Docstoc

CONTINUING EDUCATION _

Document Sample
CONTINUING EDUCATION _ Powered By Docstoc
					JOHN KINNS                                                                                                 7-MAR-10
OUTLINE RECORD OF ALL TECHNICAL & PROFESSIONAL EXPERIENCE



  Inclusive dates in                                                                                      Time
 chronological order               Brief details of employing organisations, projects,                    span
  From         To                      including size and costs and position held                      in months
 Industrial Placement Year during University Degree.
 Bedfordshire County Council
 England
  20.7.92      31.12.92     Assistant Engineer - Highway Maintenance Division.                               5
                             Design & Supervision of small Maintenance / Improvement Schemes of up
                               to £100 000. (ES & IP)
   1.1.93       4.4.93      Assistant Engineer - The Engineering Laboratory.                                 3
                             Testing for CC & DoT Schemes within Bedfordshire. (ES & IP)
                                 - Construction materials sampling and testing.
                                 - Minor SI and soils testing.
                                 - Surface assessment testing.
                                 - Investigation of materials failure.
   5.4.93      30.5.93      Assistant Engineer - Resources Division.                                         2
                             Finance Monitoring for all Schemes. (ES & IP)
  31.5.93      30.9.93      Assistant Engineer - Highway Design.                                             4
                             Shefford Town Centre Environmental Enhancement (£50 000 EW). (ES)
 Graduate Employment (Under ICE Approved Training Agreement).
 Bedfordshire County Council
 England
  15.8.94       8.1.95      Assistant Engineer - Highway Design.                                             4
                             Sandy Town Centre Right Turn Lane (£20 000 EW). (ES)
                             Biggleswade Stratton Business Park Development (£400 000 EW). (ES)
   9.1.95      28.4.96      Assistant Resident Engineer - Contract Supervision & Measurement.               16
                             A507 Arlesey - Stotfold Bypass (£9.5m EW). (IP)
                               Rural, 6km long. 1 River Bridge, 3 RC Box Culverts.
                             A600 Chicksands Resurfacing & Minor Works (£200 000 EW). (IP)
                               Rural, 2km.
                             A6001 Biggleswade Mini R/About (£35 000 EW). (IP)
                             Biggleswade Stratton Business Park Development (IP)
                                 - Infrastructure design (£400 000 EW).
  29.4.96      31.5.96      Assistant Engineer - Bridge Inspection.                                          1
                             Principal Inspections for Armco Arches; RC Box Culverts;
                               Steel Footbridge; Propped abutment RC Bridge. A1 Bedfordshire. (ES)
   1.6.96      31.12.96     Project Engineer - Bridge Assessment                                             7
                             County Assessment & Strengthening Programme. (ES)
                                 - RC Twin Box Culvert (£4000). A505 Luton, Church St.
                                 - RC Portal Pedestrian Subway (£4000). A6 Luton, Stuart St.
                                 - RC Propped Abutment (£4000). U235 Rye Rd.
                                 - RC Arched Culvert (£1000). B530, Ampthill.
                             RC Saddle Reconstruction, Maintenance Manual (£625 000). (ES)
                               Lock Bridge, Broom. Semi-Urban.
                             RC Box Culvert Reconstruction, Maintenance Manual(£100 000). (ES)
                               Stock Bridge, Henlow. Semi-Urban.
                            Project Engineer - Bridge Design
                             Composite Bridge Reconstruction, Edge Beam Design (£625 000). (ES)
                               River Ivel Bridge, Biggleswade. Semi-Urban.
                             RC Bridge Reconstruction, Design Check (£500 000). ( EW)
                               Chain Bridge, Leighton Buzzard. Urban.
                                                                                       SUB TOTAL            42
 ES    Engineering Solution              RC        Reinforced Concrete
 IP    Implementation Process            CUED      Cambridge University Engineering Department
 EW    Estimated Works Cost              BWBP      Bedford Western Bypass
 SI    Site Investigation                BCC       Bedfordshire County Council


 D:\Docstoc\Working\pdf\666bf137-99ec-4e94-b235-c14842bcc25e.rtf                                      Page 1 of 4
JOHN KINNS                                                                                                  7-MAR-10
OUTLINE RECORD OF ALL TECHNICAL & PROFESSIONAL EXPERIENCE




