							March 1, 2010



Mr. Lyle Mathiasen
Civic Facilities Director
St. Cloud Civic Center
10 Fourth Avenue South
St. Cloud, MN 56301



Re:      Project Data Summary for the St. Cloud Civic Center Expansion Project
         St. Cloud City Council Planning Session Presentation and Update 3/1/2010

Dear Mr. Mathiasen;

Hagemeister Mack Architects is pleased to present the following project update submittal for the St. Cloud Civic Cen-
ter Expansion and Parking Ramp. This report has been prepared based upon the current status of the project which is
now in the middle stages of the Construction Documents Phase. Some data changes will be inevitable as we focus on
the details of the design in preparation for bidding the project this spring.

The project consists of an approximate 85,000 SF addition to the existing Civic Center building, as well as an approxi-
mate 300 stall parking ramp on adjacent property owned by the City of St. Cloud. The total project cost is estimated
to be approximately $34 million. $2 million in state bonding money was allocated for the project in 2008. The City is
seeking an additional $15.1 million in state bonding money to be matched by the City of St. Cloud Food & Beverage
Revenue Tax. We are hopeful the project will be funded this year and that construction can begin in June or July of 2010.
It is anticipated the City will begin utility and street location work this fall in preparation for the Civic Center Expansion
Project.

Thank you for your confidence in retaining Hagemeister and Mack Architects for architectural services related to this
project. The project has been a long time in the making, and we are excited to see it reach this stage. We look forward
to serving you throughout the remainder of the project. If you have any further questions or concerns, please feel free
to contact me at your convenience.


Sincerely,

Hagemeister Mack Architects



Murray A. Mack, AIA, LEED AP
                          Table of Contents

                          1. Introduction
                                 Cover Letter ...........................................................................................................................................................1.1
                                 Index .........................................................................................................................................................................1.2
                                 Building Project Data Sheet.................................................................................................................................1.3
                                 Project Team ...........................................................................................................................................................1.4

                          2. Project Background Narrative
                                Statutory Requirements .......................................................................................................................................2.1
                                Planning Process Summary ...........................................................................................................................2.2-2.3
                                Operational and Strategic Program ............................................................................................................2.3-2.4
                                Project History................................................................................................................................................2.4-2.5

                          3. Project Description
                                Expansion Project Program Summary ..............................................................................................................3.1
                                Codes .......................................................................................................................................................................3.2
                                Architectural Systems ....................................................................................................................................3.2-3.4
                                Mechanical Systems ..................................................................................................................................... 3.4-3.11
                                Electrical Systems ...................................................................................................................................... 3.11-3.18
                                Fire Systems ......................................................................................................................................................... 3.18

                          4. Financial Information (Budget / Estimate / Alternates)
                                 Master Budget Summary ......................................................................................................................................4.1

                          5. Project Schedule
                                Project Schedule Overview .................................................................................................................................5.1

                          6. Financial Information (Project Finance)
                                 Revenue Plan for Financing the Project ............................................................................................................6.1

                          7. Financial Information (Operational Budget Impact)
                                 Operating Revenue and Expenditures ..............................................................................................................7.1

                          Appendix A
                                Current floor plans, site plans, renderings .............................................................................................A.1-A12




                                                                                                                                                                                                             page
Project Update 3/1/2010   St. Cloud Civic Center Expansion                                                                                                   Hagemeister Mack Architects
                                                                                                                                                                                                              1.2
                          Building Project Data Sheet
                          Name of Project                St. Cloud Civic Center Expansion and Parking Ramp
                          Owner                          City of St. Cloud

                          Project Location               Fourth Avenue North and St. Germain Street W.
                                                         St. Cloud, MN

                          Building Occupancy Type        A-3 and S-2
                          Primary Space Types            Exhibit Hall and Parking
                          Type of Construction           I-B and II-B

                          Building Size
                          Number of Stories              Existing Building ................................................................................................................... 4
                                                         New Addition ....................................................................................................................... 2
                          Square Feet per Floor          Lower parking existing (175 stalls) ................................................................. 74,500 S.F.
                                                         Upper parking existing (175 stalls) ................................................................. 74,500 S.F.
                                                         1st existing ........................................................................................................... 74,500 S.F.
                                                         2nd existing .......................................................................................................... 35,000 S.F.

                                                         Total Existing ...................................................................................................... 109,500 S.F.

                                                         1st New ................................................................................................................ 61,500 S.F.
                                                         2nd New ............................................................................................................... 23,000 S.F.

                                                         Total New ............................................................................................................. 84,500 S.F.

                                                         Grand Total (NIC Parking Areas) ................................................................. 194,000 S.F.

                          New Site Size                      .............................................................................................................................. 110,000 S.F.

                          Parking
                          Area of Parking                Surface (all new; existing will be removed) ................................................... 32,000 S.F.
                                                         New Ramp (per tier) ......................................................................................... 22,000 S.F.
                          Number of Stalls               Surface (approximate) ................................................................................................... 100
                                                         New Ramp (approximate) ............................................................................................ 300
                                                         Existing Parking Levels (combined total) ................................................................... 350
                          Total Parking Stalls           ............................................................................................................................................ 750

                          Roofing Type                   Ballasted or adhered membrane
                          Exterior Wall Type             Insulation architectural precast walls, glass curtain wall, composite metal panels
                          Interior Wall Type             Masonry, metal stud with gypsum board
                          Structural System Type         Steel frame, precast concrete, steel bar joists
                          Mechanical System Type         Roof top units
                          Fire Protection System         Full automatic sprinkler system
                          Electrical System              2,000 amps, 277/408 volt, three phase
                          Technology System              Energy management, fire alarm, multi media access, wired and wireless telecom-
                                                         munications, video security system

                          Costs
                          See detailed cost breakdown in Section 4


                          State funding amount
                            Received                         ......................................................................................................................... $2,000,000.00
                            Requesting                       ....................................................................................................................... $15,100,000.00
                            Currently in Bonding Bill        ....................................................................................................................... $15,000,000.00



                                                                                                                                                                                                  page
Project Update 3/1/2010   St. Cloud Civic Center Expansion                                                                                       Hagemeister Mack Architects
                                                                                                                                                                                                   1.3
                          Project Team
                          City of St. Cloud
                          Dave Kleis                     Mayor
                          Mike Williams                  City Administrator
                          Lyle Mathiasen                 Community Services and Facilities Director
                          Bill Dunsmoor                  Civic Center Manager
                          Steve Gaetz                    Public Services Director
                          Matt Glaesman                  Community Development Director
                          Steve Foss                     City Engineer

                          Hagemeister Mack Architects
                          Murray Mack                    Project Architect, Designer
                          Mike Juhl                      Project Architect, Manager
                          Tim Gillet                     Architectural Design/Technician
                          Dan Schaff                     Architectural Design/Technician

                          Strack Companies
                          Bob Strack                     President, Strack Companies
                          Mike Smith                     Cost Estimating, Construction Management
                          Dan Osterman                   Cost Estimating, Project Management

                          JLG Architects
                          Dan Miller                     Associate Architect

                          Bonestroo
                          Tom Herkenhoff                 Civil Engineering

                          Larson Engineering
                          Kesh Ramdular                  Structural Engineering

                          LKPB Engineering
                          Victor Powell                  Mechanical Engineering
                          Randy Jacobs                   Electrical Engineering
                          Matt Palodichuk                Commissioning Agent

                          Vedi Associates
                          Puneet Vedi                    Parking Ramp Consultant
                          PS Vedi                        Parking Ramp Consultant

                          The Weidt Group
                          Paul Henderson                 Sustainability Consultant

                          Damon Farber Landscape Architecture
                          Tom Whitlock                   Landscape Architect

                          Orfield Laboratories, Inc.
                          Steve Orfield                  Acoustical Project Manager
                          David Berg                     Technical
                          Michael Role                   Technical

                          Dennis Hahn & Associates Food Service Consulting
                          Dennis Hahn                    Food Service Consultant




                                                                                                                                    page
Project Update 3/1/2010   St. Cloud Civic Center Expansion                                            Hagemeister Mack Architects
                                                                                                                                    1.4
             2
Background                Project Background Narrative
Narrative

                          Statutory Requirements

                          The Minnesota Statutes affecting predesign requirements apply to this project as described in the following:

                              16A.695 - Property purchased with State Bond Proceeds: This statute did not appear to contain any
                              requirements that would affect the project planning or design.

                              16B.241 - Coordinated Facility Planning: Not applicable.

                              16B.32 - Alternative Energy Sources: Alternative energy sources must be used in project. Feasibility of
                              providing 2% of building’s power from on-site renewable wind and sun sources must be evaluated during
                              the design process.

                              16B.325 - Energy Conservation Goals & Sustainable Building Guidelines: Compliance with B3 Guidelines
                              required for this project.

                              16B.326 - Geothermal & Solar Heating-Cooling Systems: Feasibility of using geothermal and solar heating
                              and cooling systems have be evaluated during the design process.

                              16B.33 - Designer Selection Board Requirement: Not applicable to projects for local government units.

                              16B.335 - Predesign Requirement & Review of Plans and Projects, and Consideration of MINNCOR
                              Industry products:
                              • Predesign has been completed for this project.
                              • The project specifications are required to allow for MINNCOR-produced products to be bid. It is
                                  anticipated that there would be a very limited scope of such products.
                              • Technology plans are not required for local government unit projects.




                          Planning Process Summary

                          The St. Cloud Civic Center is located in
                          downtown St. Cloud at the east end of his-
                          toric St. Germain Street and located directly
                          on the west bank of the Mississippi River.The
                          facility was originally completed in 1988 as a
                          combination community center and conven-
                          tion center. The community center functions
                          were basically located in the Terry Haws
                          Center and included a number of multi-
                          purpose wood floor courts, a suspended running track and adjacent support spaces such as locker rooms,
                          restrooms, and storage. The balance of the facility including the Glenn Carlson space was used for conventions,
                          meetings and trade shows. The project was funded by the implementation of a 1 % Food and Beverage sales
                          tax on items sold within the City of St. Cloud. In 1995 The Civic Center expanded its space by renovating the
                          existing Terry Haws room into trade show / convention space along with a renovation of locker rooms into
                          other support space for the Civic Center. In 2006, the St. Cloud Civic Center completed a $1.5M interior
                          renovation of the facility that included mostly finish upgrades and a general face lift. In 2005, the city completed
                          is financial obligation for the original project bond and began accumulating funds for the expansion project.

