
  QA Team              Audits and objectively evaluates project deliverables from
                       a QA perspective. Reviews plans and deliverables for
                       compliance with applicable standards. Provides guidance
                       and assistance on process matters.

  Configuration        Sees to the proper management of project configuration
  Management           items, including the QA reviews. This entails appropriate
                       naming of computer files, seeing to proper version
                       controls under change management.



2.2 QA TEAM ROLES AND RESPONSIBILITIES
  The role of the QA team is to assist the technical staff to continually improve the quality
 of their work products and services. The QA team is responsible for establishing
 processes and procedures that accurately verify and validate the adherence of desktop
 computer support and network activities to applicable standards, guidelines, and
 procedures.

 The QA team will be involved at the start of the project. They will participate in the
 development of the Project Management Plan (PMP) to establish their function within
 Page | 10
                 Quality Assurance Plan for <Project Name>
the project and to provide input into the project’s schedule and work breakdown structure
(WBS) to ensure that QA activities are identified and that time is allotted for QA
activities. Funding for the QA team members will be planned within the task hours and
cost structure.

The organizational responsibilities as they relate to QA are:


 ROLE                    RESPONSIBILITY               NAME                   FUNCTIONAL
                                                                             AREA




2.2.1 TECHNICAL MONITOR/SENIOR MANAGEMENT

           Provides management support, supervision, and oversight for the QA function
           Ensures the independence of the QA function
           Makes available staff and other resources as needed to support QA
           Ensures resolution of problem and concern issues
           Reviews QA audits and reports

 ROLE                    RESPONSIBILITY               NAME                   FUNCTIONAL
                                                                             AREA




Page | 11
                  Quality Assurance Plan for <Project Name>

2.2.2 QUALITY ASSURANCE TEAM

           Develops and maintains the Quality Assurance Plan
            Ensures work products adhere to the appropriate standard
            Conducts audits and reviews
            Develops audit and review procedures for QA activities
            Ensures the QA processes and procedures adequately control project quality
            Ensures the QA activities accurately measure the product, service, and process
            quality
            Reviews and approves specified deliverables for release to customer
            Promptly reports results of audits to the project task leader
            Periodically reports unresolved noncompliant items to technical monitor/senior
            management
            Maintains an on-going dialogue with the technical monitor and QA support staff
            to establish a common understanding of quality assurance activities as they apply
            to QA services and products
            Ensures that the expectations of QA activities are identified and understood
            between the technical monitor, task leader, and the team members
            Collects and analyzes metrics produced from the results of the QA process
            Recommends changes in procedures to improve processes

 ROLE                     RESPONSIBILITY                NAME                    FUNCTIONAL
                                                                                AREA




2.2.4 TECHNICAL STAFF

           Implements task level quality control based on QA standards, policies, and
            procedures
            Participates in reviews and audits
            Performs corrective actions or process improvements in response to QA findings
            Manages and controls defects/errors and corrections

Page | 12
                  Quality Assurance Plan for <Project Name>
            Tracks the status of defects/errors until closed
  ROLE                     RESPONSIBILITY                 NAME               FUNCTIONAL
                                                                             AREA




 The effectiveness of the QA team’s effort depends on the support and commitment of the
 technical staff and all levels of management. All affected groups should be trained in the
 principles of quality assurance and be committed to the proper inclusion and performance
 of QA activities within their work efforts.

3.0 REQUIRED DOCUMENTATION/ARTIFACTS BY
PROJECT PHASE
 Projects create documentation and other product development artifacts such as code and
 other items not classified as formal documents. Where the word document is used the
 project should understand that this includes both documents and other artifacts.

 All required documents will follow the appropriate Department of Information
 Technology standards concerning content and format. Department of Information
 Technology standards for some project management areas may not be available. When
 Department of Information Technology standards are not available, the QA team, along
 with input from the project team, must develop the standards or adapt documents
 developed by other groups to use as standards within the project.

 The project activities are to be implemented according to customer requirements. The
 required project templates and documentation necessary to ensure activities are planned,
 monitored and controlled will be used to verify the adequacy of the actual processes and
 procedures used to develop and/or deliver products/services.

 Required documentation, while tailored the specific project type and complexity,
 includes:

            Project Management Plan
 Page | 13
                  Quality Assurance Plan for <Project Name>
            Configuration Management
            Change Management
            Communications Management
            Risk and Issues Management
            Work Breakdown Structure
            Project Schedule
            Business and System Requirements
            System Design Document
            Transition to Operations Document
            Business Continuity Document
            Testing and Acceptance Documents
            Systems Administration Manual Document
            End User Training Requirements and

3.1 INITIATION PHASE
 The Initiation Phase establishes the foundation for the project. The key document is the
 project charter which lays out the scope and governance structure for the project. The
 Initial Risk Assessment required by the “IT Project Oversight Process Memorandum”
 serves as a walkthrough of the various aspects of the typical project and suggests area that
 should be addressed in the project planning and management process


 Document                        Focus                         Reviewers




3.2 PLAN PHASE
 The Plan Phase builds on the foundation of the Project Charter’s establishment of the role
 of the project manager, and the establishment of funding for the planning required by the
 project. The key elements of the Plan phase are the initial Project Management Plan, the
 establishment of the business requirements for the project, the development of initial
 depolyment and support documents and the development of the required IT contracts for

 Page | 14
               Quality Assurance Plan for <Project Name>
 the project including the Independent Validation and Verification for the project as
 required by the State of New Mexico project certification process.
 As per the Project Oversight Definition, “Product development life cycle” is a series of
 sequential, non-overlapping phases”, the Plan Phase and the rest of these phases has a
 “Toll Gate” review that must be done before the project starts on the next “sequential,
 non- over phase.”




