Orange County
Letter of Transmittal
Date: From: Re: To: February 20, 2007 Al Santos HYATT REGENCY NB EXPANSION Laurie Hager The Planning Center
This is to inform you that the proposed project site at 1107 Jamboree Road in the City of Newport Beach is located within the service territory of COX Communications. COX services from digital phone service to high-speed internet to commercial cable TV services can be provided from our existing facility along Jamboree Road. If you have any questions or require further information regarding our existing services, please feel free to contact me at (949) 546-2484.
Hyatt Regency Newport Beach Expansion EIR Police Service Questionnaire
Date: February 13, 2007
3.
Given the existing level of staffing and equipment, will the police department be able to provide police services to the proposed project? If not, please indicate what will be required to serve the project. The Department is adequately staffed to deal with matters associated with adding 88 timeshare rooms to the facility.
4.
What impact will the proposed project, in combination with all the other projects planned in the area, have on the ability of the police department to provide police services in the area? Most of the police issues dealing with current projects under construction deal with traffic related issues. The Department will adapt to changing conditions and are sufficiently staffed to handle associated issues during and after the project is completed.
5.
What mitigation measures, if any, would you recommend for the proposed project? None.
6.
Please add any comments you may wish to make regarding this project. None.
Submitted by: Steve Shulman, Lieutenant Traffic Services Division Newport Beach Police Deaprtment 949-644-3740
Hyatt Regency Newport Beach Expansion Sewer Services Questionnaire 1. Please describe the existing sewer facilities (lines and treatment plants) in the project area. Please provide maps and plans for reference, if available. See attached map book page. Please note that exact utility locations need to be field verified and that OCSD facilities that are outside of public rights of way have easements that restrict improvements.
2. Which treatment plant will the project-generated sewer flow to? Will the treatment plant designated for the area be able to process project-generated sewer? What is the maximum and current average capacity of the treatment plant? Flow will goto OCSD Plant #2. Capacity 172 mgd Avg Flow 151 mgd
3.
What are the sewer generation rates applied to residential, commercial, and recreational development? What will be the estimated sewer generation from the proposed project?
Estimate flow increases with the following flow factors:
-
727 gpd/acre for estate density residential (0-3 d.u. /acre); 1488 gpd/acre for low density residential (4-7d.u. /acre); 3451 gpd/acre for medium density residential (8-16 d.u./acre); 5474 gpd/acre for medium-high density residential (17-25 d.u./acre); 7516 gpd/acre for high density residential (26-35 d.u./acre); 2262 gpd/acre for commercial/office; 3167 gpd/acre for industrial; 2715 gpd/acre for institutional; 5429 gpd/acre for high intensity industrial/commercial; 150 gpd/room for hotels and motels; 50 gal./seat for restaurants, and 129 gpd/acre for recreation and open space usage.
Compare flow increases to previous zoning.
Hyatt Regency Newport Beach Expansion Sewer Services Questionnaire
4.
What is the capacity of the conveyance facilities impacted by the project? Will the conveyance facilities be able to accommodate the project-generated sewer?
Since there are multiple OCSD facilities within the area, a specific connection point needs to be specified.
5. What impact will the proposed project, in combination with all the other development projects in the area, have on the existing conveyance facilities and treatment plants? Treatment Plant – no impact Conveyance facilities - Depends on answer to questions 3 and 4. Please include within the CEQA doc a sewer study that indicates proposed connection locations and flow increases.
6. Which mitigation measures, if any, would you recommend for the proposed project? That low flow water fixtures be used that include waterless urinals for commercial and office buildings.
Response Prepared By:
Name
Title
Agency
Date
SEE A B C D
5537
SHEET E
F
G
H
NE W NE POR WP T OR BEA TB C AY H
BA CK BA YD R
PO RT
Y BA
1 2 3
MANHOLE ID
CONTRACT
STATION NUMBER
MH DEPTH
RIM ELEV CD X Y
SHEET
4
IS LA
SEE
5636 SEE
5638 SHEET
P
5
6
BAYSIDE
OR EE
OCSD Diversion Structure OCSD Manhole OCSD Sewer Easement Boundary Pump Station Force Main Force Main Valve Force Main Air Valve Force Main Node Directional Flow Arrow OCSD Maintained Diversion Structure OCSD Maintained Manhole OCSD Maintained Sewer Third Party Connection Non OCSD System Historic Street Name
RD
DR
7
JA MB
8
SERVICE AREA 5 Orange County Sanitation District
Last Revised: 01/01/2007 SEE 5737 SHEET
5637