                          Since the completion of the major renovation in 1995, the Civic Center has been considering a number of
                          expansion options. Hagemeister and Mack Architects was retained at that time to assist the City in the
                          planning process. All of the options considered expansions to the west and/or south based on the loca-
                          tion of the facility along the banks of the Mississippi River. A significant factor in the facility expansion op-
                                                                                                                                         page
Project Update 3/1/2010   St. Cloud Civic Center Expansion                                                 Hagemeister Mack Architects
                                                                                                                                          2.1
             2
                          tions included the need for relocating the existing public library located directly west of the Civic Center
Background                across 4th Avenue. Consideration was also given to use of the existing library, or even the inclusion of that
Narrative                 function within the Civic Center facility. That issue was a significant barrier to serious progression of the
                          project. The Civic Center project simply couldn’t move ahead until the library found a new home. The
                          plan options changed a number of times as the years passed and the political and budget climate changed.

                          In 2003 the City passed a referendum authorizing a ½ % General Sales tax that would fund a new library
                          project. With that in place, planning for the Civic Center became more focused and the City moved for-
                          ward with negotiations to secure the balance of the site from the owners of M&H Appliance. In 2008, the
                          library opened the doors to a new facility located approximately 8 blocks to the west on St. Germain Street.

                          Although a number of expansion options have been studied over the past 12 years, the final design focused
                          on what has been termed the preferred “west option”. This option has been reviewed by a number of gov-
                          ernment bodies, including the St. Cloud City Council, who formally approved the “west option” as the one
                          to be pursued further in design and for consideration for state funding. With this government approval, the
                          above property issues resolved, and $2M in state bonding money previously appropriated for design and
                          acquisition of the needed property, the site area for the expansion is available and ready for development.




                                                                   rth
                                                                 No
                                                          et
                                                        re
                                                 t   St
                                               1s

                                                                                                   4t       Kelly Inn
                                                                                                     hA
                                                                                                       ve



                                                                                                                        Grand Central
                                                                                                                        Parking Ramp
                                                                                                                        (349 stalls)
                                                                         Radisson Hotel




                                                             t                            5t
                                                           e                                hA
                                                        re                                    ve
                                                     St
                                               ain
                                            m
                                          er
                                       .G
                                     St


                          Aerial photograph of Civic Center and surrounding area, showing location of proposed project.

                          The existing Civic Center is approximately 110,000 sf in size and includes two large trade show/ conven-
                          tion spaces along with support spaces such as prefunction/lobby areas, break-out rooms, catering kitchens,
                          storage, and other support spaces. The facility also includes two levels of parking directly below the facil-
                          ity at 74,500 sf for each level or approximately 350 total stalls. The existing facility is host to a number of
                          conventions and trade shows. Its central location in the state makes it the perfect location for a variety
                          of functions, shows and meetings. Some of the larger tradeshow functions include: The Sportsman’s Show,
                          The Home Show, The Quilters’ Convention and the Farm Show. Many of these events are growing to the
                          point of not having enough space for their functions. At least two major events previously held at the Civic
                          Center have moved to another venue due to space limitations. The basis for the expansion has been well
                          documented in a detailed study completed by Convention, Sports and Leisure (CSL) in 2002 and updated in
                          2004. The report included interviews of many of the facility users along with an analysis of the market and
                          what an expanded Civic Center could support in terms of additional space. Portions of that document are
                          included in this predesign. The full report is available upon request. Design planning has also been inclusive
                          of the Civic Center facility operators, facility users, City Council and ad hoc groups with various community
                          concerns. Input from all of these sources has been incorporation into the progression of the design process.


                                                                                                                                          page
Project Update 3/1/2010   St. Cloud Civic Center Expansion                                                  Hagemeister Mack Architects
                                                                                                                                          2.2
             2
Background
Narrative




                          Site Plan of proposed expansion project.


                          Operational and Strategic Program

                          The proposed expansion will consist of a major trade/convention show expansion to the existing Terry Haws
                          Center located on the north end of the existing facility. Approximately 32,000 sf of large clear span space will be
                          added to the Terry Haws center, providing over 58,000 sf of contiguous trade show space in that room. The new
                          addition will also include the ability to subdivide the space into 2 bays, and will include movable walls between
                          Terry Haws and the new addition. This flexibility will provide for the ability to host 3 separate functions concur-
                          rently, or 4 if including the Glenn Carlson space on the south side of the facility. In addition to the main trade show
                          space, there will be a major prefunction / lobby space added directly to the south of the new trade show space
                          that will serve the new space, as well as facilitate the connection to the existing building and prefunction / lobby
                          areas. A service area to the north will include space for storage, catering kitchen, load in, refuse and other service/
                          support needs. The north end of the site will allow for a significant staging and marshalling area, which has been
                          a major detriment to the current facility operations. The total new area of the expansion will be approximately
                          84,500 sf, bringing the total area of the facility, not including the two exist-
                          ing parking levels or the new parking ramp, to approximately 194,000 sf.

                          The project will also include the construction of a new parking ramp that
                          will be located directly west of the new addition across 5th Avenue. The
                          ramp will be located on an existing public surface lot and will include
                          approximately 300 stalls initially. The ramp will be designed to expand
                          to approximately 600 stalls total. The ramp will serve the Civic Center
                          for major events, but will also be available full time for general down-
                          town parking, as well as for permit patrons who work in the downtown
                          area. The use of the ramp for various functions and needs should make
                          it a well-used public parking facility. A skyway is being master planned
                          into the project to accommodate a connection from the ramp to the
                          Civic Center. The project will also include a significant public plaza on
                          the south side of the facility, responding to the new south entrance and
                          reconfiguration of 4th Avenue. The plaza will provide for a covered drop-
                          off area, and landscaping that will respond to the downtown character Beaver Island Trail
                          and existing streetscape elements established throughout the downtown
                                                                                                                                            page
Project Update 3/1/2010   St. Cloud Civic Center Expansion                                                    Hagemeister Mack Architects
                                                                                                                                             2.3
             2
                          area. A new “Mississippi River Access” point will also be developed at the north end of the existing facility to
Background                accommodate access to the existing Beaver Island Trail that runs directly adjacent to the Civic Center and
Narrative                 Mississippi River. The Beaver Island Trail extends from the Civic Center through St. Cloud State University
                          and south to 33rd Avenue South. The trail will be extended north of the Civic Center to the St. Cloud Hos-
                          pital, creating a 5 mile trail that runs adjacent to the Mississippi River and connected key areas of the City.

                          The Civic Center is being master planned to accommodate a subsequent future addition of approximately
                          37,000 sf, that will allow for a “third” trade show bay matching the size of the two completed in this proj-
                          ect. Along with the trade show expansion will be an expansion of the prefunction / lobby and services areas
                          to the north and south of the main space. A surface parking lot in that area in the meanwhile will allow
                          for that future expansion. As noted above, the new parking ramp will be designed for future expansions,
                          and will be expanded as needed when the Civic Center completes the anticipated “third bay” expansion.

                          Project History

                          December 1986
                          OLD CITY HALL/POST OFFICE IS DEMOLISHED TO MAKE ROOM FOR ST. CLOUD CIVIC CENTER. Built
                          in 1902, it originally held the St. Cloud Post Office and the United States Land Office. In 1937 it was moved
                          four blocks east to become the City Hall offices. City Hall opened its doors in 1938 in this building.

                          June 1986
                          TWO OPTIONS FOR THE COMBINED FIELD HOUSE/CIVIC CENTER ARE PRESENTED TO THE
                          ST. CLOUD CITY COUNCIL. Option A includes using the old city hall building and Option B removes the
                          old city hall building.

                          February 1987
                          ST. CLOUD CITY COUNCIL APPROVES SITE PLANS AND A $9.4M BUDGET FOR THE CIVIC CENTER.
                          Budget changes several times over the months following.

                          May 6, 1987
                          POLICE DEPARTMENT IS RAISED TO MAKE ROOM FOR THE ST. CLOUD CIVIC CENTER. Completed in
                          1918, this building held city offices from 1918 to 1937.

                          1988
                          THE NEW FACILITY IS COMPLETED AS A COMBINATION COMMUNITY CENTER AND CONVENTION
                          CENTER WITH NO STATE CONTRIBUTIONS.
                          Project funded by a 1% local Food and Beverage sales tax.

                          January 13, 1989
                          ST. CLOUD CIVIC CENTER OPENS ITS DOORS TO THE PUBLIC DURING A DEDICATION CEREMONY.

                          January 15, 1989
                          ST. CLOUD CIVIC CENTER HOLDS ITS FIRST EVENT, A BRIDAL SHOW.

                          1992
                          THE ST. CLOUD CIVIC CENTER HAS OPERATIONS IN THE BLACK. Facility operation costs, maintenance,
                          and replacement costs are accounted for in the annual operations budget.

                          1995
                          THE TERRY HAWS COMMUNITY SPACE IS RENOVATED INTO TRADE SHOW AND CONVENTION
                          SPACE. Formally wood floor sports courts, a running track, lockers rooms and storage, this area is turned into
                          more trade show and convention space.

                          2003
                          THE CITY OF ST. CLOUD PASSES A 1/2 % GENERAL SALES TAX TO FUND A NEW LIBRARY.
                          The civic center expansion project became more focused.




                                                                                                                                      page
Project Update 3/1/2010   St. Cloud Civic Center Expansion                                              Hagemeister Mack Architects
                                                                                                                                      2.4
             2
                          2005
Background                THE CITY COMPLETED ITS FINANCIAL OBLIGATION FOR THE ORIGINAL PROJECT BOND AND
Narrative                 BEGAN ACCUMULATING FUNDS FOR THE EXPANSION PROJECT.