  Inclusive dates in                                                                                       Time
 chronological order               Brief details of employing organisations, projects,                     span
  From         To                      including size and costs and position held                       in months
   1.1.97      31.12.97     Project Manager - Bridge Assessment                                              12
                             County Assessment & Strengthening Programme. (ES)
                                 - RC Portal Pedestrian Subway No. 1(£6000). A505 Luton Park.
                                 - RC Portal Pedestrian Subway No. 2 (£6000). A505 Luton Park.
                                    & Switch Room.
                                 - RC Portal Pedestrian Subway No. 3 (£6000). A505/A6 Luton Park.
                                 - RC Portal Pedestrian Subway No. 4 (£6000). A505/A6 Luton Park.
                                 - RC Portal Pedestrian Subway No. 5 (£6000). A505/A6 Luton Park.
                                 - RC Twin Box Culvert No. 1 (£6000). A505/A6 Luton.
                                 - RC Twin Box Culvert No. 1 (£6000). A505/A6 Luton.
                                 - RC Access Bridge (£1000). Kempston, Bedford.
                                 - RC Integral Bridge (£4000). C245 Mill Grange, Leighton Buzzard.
                                 - RC Filler Beam Bridge (£6000). Kimpton Rd, Luton.
                                    Railtrack Assessment.
                            Project Engineer - Bridge Design
                             Bedford Western Bypass Design. (ES)
                                 - Project Management of Bridge Works.
                                 - Church Viaduct (£3.3m EW).
                                    Conceptual Design.
                            Project Manager - Bridge Assessment
                             Project Manage Beta Testing for CUED Yield-Line Programme. (R&D)
                                 - Secure and manage a 4 month (extended to 9) trial user programme.
                                 - Training & liaison with Cambridge University (The developer).
                                 - Further Assessment of 4 structures, involving 4 Engineers.
                                 - Discussions to obtain Client approval.
                                 - Manage reporting & dialogue with CUED throughout the project.
                             County Assessment & Strengthening Programme. (ES)
                                 - U235, Rye Rd Bridge. Further Analysis (£4500).
   1.1.98      30.9.98      Project Engineer - Bridge Design                                                  9
                             Bedford Western Bypass Design. (ES)
                                 - Project Management of Bridge Works (£206 000 over 2.5 yrs.).
                                 - Church Viaduct (£3.3m EW).
                                    Preliminary Design.
                            Project Manager - Bridge Assessment
                             County Assessment & Strengthening Programme. (ES)
                                 - RC Beam, Cantilevered Support (£5000). A507 Crawley Crossing.
                                 - Mill Grange, Leighton Buzzard. Further Analysis (£8000).
                                 - Complex RC Slab (£6000). A418 Canal Bridge, Leighton Buzzard.
                                 - Kempston Mill Steel/Timber Footbridge for BWBP SI
                             Project Manage Beta Testing for CUED Yield-Line Programme. (R&D)
                            Assistant Resident Engineer - Contract Supervision
                             Short Term Cover for Various Schemes. (IP)
                                 - Chain Bridge (RC) Reconstruction (£500 000 EW).
                                 - Girtford Culvert Replacement, Sandy (£140 000 EW).
                                                                                       SUB TOTAL             65
 ES    Engineering Solution              RC        Reinforced Concrete
 IP    Implementation Process            CUED      Cambridge University Engineering Department
 EW    Estimated Works Cost              BWBP      Bedford Western Bypass
 SI    Site Investigation                BCC       Bedfordshire County Council




 D:\Docstoc\Working\pdf\666bf137-99ec-4e94-b235-c14842bcc25e.rtf                                       Page 2 of 4
JOHN KINNS                                                                                                       7-MAR-10
OUTLINE RECORD OF ALL TECHNICAL & PROFESSIONAL EXPERIENCE




  Inclusive dates in                                                                                            Time
 chronological order               Brief details of employing organisations, projects,                          span
  From         To                      including size and costs and position held                            in months
 Graduate Employment (Post ICE Training Review - September 1998).
 Babtie Group Ltd - Bedford Office
 England
  1.10.98      31.12.98     Project Engineer - Bridge Design                                                       2
                             Bedford Western Bypass Design. (ES)
                                 - Project Management of Bridge Works (£206 000 over 2.5 yrs.).
                                 - Church Viaduct (£3.3m EW).
                                    Preliminary Design.
                            Project Manager - Bridge Assessment
                             Marston Vale Community Forrest Footbridge. (ES)
                                 - Project manage inspection; assessment; reporting (£500).
   1.1.99      31.12.99     Project Engineer - Bridge Design                                                      12
                             Bedford Western Bypass Design. (ES)
                                 - Project Management of Bridge Works (£206 000 over 2.5 yrs.).
                                 - Church Viaduct (£3.3m EW).
                                    Detailed Design.
                             Arlesey Bridge Interim Measures (£213 000 EW). (ES)
                                 - Assessment of half joint overspan, and propping. (ES)
                                 - Assist in compiling Design&Build Contract. (IP)
                                     Manage specification of lighting and permanent traffic management.
                            Project Promoter – Electronic Service Delivery (ESD)
                             ESD within highway design and construction. (R&D)
                                 - Promote initiative to management and BCC client.
                                 - Evaluate Electronic Public Consultation.
                                 - Liase with BCC’s own ESD initiative.

