Instructions – Capital Request Form
General
This form should be filled out if you are requesting capital items for FY
2011. Instructions have been included in this document on procedures to
fill out this form. A capital item is considered any individual item that has a
useful life of at least two years, has a cost of at least $5,000, and is
tangible in nature. Items generally considered capital are vehicles,
servers, land, buildings, heavy equipment, etc. Please note software is
considered capital, if a single license costs $5,000 or more.
Multiple capital requests can be made in this workbook by copying the tab.
The tab is at the bottom of the workbook. Right click on the tab labeled
“Capital Request”, select Move or copy, check the box “Create a copy” and
click OK. Tabs can be renamed by double-clicking on the tabs and typing
the new title. You may wish to re-title the tabs to indicate the item being
requested. This process can be repeated as often as needed to create
multiple requests in one workbook for your department.
COMPLETING THE CAPITAL REQUEST FORM:
Please complete the non-shaded portions of the form.
Department Name - name of department. (Example – “Finance”)
Description – a general description of the item you are requesting
(Example – “Laser Printer”)
# requested – Enter the number of items you are requesting. (Example –
“2” for two printers)
Cost per item – Leave this field blank. This field will automatically
calculate when completing the Capital Costs section at bottom of page.
New or Replacement – indicate if item is to replace existing equipment
Estimated useful life - expected useful life of item requested.
Item to be replaced, if applicable – identify item to be replaced.
Asset ID - number assigned to the item to be replaced. If not sure, contact
Finance. Item to be replaced will be surrendered to the Procurement
Director for disposition.
Part of 5 Year Capital Plan – indicate if item is part of the 5 year capital
plan
If no, why - Give explanation.
Page 1 of 2
Instructions – Capital Request Form
Justification of Capital Request – please give an explanation of why the
item is being requested such as to replace aged, worn out or obsolete
items, provide new or improved services, comply with federal or state
requirements, save on future operating costs, correct a problem, etc.
Capital Costs – Please break down by type of cost for the requested item.
List under “Other” any other cost besides the cost of the equipment,
freight, sales tax, and advertising. The total field will automatically
calculate and fill in the amount under “Cost per Item”. If requesting more
than one item, please list the cost for only one item. Please use the space
to the right to put any additional information needed.
Source of Funding – please indicate proposed funding source for items.
Other could include bond, capital lease, Local Accomodations Tax, etc.
Please use the space to the right to put any additional information
regarding potential funding sources.
Estimated Change in Operating Costs – please provide estimates of any
changes expected in the operating costs of the department due to the
purchase of the requested item(s). Indicate the types of cost (Annual
Maintenance, Fuel & Oil, etc.) and the amounts for 2011 and 2012 (some
of the operating expenses may be less the first year depending on when
the item is first placed into service). This section does not need to be
completed if there is no change in operating costs expected. The total of
all additional 2011 operating costs related to capital requests should be
included in the separate line item on the budget worksheet titled
“Operating Costs related to Capital Requests”. Operating costs for items
approved will be distributed to the appropriate budget categories.