                          2006
                          A $1.5M INTERIOR RENOVATION IS COMPLETED THAT INCLUDED FINISH UPGRADES AND A GEN-
                          ERAL FACELIFT.

                          2007
                          THE CITY OF ST. CLOUD SUBMITTED A CAPITAL REQUEST FOR THE EXPANSION PROJECT.

                          2008
                          THE LIBRARY OPENED THE DOORS TO A NEW FACILITY, EIGHT BLOCKS WEST OF THE EXISTING
                          SITE.

                          2008
                          STATE BONDING BILL PROVIDED $2 MILLION TOWARD THE EXPANSION THAT WAS MATCHED BY
                          THE CITY OF ST. CLOUD FOR A TOTAL OF $4 MILLION. The total $4 Million is being used to acquire the
                          existing site area, demolish the existing building, prepare the site for construction and complete the planning
                          and design process.

                          Fall 2009
                          THE FORMER ST. CLOUD PUBLIC LIBRARY BUILDING IS DEMOLISHED TO MAKE WAY FOR ST. CLOUD
                          CIVIC CENTER EXPANSION PROJECT.

                          2009
                          THE LEGISLATURE APPROVED ANOTHER $2 MILLION FOR THE PROJECT, BUT FUNDING WAS VE-
                          TOED.

                          2010
                          THE CITY OF ST. CLOUD IS REQUESTING PARTIAL PROJECT COSTS OF $15.1 MILLION IN STATE
                          FUNDING FROM THE 2010 LEGISLATURE TO ASSIST IN PLANNING, DESIGN, CONSTRUCTION AND
                          EQUIPMENT COSTS, TO FINISH THE PROJECT. A local contribution of $15.1 million would be matched to-
                          wards the project using proceeds from an existing 1% Food and Beverage tax to retire a Debt Service Bond,
                          with a total expansion cost of $34,200,000.

                          July, 2010
                          ANTICIPATED DATE CONSTRUCTION CREWS ARE EXPECTED TO ARRIVE, PROVIDED FUNDING IS
                          GRANTED.

                          September, 2011
                          ANTICIPATED DATE CONSTRUCTION WILL BE COMPLETED WITH A CERTIFICATE OF OCCUPANCY
                          OBTAINED, PROVIDED FUNDING IS GRANTED.

                          Conclusion

                          The need for this project has been identified and debated for over 12 years. From the CSL study and input from
                          facility users, it is clear that the expansion is needed and will be financially viable.The impact the project will have
                          on the Central Minnesota region will be significant. The design and construction of the project will bring numer-
                          ous jobs to the area during difficult times, and with the completion of the project, significant dollars will be inject-
                          ed into the local and regional economy through the use of the facility. It’s time for this project to move forward.




                                                                                                                                             page
Project Update 3/1/2010   St. Cloud Civic Center Expansion                                                    Hagemeister Mack Architects
                                                                                                                                             2.5
             3
Project                   Project Description
Description

                          Expansion Project Program Summary

                          •	    2	story	entry/lobby	addition	on	the	South	side,	acting	as	a	“front	door”	and	providing	visible	access	points	
                                for	users.
                          •	    An	accommodating	and	open	lobby	/	pre-function	area	for	events.
                          •	    Additional	exhibit	hall	space	to	accommodate	larger	events,	including	concerts,	tradeshows,	sporting	
                                events,	receptions,	etc.
                          •	    Additional	storage	spaces	to	store	the	equipment	necessary	to	serve	the	building’s	diverse	events.
                          •	    Restroom	facilities	to	accommodate	up	to	4,600	occupants.
                          •	    Catering	kitchen	with	coolers/freezers	to	assemble	food	and	beverages	for	events.
                          •	    New	receiving	area	to	provide	for	loading	and	unloading	of	equipment	and	supplies	during	events.
                          •	    Offices	of	appropriate	size	and	location	to	meet	the	administrative	requirements	of	the	expanded	facility.
                          •	    Meeting	rooms	for	event	coordination.
                          •	    Stand	alone	parking	ramp	facility	for	approximately	300	vehicles,	with	expansion	for	up	to	600.


                          EXISTING	SPACE	TABULATION

                                	                                                  Area	(s.f.)
                           1st	Floor	                                                               2nd	Floor	
                                Terry	Haws	Hall	.............................. 26,486                                                  .
                                                                                                        Lobby	/	Circulation	...........................2,963
                                                               .
                                Glenn	Carlson	Hall	........................ 15,024                      Storage	.................................................5,100
                                Lobby	....................................................7,900         Restrooms	...........................................1,016
                                Restrooms	...........................................2,032              Office	....................................................1,576
                                Storage	.................................................1,644          Meeting	Rooms	..................................8,840
                                                    .
                                Concessions		.........................................421                                    .
                                                                                                        Running	Track	.....................................8,000
                                Catering	Kitchen	................................2,273	                 Common	/	Misc.	.................................7,505
                                                .
                                Circulation	..........................................6,305
                                Office	.......................................................414         TOTAL ...................................35,000
                                Common	/	Misc.	.............................. 12,001

                                 TOTAL ...................................74,500                          GRAND TOTAL ..................109,500


                          NEW	SPACE	PROGRAM	TABULATION
                                	                                                 Area	(s.f.)
                           1st	Floor	                                                               2nd	Floor	
                                                    .
                                Trade	Show	A	.................................. 16,000                  Prefunction	/	Lobby	...........................4,952
                                                    .
                                Trade	Show	B	.................................. 16,000                                .
                                                                                                        Circulation	..........................................3,150
                                Lobby	................................................. 10,890          Restrooms	...........................................1,040
                                Restrooms	..............................................812             Storage	.................................................8,192
                                Storage	.................................................1,309          Meeting	Rooms	..................................1,064
                                Circulation	/	Stairs	/	Elev.		................5,708                                                       .
                                                                                                        Mechanical	/	Electrical	.........................975
                                Catering	Kitchen	................................1,550	                 Common	/	Misc.	.................................3,627
                                Garage	/	Service	.................................2,191
                                Refuse	......................................................626          TOTAL ...................................23,000
                                Common	/	Misc.	.................................6,414

                                 TOTAL ...................................61,500                          GRAND TOTAL ....................84,500

                                                                                                          GRAND COMBINED .........194,500




                                                                                                                                                                           page
Project Update 3/1/2010   St. Cloud Civic Center Expansion                                                                           Hagemeister Mack Architects
                                                                                                                                                                           3.1
             3
Project                   Significant Code Issues
Description               Due	to	the	location	of	the	Civic	Center	addition,	3	exits	from	the	west	side	of	Terry	Haws	Hall	will	need	to	
                          be	relocated	to	maintain	the	required	number	of	exits.		The	building	expansion	will	be	adding	up	to	4,600	
                          more	occupants,	according	to	building	code	calculations,	depending	on	the	event.		Examples	of	anticipated	oc-
                          cupant	loads	for	some	events	include:

                          •	   Musical	concert	-	floor	and	bleacher	seating	of	approximately	3,000.
                          •	   Boxing/wrestling/ultimate	fighting	match	-	floor	and	bleacher	seating	of	approximately	1,600.
                          •	   Tradeshow	event	-	approximately	two	hundred	8x10	booths	with	up	to	4,600	visitors.

                          The	Civic	Center	addition	will	require	a	minimum	of	4	new	exits	with	a	total	required	exit	width	of	approxi-
                          mately	76	feet.		The	increased	occupant	load	in	the	facility	will	require	approximately	19	toilets/urinals	for	
                          men,	36	toilets	for	women,	and	12	lavatories	for	each.	

                          The	existing	Civic	Center	is	built	of	Type	I,	fire	resistive	construction	and	has	a	fully	automatic	sprinkler	
                          system.		The	Civic	Center	addition	will	be	constructed	as	Type	IB	and	will	have	a	fully	automatic	sprinkler	
                          system.		Currently	Minnesota	uses	the	2006	edition	of	the	International	Building	Code	with	Minnesota	State	
                          Amendments.		The	new	parking	ramp	will	be	constructed	as	Type	IIB	and	will	not	have	a	sprinkler	system.		The	
                          proposed	Civic	Center	addition	and	parking	ramp	will	be	designed	to	meet	applicable	codes,	including	acces-
                          sibility	requirements.

                          Specialty Requirements / Bibliography of Applicable Codes, Standards, etc.

                          Building	Systems	for	this	facility	will	be	designed	in	accordance	with	the	current	Minnesota	Building	Code,	as	
                          well	as	other	industry	standards	as	appropriate,	including	the	following:

                          •	   State	of	Minnesota	Design	Guidelines
                          •	   Minnesota	Sustainable	Building	Guidelines
                          •	   International	Building	Code	2006
                          •	   Minnesota	Building	Code	2007
                          •	   National	Fire	Protection	Standards	(NFPA)
                          •	   Minnesota	Fire	Code
                          •	   Chapter	7676	Minnesota	Energy	Code	1999
                          •	   Chapter	1346	Amendments	to	the	Uniform	Mechanical	Code	1994
                          •	   Chapter	4175	Minnesota	Plumbing	Code	1998
                          •	   National	Electric	Code	2002
                          •	   American	Society	of	Testing	and	Materials	(ASTM)
                          •	   Current	ADA	and	ADAAG	Guidelines
                          •	   Building	Air	Quality	-	A	Guide	for	Building	Owners,	Facility	Managers	and	Agent	Contacts

                          The	State	of	Minnesota	Building	Infrastructure	Guidelines	for	State	Owned	Buildings	are	not	applicable	to	this	
                          project,	since	it	is	a	project	for	a	local	government	unit.

                          See	Chapter	4	“Specialty	Requirement	Details”	for	additional	information.