  1.1.2000    31.8.2000     Project Engineer - Bridge Design                                                      7.5
                             Bedford Western Bypass Design. (ES)
                                 - Project Management of Bridge Works (£206 000 over 2.5 yrs.).
                                 - Church Viaduct (£3.3m EW).
                                     Detailed Design.
                            Project Promoter – Electronic Service Delivery (ESD)
                             ESD within Highway design and construction. (R&D)
                                 - Trial ‘Electronic Public Consultation’ internet systems in conjunction
                                   with a traditional public consultation.
                                 - Produce a demonstration exhibition for a Babtie/ BCC partnership
                                   seminar (May 2000).
                            Project Engineer – Bridge Assessment/ Inspection
                             Railtrack BridgeGuard Assessment Programme (ES)
                                 - Emergency Assessment Inspection of Souldrop Bridge (Sharnbrook
                                   Road) - 2 spans: Wrought iron girder filler beam, heavily corroded.
                                   Designed & managed inspection, undertook assessment calculations,
                                   and advised on options for weight restriction. (£??????).
                            Project Engineer - Bridge Assessment
                             Railtrack BridgeGuard Assessment Programme (ES)
                                 - 3 Span S/S Precast Prestressed Beam/ RC infill & Slab Deck (£5000).
                                   Back Street Bridge, Biggleswade, Bedfordshire.

                                                                                         SUB TOTAL               86.5
 ES    Engineering Solution               RC         Reinforced Concrete
 IP    Implementation Process             CUED       Cambridge University Engineering Department
 EW    Estimated Works Cost               BWBP       Bedford Western Bypass
 SI    Site Investigation                 BCC        Bedfordshire County Council



 D:\Docstoc\Working\pdf\666bf137-99ec-4e94-b235-c14842bcc25e.rtf                                            Page 3 of 4
JOHN KINNS                                                                                                     7-MAR-10
OUTLINE RECORD OF ALL TECHNICAL & PROFESSIONAL EXPERIENCE



  Inclusive dates in                                                                                          Time
 chronological order               Brief details of employing organisations, projects,                        span
  From         To                      including size and costs and position held                          in months
  1.9.2000     31.12.01     Project Manager - Bridge Design                                                      4
                             Grange Mill Bridge. (ES)
                                 - Project Management of Feasibility & Preliminary Design (£20 000)
                            Project Manager - Bridge Design
                             Canal Bridge Feasibility Study. (ES)
                                 - Project Management of Study (£5 000)

  1.1.2001     31.8.01      Project Manager - Bridge Design                                                      8
                             Grange Mill Bridge. (ES)
                                 - Project Management of Feasibility & Preliminary Design (£20 000)
                            Project Manager - Bridge Design
                             Canal Bridge Feasibility Study. (ES)
                                 - Project Management of Study (£5 000)
                            Project Engineer - Bridge Design
                             Arlesey Bridge Reconstruction (£6M EW). (ES)
                                 - Design of RC Substructure Piers & Abutments for a 140m 5 span
                                   continuous, composite RC/ steel plate girder deck. (ES)
                                 - Assist in compiling ECC Partnering Contract. (IP)
                                     Appendices
                            Project Engineer - Highway Design
                             Safe Routes to School (£?? EW). (ES)
                                 - Development and production of internet based public consultation
                                   solution.


                                                                                                  TOTAL        98.5
 Professional Employment (Post ICE CEng Review - 2001).
 Babtie Group Ltd - Bedford Office
 England

 ES    Engineering Solution              RC         Reinforced Concrete
 IP    Implementation Process            CUED       Cambridge University Engineering Department
 EW    Estimated Works Cost              BWBP       Bedford Western Bypass
 SI    Site Investigation                BCC        Bedfordshire County Council




 D:\Docstoc\Working\pdf\666bf137-99ec-4e94-b235-c14842bcc25e.rtf                                          Page 4 of 4