 Document                        Focus                           Reviewers




3.3 DEFINE PHASE
 The Define Phase builds on the business requirements of the plan phase, and builds or
 “defines” the user, system, and operations requirements necessary to support the business
 needs of the product. Out of the requirements comes the system architecture that will also
 be used in the design phase, and the foundation of the training for end users and support
 staff, and the initial test plans that will be implemented in the build phase.


 Document                        Focus                           Reviewers




 Page | 15
              Quality Assurance Plan for <Project Name>


3.4 DESIGN PHASE
 The Design Phase takes the defined requirements and system architecture and builds the
 design for the product. Through these phases the project must maintain a requirements
 traceability matrix which enables it to trace each element of the product’s design back to
 previously defined technical requirements each of which serves the business requirements
 of the project.
 Paralleling the technical design process is the establishment of the training curriculm and
 test cases that will be used to train the support and end user community and be used for
 testing that the solution meets the required functionality.


 Document                       Focus                          Reviewers




3.5 BUILD PHASE
 The Build Phase is the point in the project that the product gets built, and assembled.
 Again the project performs traceability to ensure the requirements are actualized, and also
 performs the various testing processes of what is being built. Insights as to how the
 product is to be traing and deployed and should be administered are added to previous
 initiated documentation. Training Materials are developed that synch up with the actual
 product.


 Document/Artifact                Focus                         Reviewers




 Page | 16
               Quality Assurance Plan for <Project Name>




3.6 TEST PHASE
 The formal test phase is used for the development of the acceptance testing that is
 required to move into the deploy phase. Again the project performs traceability to ensure
 the requirements are actualized, and also performs the acceptance testing processes
 against the business and user requirements which had formed the rationale for the project.




 Document                        Focus                          Reviewers




3.7 DEPLOYMENT PHASE
 The Deploy Phase leverages the various deployment and support documents that were
 initiated in the Plan Phase and updated during the subsequent development phases.
 Ideally the Deploy Phase will include a pilot population that will be used to ensure that all
 the planning assumptions have been accurately turned into project deliverables.


 Document                        Focus                          Reviewers



 Page | 17
                Quality Assurance Plan for <Project Name>




3.8 CLOSE PHASE
  The Close Phase of the project includes formally transitioning the product to operations
  support, and signing what ever accptance documents are contractually requiered. The
  project then requests formal close out from the Project Certification Committee.


  Document                        Focus                          Reviewers




4. PLANNED QA ACTIVITIES
  In this section the Quality Assurance activities for this project should be identified with
  target date.


4.1 BY DELIVERABLE


DELIVERABLE              DELIVERABLE                             Q A REVIEWERS           SCHEDULED
NUMBER                                                                                   REVIEW

PRJ-DEL-001              Project Management Plan (PMP)
  Page | 18
               Quality Assurance Plan for <Project Name>

DELIVERABLE              DELIVERABLE                           Q A REVIEWERS             SCHEDULED
NUMBER                                                                                   REVIEW




4.2 BY PHASE FOR TOLL GATE
  Refer to Department of Information Technology Quality Assurance Workbook for details
  on the toll gate process.
 PHASE                   DELIVERABLES                          Q A REVIEWERS             TOLL GATE
                                                                                         SCHEDULED
                                                                                         DATE

 Plan                    Project Management Plan (PMP)




4.3 AS REQUESTED
  QA reviews can be requested by Sponsors or Business Owners, Project Manager or by the
  Department of Information Technology
5.0 REPORTING METHODS
  Errors, defects, issues, deviations and noncompliance items identified in the QA activities
  must be itemized, documented, tracked to closure, and reported by the QA team. The QA
  team must verify all problems were tracked to closure and must provide continuing
  feedback to management and the technical support team concerning the status of the
  problem.

5.1 QA CHECKLISTS
   The QA Checklists will be used to identify issues with each deliverable and
  document/artifact/process. These checklists will identify the reviewer and the steps
  necessary to bring the item into compliance with QA standards.

5.2 VENDOR CHECKLISTS OR PROCESSES
  With the approval of Project Oversight and Compliance Division of Department of
  Information Technology vendor checklists or processes established contractually with the
  lead agency may be used.

  Page | 19
                Quality Assurance Plan for <Project Name>
5.3 NONCOMPLIANCE REPORTING PROCEDURES

 1. Problems are resolved with the direct producer or the appropriate task leader, when
 possible.
 2. Problems that cannot be resolved with the technical team or task leader are elevated to
 the project manager.

 3. Problems that have been referred to the project manager are reviewed weekly until
 they are resolved. Items that cannot be resolved by the project manager within six
 weeks are elevated to the technical monitor for resolution.

6.0 QUALITY ASSURANCE METRICS
 The QA team will work with the technical support staff to identify indicators and their
 associated measures (Metrics) that are needed to control performance and predict future
 status of processes used to produce products and services. The metrics will be used to
 help determine when and where a problem is occurring and what type of impact it will
 have on the product or service. The metrics will be used to base decisions concerning the
 selection of best practices to implement in the project.

 Metrics that are necessary to monitor the effectiveness of QA processes and procedures
 are:

  1.   Number of reviews (QA activities) conducted
  2.   Number of changes to project schedule and milestones
  3.   Status of non-conformance items identified
  4.   Status of action items open/closed/on-hold
  5.   Number of days to correct and close a non-conformance item
  6.   Customer satisfaction levels relating to product and service quality
  7.   Trends for process improvement
  8.   Lessons learned