                          Architectural Systems

                          The	following	is	a	description	of	the	materials	and	building	systems	envisioned	for	the	new	addition:

                          Concrete	&	Masonry

                          The	Civic	Center	addition	will	have	concrete	footings	consisting	of	strip	footings	and	pads	with	reinforcing	
                          steel	as	required	by	the	final	structural	design.		Foundations	will	consist	of	either	cast-in-place	concrete,	CMU	
                          or	precast	wall	panels.		Slab	on	grade	is	assumed	to	be	5”	thick	with	reinforcing	mesh	over	6”	granular	fill	
                          to	support	large	vehicles	within	the	Civic	Center.		Elevated	floor	slabs	are	assumed	to	be	either	12”	precast	
                          hollow	core	planks	with	2”	of	concrete	topping	or	4”	concrete	on	metal	deck	with	a	structural	steel	frame	
                          as	required.		The	parking	ramp	will	consist	of	a	combination	of	cast-in-place	concrete,	precast	concrete	and	
                          CMU	for	the	footings,	foundations,	floors	and	walls.
                                                                                                                                        page
Project Update 3/1/2010   St. Cloud Civic Center Expansion                                                Hagemeister Mack Architects
                                                                                                                                        3.2
             3
                          Structural	Steel
Project
Description               The	existing	Civic	Center	uses	a	structural	steel	frame	and	open	web	steel	roof	joists	above	grade.		The	roof	
                          height	of	the	Civic	Center	addition	is	expected	to	be	at	the	existing	roof	height	so	additional	snow	drift	load-
                          ing	should	not	occur	on	the	existing	facility.		The	addition	will	use	a	structural	steel	frame	and	open	web	steel	
                          roof	joists	to	match	the	existing	ceiling	height	in	Terry	Haws	Hall.		The	parking	ramp	is	not	expected	to	use	
                          any	structural	steel	beyond	concrete	reinforcing	and	smaller	members	for	stair	and	roof	support.

                          Roof	System

                          The	roof	for	the	Civic	Center	addition	is	expected	to	incorporate	a	ballasted	or	adhered	EPDM	roof.	It	is	
                          expected	that	the	existing	roof	will	be	re-roofed	in	a	similar	and	matching	system.

                          Exterior	Walls

                          The	new	exterior	shell	for	the	Civic	Center	addition	will	consist	of:
                          •	 Insulated	architectural	precast	panels	with	high	quality	finish	and	detailing.	Allows	for	future	expansion.
                          •	 Composite	metal	panels	at	the	south	wall.
                          •	 Glazed	curtain	wall	system	with	tinted	low	e	glass	and	spandrel	panels.

                          All	necessary	wall	insulation,	vapor	barriers	and	blocking	will	be	designed	to	comply	with	energy	code	re-
                          quirements	and	sustainability	goals.

                          Doors

                          The	entry	systems	will	include	aluminum	doors	and	frames,	and	required	egress	hardware.		Exterior	service	
                          doors	will	be	insulated	hollow	metal		Overhead	doors	will	be	insulated	sectional	steel	type	with	power	oper-
                          aters,	at	least14’-0”	x	14’-0”	to	accommodate	large	vehicles.

                          Interior	Finishes

                          Lobby:	                        Carpet	tile	flooring,	wood	veneer	panels,	granite	wainscot,	ACT	ceiling	and	
                                                         painted	gyp.	bd.	soffits,	display	cases	for	baseball	museum	and	local	art

                          Restrooms:	                    Tile	flooring,	tile	wall	to	ceiling	height,	ACT	ceiling,	accessible	fixtures	and	acces-
                                                         sories

                          Offices:	                      Carpet	flooring,	painted	walls,	carpet	base,	ACT	ceiling

                          Catering	Kitchen:	             Tile	flooring,	FRP	walls,	vinyl	ceiling	tile,	stainless	steel	work	surfaces

                          Exhibit	Hall:	                 Sealed	concrete	floors,	painted	CMU	or	precast	walls	some	CMU	walls	with	
                                                         acoustical	block,	vinyl	base,	exposed	metal	grid	ceiling	with	acoustical	spray	tex-
                                                         ture	on	roof	deck,	acoustical	panels	over	walls	in	some	locations,	movable	walls	
                                                         with	STC	rating	of	55	or	better

                          Stairs:	                       Service	stairs:	Rubber	flooring,	painted	walls,	exposed	painted	ceiling
                          	                              Finished	stairs:	Granite	treads	with	metal	risers	and	stainless	steel	railing	system

                          Concessions:	                  Sealed	concrete	floor,	painted	walls,	vinyl	tile	ceiling,	solid	surface	work	surfaces

                          Meeting	rooms:	                Carpet	flooring	and	base	painted	walls,	ACT	ceiling

                          Second	floor	lobby:	           Carpet	tile	flooring,	painted	gyp.	bd.	walls	and	wood	veneer	panels,	granite	wain-
                                                         scot,	ACT	ceiling	and	painted	soffits	and	specialty	lighting

                          Storage:	                      Sealed	concrete	floors,	painted	walls,	ACT	ceiling	or	exposed	ceiling

                          Loading	dock:	                 Sealed	concrete	floors,	painted	walls,	painted	ceiling.

                                                                                                                                             page
Project Update 3/1/2010   St. Cloud Civic Center Expansion                                                    Hagemeister Mack Architects
                                                                                                                                             3.3
             3
                          Service	corridor:	             Sealed	concrete	floor,	painted	walls,	ACT	ceiling
Project
Description               Parking	ramp:	                 Sealed	concrete	floors,	painted	or	exposed	concrete	walls	and	ceilings,	metal	
                                                         railing	detailing

                          Typical	framed	partitions	will	be	constructed	with	metal	studs	and	5/8”	gypsum	board	on	each	side.

                          Interior	doors	will	be	painted	or	prefinished	hollow	metal	with	metal	frames	with	acoustical	detailing

                          Ceilings	are	anticipated	to	be	either	suspended	24”	x	24”	acoustical	ceiling	tile,	painted	gypsum	board	or	
                          other	decorative	ceiling	system	(to	be	determined).		


                          Specialties

                          Toilet	partitions	and	urinal	screens	will	be	floor	mounted	solid	plastic,	and	restroom	accessories	will	be	pro-
                          vided	as	required.

                          Operable	walls	will	be	provided	to	subdivide	the	new	exhibit	hall	space	and	to	provide	separation	from	the	
                          existing	Terry	Haws	Hall	with	a	minimum	55	STC.

                          Fire	extinguishers	will	be	provided	in	metal	cabinets	in	public	areas	and	surface	mounted	in	non-public	areas,	
                          as	required	by	code.

                          Code	required	building	signage	will	be	provided.	Additional	signage	will	be	incorporated	on	the	exterior	
                          including	main	facility	identification	at	the	canopy	and	west	wall,	door	identification,	general	circulation	and	
                          directional	signs	and	electronic	event	signage	at	the	south	end	of	the	site	and	at	the	north	end	of	the	site.	
                          Special	signage	for	the	ramp	will	be	incorporated.	

                          Elevators

                          A	freight	elevator	will	be	provided	to	service	the	2nd	floor	storage	area	in	the	Civic	Center	addition.		A	pas-
                          senger	elevator	will	be	provided	to	service	the	parking	ramp.	A	passenger	elevator	will	also	be	provided	at	
                          the	SW	corner	of	the	Civic	Center	lobby	to	accommodate	Civic	Center	vertical	circulation	as	well	as	future	
                          skyway	traffic.

                          Mechanical Systems

                          Design Criteria

                          The	contractor	will	be	responsible	for	all	labor,	taxes,	overhead,	profit,	permits,	supervision,	material,	
                          equipment,	and	service	necessary	for	complete	electrical	systems	as	specified	herein	and	as	shown	on	the	
                          drawings.

                          •	       Comply	with	all	current	and	applicable	codes	and	standards	as	follows:

                          o	       Minnesota	Building	Code
                          o	       Minnesota	Plumbing	Code
                          o	       International	Building	Code
                          o	       International	Mechanical	Code
                          o	       National	Electrical	Code
                          o	       Minnesota	State	Board	of	Health
                          o	       Local	Applicable	Ordinances
                          o	       National	Fire	Protection	Association
                          o	       Minnesota	Energy	Code
                          o	       OSHA
                          o	       SMACNA
                          o	       ASHRAE
                          o	       Americans	with	Disabilities	Act
                                                                                                                                           page
Project Update 3/1/2010   St. Cloud Civic Center Expansion                                                   Hagemeister Mack Architects
                                                                                                                                           3.4
             3
Project                   HVAC Scope Option Descriptions
Description
                          Addition:	The	addition	will	be	served	by	8	custom	air	handling	units	with	chilled	water	cooling	and	hydronic	
                          heating.		Controls	will	feature	CO	outside	air	demand	limiting,	VAV	fan	energy	reduction,	system	scheduling,	
                          optimum	start/stop.		Heating	will	utilize	90-95%	condensing	boilers.

                          Existing	Building:	Replaces	13	existing	rooftop	units	with	“replace	in	kind”	units.	Retrofit	forty	(40)	pneumatic	
                          VAV	box	controls	with	new	DDC	controls.		Replace	VAV	box	reheat	coil	piping	and	piping	sundries	from	
                          reheat	coil	thru	shutoff	valves.		Provide	new	front	end	DDC	system	complete	with	workstation,	latest	
                          available	software,	full	graphics	for	all	HVAC	systems,	new	controllers	for	all	systems.

                          Demolition

                          Design Criteria

                          Contractor	shall	be	responsible	for	all	selective	demolition	of	the	existing	HVAC	systems	as	indicated	on	the	
                          drawings,	as	specified	herein,	and	as	required	to	maintain	complete	functioning	systems.

                          The	existing	HVAC	unit	replacement	has	three	options;	Option	A	utilizes	air-cooled	chillers	&	condensing	
                          boilers	with	custom	air	handling	units,	Option	B	utilizes	dedicated	outside	air	units	with	“replace	in	kind”	
                          units	for	the	smaller	meeting	rooms,	and	Option	C	utilizes	“replace	in	kind”	units.		There	is	considerably	more	
                          demolition	for	Options	A	&	B.

