Emerald Beach Nourishment copy

W
Document Sample
scope of work template
							                                                               EMERALD BEACH NOURISHMENT PROJECT
                                                                                                             Providenciales, BWI
Date
May 2002 September 2004
Summary
Coastal Design & Engineering, Ltd (CDE) provided coastal engineering services to restore the highly eroded shoreline at Emerald
Beach and a new inlet channel constructed to provide boat access for sport and commercial shing.

Key Project Elements
•       Design and Permit a 350,000 cubic yard Beach Nourishment Project
•       Process and Acquire all Regulatory Permits
•       Government Security Agreements
•       Monitoring and Mitigation Plans
•       Economic Analysis of Project Benefits and Costs for Project Financing
•       Geotechnical Analysis of Sand Source and Inlet Channel Design
•       Construction Administration Services

CDE acquired all Turks and Caicos Islands regulatory permits in September 2003 and completed contract documents and drawings,
and construction bidding and contractor selection. Project Engineer of Record responsible for planning, economic analysis and
financial planning studies, sand source investigations, design, preparation of the Environmental Impact Assessment, permit
acquisition and construction administration since 1996.

The first phase to construct a Beach Nourishment and Inlet Channel Dredging project was completed in concert with a
comprehensive physical and biological monitoring plan. The total sand quantity for beach placement was 300,000 CY.




       CDE LTD.             Graceway House, Suite 101A • Leeward Highway, Providenciales • Turks & Caicos Islands, BWI • 649.941.7309

						
Related docs