                          Existing	mechanical	installation	as	shown	on	the	drawings	may	not	be	completely	accurate	in	all	respects	
                          with	regard	to	quantities,	locations,	etc.	and	is	shown	primarily	to	generally	illustrate	the	degree	of	selective	
                          demolition	work	involved.

                          Scope

                          Selectively	demolish	rooftop	HVAC	units	and	duct	transitions	through	the	roof	only.

                          Selectively	demolish	natural	gas	piping	adjacent	to	the	units,	including	gas	shutoff	valve	and	regulator,	to	each	
                          of	the	existing	rooftop	units	for	reconnection	to	new	units.

                          Demolish	forty	(40)	pneumatic	VAV	box	controls	including	room	thermostats.		Demolish	VAV	box	reheat	coil	
                          piping	and	piping	sundries	from	reheat	coil	thru	shutoff	valves.

                          Phasing	will	generally	start	from	trade	show	spaces	and	progress	thru	meeting	rooms	and	offices	as	spaces	
                          are	available.		

                          Heating

                          Central Heating Plants

                          Addition

                          A	new	hydronic	condensing	boiler	system	will	provide	heat	for	unit	heaters,	reheat	coils,	and	eight	AHU	coils.		
                          System	will	have	CV	primary	pumps	for	each	boiler,	and	100%	redundant	VV	secondary	distribution	pumps.		
                          AHU’s	with	high	outside	air	percentage	will	have	CV	coil	pumps.	

                          There	will	be	three	(3)	2	million	btu/hr	boilers	based	on	Lochinvar	IBN2000	Intellifin	Condensing	Boilers.		
                          Hydronic	temperatures	will	be	design	around	a	120°F	supply	and	100°F	return	to	ensure	highest	possible	
                          boiler	operating	efficiencies.		Each	boiler	will	have	a	constant	volume	inline	circulation	pump	of	185	gpm	@	
                          25’	head.	

                          There	will	be	two	(2)	100%	redundant	pumps	with	350	gpm	@	60’	head	each.		Pumps	will	have	variable	
                          frequency	drives	with	system	pressure	control.		

                          Existing	Building:	“Replace	in	Kind”	units	will	reuse	the	existing	gas	piping	system.	
                                                                                                                                          page
Project Update 3/1/2010   St. Cloud Civic Center Expansion                                                  Hagemeister Mack Architects
                                                                                                                                          3.5
             3
                          	
Project                   Cooling
Description
                          Central Cooling Plants

                          Addition

                          A	new	air	cooled	chiller	system	will	provide	cooling	for	eight	AHU	coils.		System	will	have	CV	primary	pumps	
                          for	each	chiller,	and	100%	redundant	VV	secondary	distribution	pumps.	

                          There	will	be	two	(2)	200-ton	air-cooled	chillers	based	on	York	YCIV0197VA46.


                          There	will	be	two	(2)	100%	redundant	pumps	with	800	gpm	@	60’	head	each.		Pumps	will	have	variable	
                          frequency	drives	with	system	pressure	control.		

                          Existing	Building:	“Replace	in	Kind”	units	will	dx	cooling.	

                          Terminal Units

                          Unit	heaters	will	be	provided	at	each	of	the	overhead	doors;	loading	docks,	and	trash	room.		Heaters	will	be	
                          derated	for	120°F	supply	and	100°F	return	operating	temperatures.

                          Cabinet	unit	heaters	will	be	provided	at	each	of	the	exterior	vestibules	and	Terry	Haws	overhead	doors.		
                          Heaters	will	be	derated	for	120°F	supply	and	100°F	return	operating	temperatures.

                          VAV	reheat	boxes	will	be	provided	at	the	meeting	rooms	and	storage	rooms	to	provide	individual	zoning.	
                          Coils	will	be	rated	for	120°F	supply	and	100°F	return	operating	temperatures.	Each	VAV	box	shall	have	in	
                          order;	shutoff	valve,	strainer,	equal	percentage	control	valve,	coil,	air	vent,	circuit	setter,	shutoff	valve.		Provide	
                          Petes	plugs	on	entering	and	leaving	sides	of	coil	for	insertion	of	temperature	and/or	pressure	probes.

                          Hydronic Piping

                          Piping	will	be	sch	40	welded	steel	for	3”	and	larger,	and	Type	“L”	copper	with	95/5	tin/antimony	solder	for	
                          2-½“	and	smaller.		Piping	for	the	Lobby	entrances	will	routed	through	supply	tunnel	and	encased	in	conduit	
                          where	they	are	required	to	penetrate	the	tunnel	wall	below	grade.		Insulation	shall	be1”	thick	fiberglass	with	
                          all	service	jackets.

                          Addition

                          The	heating	system	will	serve	unit	heaters,	reheat	coils,	and	eight	AHU	coils.		The	heating	piping	mains	are	4”	
                          heating	water	supply	and	return	in	a	branched	configuration	limited	to	the	addition.	The	cooling	system	eight	
                          AHU	coils.		The	cooling	piping	mains	are	8”	chilled	water	water	supply	and	return	in	a	branched	configuration	
                          limited	to	the	addition.

                          Existing Building

                          	“Replace	in	Kind”	units	will	dx	cooling	and	gas	heating	with	no	hydronic	piping	required.		Existing	radiation	
                          piping,	fin	tube	radiation,	and	cabinet	unit	heaters	will	remain	as	is	with	some	minor	exceptions	where	
                          radiation	is	no	longer	need	due	to	building	modifications.		Existing	reheat	piping	will	remain	as	is	except	the	
                          VAV	box	reheat	coil	piping	and	piping	sundries	from	reheat	coil	thru	shutoff	valves	will	be	replaced.	Each	
                          VAV	box	shall	have	in	order;	shutoff	valve,	strainer,	equal	percentage	control	valve,	coil,	air	vent,	circuit	setter,	
                          shutoff	valve.		Provide	Petes	plugs	on	entering	and	leaving	sides	of	coil	for	insertion	of	temperature	and/or	
                          pressure	probes.




                                                                                                                                              page
Project Update 3/1/2010   St. Cloud Civic Center Expansion                                                     Hagemeister Mack Architects
                                                                                                                                              3.6
             3
                          HVAC
Project
Description               Design Parameters

                          Outside	air	conditions:	Summer	92	/	76	°F	db	/	wb,		Winter	-20	°F

                          Inside	air	conditions:		Summer	75	°F	&	50%	RH,		Winter	72	°F	

                          Cooling	and	heating	requirements:	Based	on	CLTD	cooling	method	on	Trane	Trace	calculation	program.

                          Ventilation	requirements:		Ventilation	air	requirements	are	calculated	per	requirements	of	ASHRAE	62.1-2004.		
                          Occupancy	is	based	on	space	usage	as	determined	by	programming	or	people	/	sq	ft	as	calculated	by	62.1-
                          2004.	

                          Exhaust	requirements:		Toilet	/	showers	and	janitor	room	exhaust	requirements	are	based	on	2	cfm/sq	ft.	
                          slightly	above	ASHRAE	62.1-2004	to	assure	moisture	and	odor	removal.	


                          Design Criteria

                          New	Terry	Haws	Center	and	Lobby	systems	are	based	on	multiple	single	zone	VAV	air	handling	units	with	
                          dx	cooling	and	hydronic	heating.		Units	will	have	return	fan,	filter	section,	dx	cooling	coil,	hydronic	heating	
                          coil,	and	supply	fan.		Systems	will	provide	airflow	rate	required	to	maintain	dry	bulb	temperature	setpoint.		
                          Cooling	supply	air	temperature	will	be	maintained	at	about	55°F	(resettable)	to	maintain	humidity	control.		
                          Economizer	will	be	fully	functional	to	ensure	full	free	winter	cooling	capability	is	maintained.		See	further	
                          description	under	controls	section.	

                          Meeting	rooms	and	back	of	house	space	systems	are	configured	as	variable	air	volume	reheat	systems	with	
                          30%	minimum	airflow.		Units	will	have	return	fan,	filter	section,	chilled	water	cooling	coil,	hydronic	heating	coil,	
                          and	supply	fan.		Systems	will	provide	variable	airflow	rate	required	to	maintain	cooling	temperature	setpoint.		
                          Reheat	will	be	enabled	whenever	the	minimum	airflow	rate	is	not	capable	of	maintaining	heating	setpoint	
                          temperature.		Economizer	will	be	fully	functional	to	ensure	full	free	winter	cooling	capability	is	maintained.		
                          See	further	description	under	controls	section.

                          Existing	Terry	Haws	Center	and	Glenn	Carlson	Hall	replacement	provides	inexpensive	“replace	in	kind”	
                          packaged	gas	heating	and	electric	cool	rooftop	units	on	curb	adapters	fitted	to	existing	curbs.		Units	will	be	
                          VAV	to	provide	fan	energy	savings	and	dehumidification	at	partial	load.

                          Existing	Meeting	Rooms	and	Offices	replacement	provides	inexpensive	“replace	in	kind”	packaged	gas	heating	
                          and	electric	cool	rooftop	units	set	on	curb	adapters	fitted	to	existing	curbs.		Units	will	be	VAV	to	provide	to	
                          match	needs	of	the	VAV	boxes.

                          Supply	ductwork	from	the	AHUs	to	the	VAVs	shall	be	“Medium	Pressure”	4	inwg	pressure	class	construction	
                          with	a	maximum	velocity	of	1800	fpm	and	a	maximum	friction	loss	of	0.10	inwg/100’	duct.		All	other	ductwork	
                          (except	parking	garage	exhaust	duct)	shall	be	“Low	Pressure”	2	inwg	pressure	class	construction	with	a	
                          maximum	velocity	of	1500	fpm	and	a	maximum	friction	loss	of	0.06	inwg/100’	duct.		

                          Exhaust	systems	include	three	(3)	toilet	room	exhausts	for	the	Lobby	and	back	of	house	groupings,	four	(4)	
                          exhausts	for	the	loading	dock	vehicle	exhaust	control,	one	(1)	exhaust	for	catering,	and	one	(1)	exhaust	for	
                          trash	odor	control.

                          Existing	parking	garage	exhaust	systems	will	have	two	(2)	replacement	exhaust	fans	on	the	roof	with	
                          ductwork	relocated	and	integrated	into	the	new	building	addition.		Parking	garage	exhaust	ductwork	will	
                          extend	from	the	upper	parking	and	lower	parking	levels,	connected	by	level,	through	the	roof	of	the	addition.		
                          Below	grade	will	be	fiberglass,	and	above	grade	will	be	galvanized	as	described	in	the	product	section.		Parking	
                          garage	exhaust	ductwork	shall	be	“Low	Pressure”	2	inwg	pressure	class	construction	with	a	maximum	
                          velocity	of	1500	fpm	and	a	maximum	friction	loss	of	0.08	inwg/100’	duct.		for	the	existing	parking	garage,

                          Noise	level	goal	for	the	HVAC	systems	(without	contribution	from	background	noise	will	be	less	than	RC	
                          (N)	30	for	trade	show	spaces,	and	RC	(N)	35	for	meeting	rooms.		This	goal	will	require	careful	selection	of	
                                                                                                                                          page
Project Update 3/1/2010   St. Cloud Civic Center Expansion                                                  Hagemeister Mack Architects
                                                                                                                                          3.7
             3
                          equipment,	and	use	of	duct	sound	attenuators	in	key	areas.
Project
Description               Zone	controls	will	be	updated	with	new	DDC	local	area	controllers,	sensors,	actuators,	and	control	wiring.		
                          VAV	controls	will	provide	airflow	control,	airflow	monitoring,	discharge	temperature	monitoring,	zone	
                          temperature	control,	space	temperature	sensor	with	limited	setpoint	adjustment.

                          Product

                          Addition AHUs

                          There	are	eight	custom	air	handling	units:	four	(4)	14,000	cfm	units,	two	(2),	21,500	cfm	units,	one	(1)	6,500	
                          cfm,	one	(1)	2,000	cfm.		Custom	air	handling	units	for	the	addition	will	be	have	return	fan,	economizer	section,	
                          filter	section,	dx	cooling	coil,	hydronic	heating	coil,	and	supply	fan.		Housing	will	be	4”	dual	wall	insulated	
                          system	with	sloped	roof	for	outdoor	service.		Supply	and	return	fans	will	have	variable	frequency	drives	and	
                          “out	of	airstream”	inlet	venture	flow	sensors.		Fans	will	have	AcoustiFlo™	sound	attenuating	shrouds	to	
                          lower	the	sound	power	at	the	AHU.		Coils	will	be	sized	for	a	maximum	velocity	of	450	fpm.		Filters	shall	be	
                          2”	MERV	8	prefilter	&	12”	MERV	11	postfilter.		Dampers	shall	be	very	low	leak	with	insulated	and	thermally	
                          broken	blades.		Custom	units	are	based	on	Haakon™.

                          Existing	Glenn	Carlson	&	Terry	Haws	AHUs:		There	are	six	“replace	in	kind	units”:	(3)	30-ton,		(3)	50-ton.		
                          Units	are	“replace	in	kind”	packaged	gas	heating	and	electric	cool	rooftop	units	on	curb	adapters	fitted	
                          to	existing	curbs.		The	existing	ductwork	has	sound	attenuators	that	will	remain	in	place	for	the	alternate.	
                          Replace	in	kind	units	are	based	on	Carrier	48A.

                          Existing	Meeting	Rooms,	Offices,	and	Corridor		AHUs:		There	are	seven	“replace	in	kind	units”:	(4)	25-ton,		(2)	
                          30-ton,		(1)	40-ton.		The	“replace	in	kind”	units	are	packaged	gas	heating	and	electric	cool	rooftop	units	on	
                          curb	adapters	fitted	to	existing	curbs.		The	existing	ductwork	has	sound	attenuators	that	will	remain	in	place	
                          for	the	alternate.		Replace	in	kind	units	are	based	on	Carrier	48A.

                          Exhaust	systems	will	utilize	up	blast	or	sidewall	centrifugal	fan	systems	to	disperse	odors	based	on	Greenheck	
                          CUBE	AND	CWB	models	respectively.

                          Above	grade	ductwork	shall	be	G90	galvanized	sheetmetal	constructed	to	SMACNA	construction	standards.	
                          Rectangular	duct	shall	have	TDC	joints,	and	round	duct	shall	be	spiral.		Provide	five	feet	of	tedlar	lined	flexible	
                          ductwork	for	the	final	connection	to	each	lay-in	ceiling	diffuser.	Exposed	ductwork	will	be	constructed	of	
                          paint	grip	galvanized	sheetmetal.		Insulation	consists	of	1	½”	thick	3	lb.	density	semi-rigid	glass	fiberboard	for	
                          rectangular	duct	and	1	½”	thick	1-½	lb.	density	flexible	fiber	blanket	for	round	duct.		All	insulation	will	have	a	
                          foil	scrim	vapor	barrier.		Exposed	supply	duct	in	the	Terry	Haws	Center	will	not	be	insulated.

                          Below	grade	exhaust	ductwork	shall	be	dual	duct	insulated	fiberglass	reinforced	plastic	(FRP)	ductwork	based	
                          on	Spunstrand	FSK	R4.		Duct	shall	be	engineered	for	expected	soil	loading	conditions,	have	an	‘R’	Value	of	4,	
                          and	a	U.L.	listed	fire	retardant	liner.		The	Lobby	will	be	served	by	an	accessible	underground	concrete	tunnel	
                          with	1½”	thick	extruded	Styrofoam	under	the	floor	and	on	the	exterior	of	the	walls.		Duct	extensions	from	
                          the	tunnel	will	be	FRP.

                          Supply	ductwork	and	return	ductwork	mains	shall	be	constructed	with	low	pressure	loss	fittings	without	
                          constrictions	that	can	generate	noise.		Elbows	shall	be	minimum	1.5	centerline	radius	only	and	tighter	bends	
                          shall	be	constructed	with	splitter	elbows	to	achieve	the	same	minimum	1.5	centerline	radius.		Branch	mains	
                          shall	be	constructed	using	proportional	airflow	splits	and	elbows	as	appropriate.		Offsets	shall	be	limited	
                          to	only	those	required	by	permanent	physical	obstructions;	Contractor	shall	coordinate	all	work	to	avoid	
                          unnecessary	offsets.		

                          Offsets	and	transitions	shall	be	limited	to	a	1	to	2	ratio	for	converging	and	a	1	to	3	ratio	for	diverging	flow.		
                          Branch	ductwork	may	utilize	45	degree	entry	taps	or	low	loss	manufactured	fittings.			No	straight	taps	are	
                          allowed.

                          Sound	attenuators	will	be	located	near	the	AHU’s	to	reduce	the	space	noise	levels.		Selections	are	based	on	
                          60”	long	VibroAcoustics™	RFL-LV-F2.

                          Lay-in	diffusers	shall	be	rectangular	high	efficiency	type.		Exposed	duct	shall	have	two-way	airfoil	blade	surface	
                                                                                                                                          page
Project Update 3/1/2010   St. Cloud Civic Center Expansion                                                  Hagemeister Mack Architects
                                                                                                                                          3.8
             3
                          mount	diffusers.		Lay-in	return	grilles	shall	be	eggcrate	with	frame	to	allow	sound	boot	to	be	attached.		
Project                   Exposed	ductwork	(Terry	Haws)	shall	have	perforated	diffusers	based	on	McGill	Duct-D-Fuser™.
Description
                          Provide	return	grilles	with	galvanized	transfer	boot	lined	with	1”	thick	3psf	acoustic	duct	lining.		Boot	shall	
                          have	two	mitered	elbows	(one	vertical	and	one	horizontal)	and	no	line	of	sight	in	either	direction.

                          Automatic Temperature Controls

                          Direct	Digital	Controls	(DDC)	that	is	compatible	with	the	existing	Building	Automation	System	(BAS).		DDC	
                          system	shall	provide	control	of	all	HVAC	functions	including;	temperature	setpoints,	occupancy	scheduling,	
                          monitoring	&	alarming	points,	and	trending	functions.

                          New	Terry	Haws	and	Lobby	air	handling	units	will	have	field	supplied	controls	capable	of	providing;	CO	based	
                          outside	air	demand	limiting,	individual	return	&	relief	plenum	pressure	control,	individual	supply	&	return	fan	
                          speed	control,	unit	supply	&	return	airflow	differential	reset	by	common	building	static	pressure,	coil	pump	
                          enable,	heating	coil	modulated	control,	dx	staging	and	hot	gas	bypass	control.

                          New	Meeting	Rooms	and	Storage	air	handling	units	will	have	field	supplied	controls	capable	of	providing;	
                          Occupancy	based	outside	air	demand	limiting,	individual	return	&	relief	plenum	pressure	control,	individual	
                          supply	&	return	fan	speed	control,	unit	supply	&	return	airflow	differential	reset	by	common	building	static	
                          pressure,	coil	pump	enable,	heating	coil	modulated	control,	dx	staging	and	hot	gas	bypass	control.	New	VAV	
                          reheat	boxes	will	have	analog	outputs	(air	volume	damper,	hydronic	reheat	valve)	and	analog	inputs	(space	
                          temperature,	discharge	air	temperature,	airflow)	controlled	by	local	area	controllers.

                          Existing	building	air	handling	units	will	utilize	inexpensive	“replace	in	kind”	packaged	VAV	gas	heating	and	
                          electric	cool	rooftop	unit	control.		Control	is	limited	to	monitoring	and	enable	strategies	utilizing	a	BacNet	or	
                          LonWorks	communications	card.

                          Existing	VAV	reheat	boxes	will	have	analog	outputs	(air	volume	damper,	hydronic	reheat	valve)	and	analog	
                          inputs	(space	temperature,	discharge	air	temperature,	airflow)	controlled	by	local	area	controllers.

                          Plumbing

                          Design Criteria

                          Plumbing	modification	involve	rerouting	of	rainwater	piping	from	the	west	face	of	existing	building	to	new	
                          locations	at	the	building	connection	of	the	new	addition.

                          New	plumbing	work	involves	stacked	men’s	and	women’s	restrooms	in	the	front	of	the	house,	and	
                          miscellaneous	restrooms	and	janitor’s	rooms.		Fixture	count	is	approximately	8	urinals,	32	water	closets,	
                          33	lavatories,	1	shower,	5	janitor’s	sinks,	8	water	coolers,	4	three	compartment	sinks,	6	kitchen	sinks,	1	
                          commercial	dishwasher,	4	hose	bibbs.	

                          Domestic	water	piping	sizing	shall	be	shall	have	a	maximum	velocity	of	8	fpm,	a	maximum	friction	loss	of	2.5	
                          psi/100’	pipe,	and	the	Minnesota	Pluming	Code.		Domestic	required	water	service	size	is	4”	with	current	
                          demand	for	both	existing	and	new	building	loads.

                          The	existing	3”	water	service	is	routed	below	a	portion	of	the	existing	building,	and	approximately	25’	of	the	
                          existing	main	will	be	retained.		Site	utilities	will	provide	a	4”	new	connection	to	the	existing	3”	main	5’	outside	
                          of	the	existing	building	line	to	the	relocated	street	main.		The	existing	3”	meter	will	remain	but	a	4”	main	after	
                          the	meter	will	extend	to	connect	to	the	3”	existing	main	above	the	first	floor	ceiling	and	tee	into	a	new	3”	
                          main	for	the	new	addition.

                          Product

                          Domestic	water	piping	shall	be	type	“L”	copper	with	95/5	tin/antimony	solder.	Insulation	shall	be	1”	thick	
                          fiberglass	with	all	service	jacket.

                          Sanitary	drain,	rainwater	leader,	waste,	and	vent	piping	shall	be	no-hub	cast	iron.

                                                                                                                                         page
Project Update 3/1/2010   St. Cloud Civic Center Expansion                                                 Hagemeister Mack Architects
                                                                                                                                         3.9
             3
                          Water	closets	shall	be	vitreous	china,	elongated	bowl,	wall	mount	(with	carrier),	flush	valve,	1.6	gallons	per	
Project                   flush,	with	open	front	seat.
Description
                          Urinals	shall	be	vitreous	china,	wall	mount	(with	carrier),	flush	valve,	0.5	gallons	per	flush.

                          Lavatories	shall	be	vitreous	china,	wall	mount	(with	carrier),	with	grid	drain,	and	single	lever	faucet	with	4”	
                          centers.

                          Water	Coolers	shall	be	dual	level	ADA	8gph	recessed	units.

                          Elevator	in	the	Addition	and	at	the	Ramp	(typical	of	3)	will	have	sumps	with	dual	sump	pumps.

                          Four	vehicle	bays	in	the	Addition	will	have	trench	drains	that	drain	through	a	flammable	waste	trap.		All	of	the	
                          area	drains	in	the	Ramp	will	drain	to	a	through	a	flammable	waste	trap.		

                          Fire Protection

                          The	existing	building	is	currently	sprinkled	throughout.			The	piping	system	within	the	existing	building	will	
                          modified	to	provide	the	required	coverage	for	the	new	architectural	layout.		Recessed	pendent	sprinkler	
                          heads	will	be	used	in	most	areas.

                          The	existing	standpipe	system	will	be	extended	to	the	2	new	stairwells	within	the	addition.	A	new	standpipe	
                          with	2-1/2”	hose	connections	at	each	landing	will	be	provided	in	each	stair.	Standpipe	distribution	will	be	8”	
                          for	the	portion	of	piping	serving	the	chair	storage	area	(see	below).		Remaining	standpipe	distribution	piping	
                          will	be	6”.
                          		
                          The addition will be served by 5 new sprinkler zones

                          Two	zones,	one	on	each	floor,	will	be	connected	to	the	standpipe	at	the	southwest	stair	of	the	addition	
                          (noted	as	Stair	102	on	the	First	Floor).	These	zones	will	serve	the	two	levels	of	Area	2.

                          Three	additional	zones,	one	on	each	floor	and	one	for	the	exhibition	space,	will	be	connected	to	the	
                          standpipe	at	the	northeast	stair	of	the	edition	(noted	as	Stair	124	on	the	First	Floor).	These	zones	will	serve	
                          the	two	levels	of	Area	1.

                          The	existing	8”	fire	service	is	routed	below	a	portion	of	the	addition	and	will	need	to	be	relocated	south	
                          approximately	50	feet	and	reconnected	to	the	existing	sprinkler	riser	assembly.

                          The	existing	fire	department	connections	will	be	relocated	due	to	a	conflict	with	the	new	addition.	This	will	
                          be	done	with	a	new	4	outlet	fire	department	connection	(or	a	Storz	connection	if	requested	by	the	City)	
                          for	the	wet	sprinkler	system	to	comply	with	Minnesota	Fire	Code	905.2.1.4	and	a	2	inlet	fire	department	
                          connection	for	the	existing	dry	standpipe	system	serving	the	garage	area.

                          Basic material system components to include

                          Wet	systems:	UL	listed/FM	approved	galvanized	threadable	lightwall	steel	pipe,	ASTM	A135	or	A53	or	UL	
                          listed/FM	approved	black	lightwall	pipe,	ASTM	A795.

                          prinklers	shall	be	quick	response.	Chrome	recessed	pendent	in	finished	areas.	Brass	upright	and	pendent	in	
                          unfinished	areas.

                          All	sprinkler	products	must	be	UL	listed	and/or	FM	approved.

                          All	sprinkler	and	standpipe	systems	shall	be	hydraulically	calculated.

                          Hazard	Classification:
                          Mechanical	rooms,	and	electrical	rooms	shall	be	considered	as	Ordinary	Hazard	Group	1.	
                          Storage	rooms	(except	for	the	chair	storage)	and	exhibition	spaces	shall	be	considered	as	Ordinary	Hazard	
                          Group	2.		

                                                                                                                                           page
Project Update 3/1/2010   St. Cloud Civic Center Expansion                                                   Hagemeister Mack Architects
                                                                                                                                           3.10
             3
                          Remaining	areas	shall	be	considered	as	Light	Hazard	unless	otherwise	noted	or	otherwise	required	by	the	
Project                   authority	having	jurisdiction.
Description
                          The	chair	storage	area	on	the	2nd	floor	north	end	of	the	edition	will	be	designed	for	storage	of	group	A	
                          plastics	stored	at	a	height	between	5	feet	and	8	feet	with	a	design	density	of	at	least	0.4	GPM	/	sq	ft.	Remote	
                          area	will	be	2500	square	feet.	Design	Hose	Stream	will	be	500	GPM.

                          The	sprinkler	and	standpipe	systems	shall	include	all	necessary	zone	valves,	flow	switches,	drains	etc.	for	a	
                          complete	and	operational	system.

                          Due	to	the	hydraulic	requirements	of	the	chair	storage	area	a	fire	pump	will	be	required.		Assume	1250	GPM,	
                          70	PSI	Boost,	75	HP.	

                          Testing

                          Air	handling	units	will	be	verified	for	proper	operation,	supply	&	return	airflows,	outside	airflow,	heating	and	
                          cooling	discharge	temperatures,	plenum	&	building	static	pressure	control.

                          HVAC	reheat	boxes	shall	be	verified	for	proper	airflow	(minimum	and	maximum),	heating	water	flow,	heating	
                          and	cooling	operation.

                          Ductwork	shall	be	tested	for	leakage	and	sound	power	as	requested	by	the	Engineer.

                          All	piping	shall	be	pressure	tested	prior	to	placing	into	service.

                          Electrical Systems

                          Electrical Design Scope

                          The	electrical	building	systems	described	in	this	document	are	new	or	modifications	to	existing	Power	
                          Distribution	Systems,	Lighting	Systems,	and	Fire	Alarm	System.	

                          Code Compliance

                          The	design	of	this	facility	will	be	compliance	with	the	current	NEC,	IBC,	IFC,	Minnesota	Codes	with	approved	
                          amendments,	and	local	codes.

                          B3 Certification

                          The	facility	is	to	adhere	to	the	State	of	Minnesota	Sustainable	Building	Guidelines.	This	will	require	the	
                          building	energy	consumption	to	be	30%	less	than	the	Minnesota	Energy	Code.	Eliminating	light	trespass	from	
                          the	site	and	reducing	the	contribution	of	site	lighting	to	the	overall	electrical	energy	cost.	Daylight	harvesting	
                          strategies	and	occupancy	sensors	will	be	used	to	reduce	general	lighting	energy	consumption	to	meet	
                          guideline	objectives.	

                          POWER DISTRIBUTION SYSTEMS

                          Electrical Service

                          The	existing	electrical	service	is	not	of	sufficient	capacity	for	the	proposed	addition,	and	the	existing	utility	
                          transformer	location	will	need	to	be	relocated	to	avoid	the	footprint	of	the	proposed	addition.

                          A	new	service	transformer	and	connection	cabinet	will	be	located	outdoor	on	north	side	of	the	building.		This	
                          will	be	a	utility	provided	transformer	with	a	480Y277	volt,	3	phase,	4	wire	secondary.		

                          A	new	main	switchboard	will	be	3000	amps,	480/277	volts,	3	phase	with	full	neutral	and	copper	bussing.		
                          This	switchboard	will	contain	multiple	sections	for	expandability.		Sections	shall	include	a	2500	amp	bolted	
                          pressure	main	switch,	a	transient	voltage	surge	suppressor	(TVSS),	customer	power	monitoring/metering,	and	
                          fused	distribution	switches.		
                                                                                                                                           page
Project Update 3/1/2010   St. Cloud Civic Center Expansion                                                  Hagemeister Mack Architects
                                                                                                                                           3.11
             3
Project                   Grounding	electrode	conductor	will	be	connected	to	building	water	service,	steel	rebar	encased	in	concrete	
Description               footings,	structural	steel	if	available,	and	auxiliary	ground	rods.

                          Normal Power Distribution

                          The	power	distribution	system	will	consist	of	a	main	service	electrical	room	located	in	the	second	level	of	
                          the	addition,	corridor	surface	mount	panelboards,	a	first	floor	electrical/communications	closet,	and	a	second	
                          floor	electrical/communications	closet.

                          A	480/277	volt,	3	phase,	4	wire	lighting	branch	circuit	panelboard	will	be	in	the	main	electrical	room	and	will	
                          serve	the	lighting	loads.		A	relay	control	panel	will	be	located	adjacent	to	the	lighting	panel	to	provide	control	
                          as	described	elsewhere	in	this	document.		Outdoor	lighting	will	be	served	from	this	panelboard.

                          A	480/277	volt,	3	phase,	3	wire	mechanical	power	panel	will	be	provided	in	the	main	electrical	room,	and	shall	
                          serve	all	mechanical	loads.

                          Each	floor	shall	have	a	480-208/120	volt,	3	phase	step	down	transformers	to	serve	receptacle/miscellaneous	
                          loads.		Each	transformer	will	feed	a	panelboard	that	feeds	local	loads.

                          Circuit-breaker	type	branch	circuit	panelboards	with	copper	bus	and	25%	spare	spaces.		The	panelboards	will	
                          be	dead	front	construction	with	a	hinged	door	and	a	hinged	cover.		Circuit	breakers	will	be	bolt	on	type.


                          Branch Circuitry

                          Branch	circuits	will	be	copper	conductors	installed	in	steel	conduit.

                          All	light	switches	and	duplex	receptacles	will	be	provided	with	stainless	steel	plates.

                          LIGHTING

                          Design Criterion

                          Design	light	levels	will	be	based	on	the	9th	Edition	of	the	Illuminating	Engineering	Society	of	North	America	
                          (IESNA)	Handbook.		The	lighting	power	density	will	exceed	1989	ASHRAE	90.1	by	30%	to	comply	with	
                          Minnesota	B3	requirements,	in	addition	power	density	will	target	a	value	that	exceeds	2004	ASHRAE	90.1	by	
                          30%.		The	light	levels	and	power	density	will	be	as	follows:




                          	         	         	
                          Light	levels	indicated	in	the	above	table	are	a	minimum	level	and	higher	levels	will	be	achieved	as	limited	by	
                          the	allowable	power	density

                                                                                                                                         page
Project Update 3/1/2010   St. Cloud Civic Center Expansion                                                 Hagemeister Mack Architects
                                                                                                                                         3.12
             3
                          Exterior Lighting
Project
Description               Exterior	uncovered	entries	will	be	illuminated	with	building-mounted	High	Pressure	Sodium	(HPS)	lighting.		
                          Light	fixtures	will	be	full	cutoff	type	of	luminaires.

                          Exterior	covered	entry	lighting	will	be	illuminated	from	the	bottom	of	the	canopy	with	metal	halide	lights.

                          All	outdoor	lighting	will	be	controlled	by	an	automation	lighting	control	system	utilizing	a	combination	of	
                          photo	sensor	and	astronomical	time	clock	control.

                          Interior Lighting

                          Interior	lighting	will	utilize	T5	fluorescent	lamps,	T8	fluorescent	lamps	or	compact	fluorescent	lamps	in	single	
                          story	spaces	and	T5HO	fluorescent	lamps	in	the	exhibit	hall.		
                          	
                          The	exhibit	hall	will	utilize	2x4	high	bay	fluorescent	light	fixtures.

                          The	loading	dock	area	will	utilize	wet	location	fluorescent	light	fixtures.

                          Lighting	in	circulation	spaces	will	utilize	high	efficiency	linear	fluorescent	fixtures.

                          Lighting	in	storage	and	utility	spaces	will	be	surface	or	suspended	4	foot	industrial	fluorescent	strips	with	T-8	
                          lamps	and	electronic	ballasts.

                          Emergency	egress	lighting	will	consist	of	battery	pack	light	fixtures.			

                          Exit	lights	will	be	LED	type	with	red	face	and	UL	listed	6B83.

                          Lighting Control

                          Lighting	control	will	be	accomplished	with	multiple	control	strategies	and	combinations	of	strategies	as	
                          follows:




                          	         	        	        	         	
                          A	lighting	control	system	will	be	provided	to	perform	time	schedule	control.		This	control	system	will	be	
                          fully	addressable	and	will	have	the	flexibility	of	grouping	lighting	into	control	groups	to	provide	flexible	and	
                          adjustable	spaces.		This	control	system	will	be	provided	with	communications	to	the	civic	center	building	
                          automation	system	to	allow	time	schedule	on/off	set	points	to	be	entered.

                          Daylight	control	will	be	provided	by	photo	sensors	located	in	the	space	controlled.		Both	dimming	and	
                          stepped	switching	daylight	strategies	will	be	considered	in	conjunction	with	the	Xcel	Energy	Design	Assistance	
                          Program.

                                                                                                                                            page
Project Update 3/1/2010   St. Cloud Civic Center Expansion                                                    Hagemeister Mack Architects
                                                                                                                                            3.13
             3
                          Scene	control	will	provide	three	zones	of	lighting	control	and	a	minimum	of	four	preset	scenes.
Project
Description               Dual	technology	occupancy	sensor	controls	will	be	utilized	where	occupancy	control	is	utilized.		Sensors	shall	
                          be	off	only	control	where	manual	switches	are	present.

                          SYSTEMS

                          Fire Alarm

                          A	fire	alarm	system	will	be	provided	for	the	civic	center	expansion.		The	fire	alarm	control	panel	will	provided	
                          under	part	C	of	this	narrative.		Main	fire	alarm	control	panel	will	be	located	in	the	electrical	room.

                          A	remote	fire	alarm	annunciator	panel	will	be	located	in	the	main	entry	where	readily	accessible	to	local	Fire	
                          Department	personnel.

                          Alarm	and	trouble	contacts	will	be	interconnected	to	campus	building	automation	system	for	monitoring	
                          purposes.

                          Duct	smoke	detectors	will	be	provided	for	all	AHU’s	and	fire/smoke	damper	operations.

                          Audio/Visual	signal	alarm	indicating	appliances	will	be	provided	throughout	the	building.	

                          All	wiring	will	be	installed	in	conduit.

                          Voice and Data

                          This	building	will	be	equipped	with	a	structure	data	cabling	system	including	shared	electrical/data	closets	on	
                          each	floor.		Electrical/data	closets	will	be	stacked	vertically.		

                          Voice	and	data	outlets	will	be	provided	in	all	offices	and	where	necessary	to	meet	space	program	
                          requirements.	Cable	and	termination	devices	will	be	provided	by	the	owner.		1	¼”	Conduit	stub	ups	shall	be	
                          provided	by	the	contractor	and	will	run	from	outlets	to	accessible	ceiling	space.

                          Security

                          Security	systems	will	be	provided	by	the	owner.		Raceway	will	be	provided	by	the	electrical	contractor.		
                          Location	and	quantity	of	access	control	devices	will	be	determined	by	the	owner’s	security	personnel.

                          Video camera system

                          Video	cameras	will	be	provided	by	the	owner.		Raceway	will	be	provided	by	the	electrical	contractor.		
                          Location	and	quantity	of	cameras	will	be	determined	by	the	owner’s	security	personnel.

                          Intercom system

                          No	intercom	systems	will	be	provided	at	the	loading	dock.

                          PARKING RAMP

                          POWER DISTRIBUTION:

                          Electrical Service

                                                                                                                                           	
                          The	new	electrical	service	for	the	parking	ramp	will	come	from	a	utility	transformer	vault	in	the	adjacent	alley.	
                          CT	metering	will	be	provided	within	the	ramp.	

                          A	new	service	entrance	rated	600	amp,	480/277	volts,	3	phase	panel	will	be	provide	on	the	first	level	of	the	
                          parking	ramp.	

                          Grounding	electrode	conductor	will	be	connected	to	building	water	service,	steel	rebar	encased	in	concrete	
                                                                                                                                        page
Project Update 3/1/2010   St. Cloud Civic Center Expansion                                                Hagemeister Mack Architects
                                                                                                                                        3.14
             3
                          footings,	structural	steel	if	available,	and	auxiliary	ground	rods.
Project
Description               Normal Power Distribution

                          The	power	distribution	system	will	consist	of	a	main	service	electrical	room	located	on	the	first	level	of	the	
                          parking	ramp.

                          The	service	480/277	volt	panel	will	feed	all	480	and	277	volt	loads	as	well	as	a	480-208/120	volt	step	down	
                          transformer.

                          A	100	amp,	208/120	volt,	3	phase	panelboard	on	the	secondary	side	of	the	stepdown	transformer	will	feed	all	
                          208	and	120	volt	loads	within	the	parking	ramp.

                          Circuit-breaker	type	branch	circuit	panelboards	with	copper	bus	and	25%	spare	spaces.		The	panelboards	will	
                          be	dead	front	construction	with	a	hinged	door	and	a	hinged	cover.		Circuit	breakers	will	be	bolt	on	type.

                          Branch Circuitry

                          Branch	circuits	will	be	copper	conductors	installed	in	steel	conduit.

                          All	light	switches	and	duplex	receptacles	will	be	provided	with	stainless	steel	plates.

                          LIGHTING:

                          Design Criterion

                          Design	light	levels	will	be	based	on	the	9th	Edition	of	the	Illuminating	Engineering	Society	of	North	America	
                          (IESNA)	Handbook.		The	lighting	power	density	will	exceed	1989	ASHRAE	90.1	by	30%	to	comply	with	
                          Minnesota	B3	requirements,	in	addition	power	density	will	target	a	value	that	exceeds	2004	ASHRAE	90.1	by	
                          30%.		The	light	levels	and	power	density	will	be	as	follows:




                          	         	         	
                          Light	levels	indicated	in	the	above	table	are	a	minimum	level	and	higher	levels	will	be	achieved	as	limited	by	
                          the	allowable	power	density

                          Exterior Lighting

                          Exterior	uncovered	entries	will	be	illuminated	with	building-mounted	High	Pressure	Sodium	(HPS)	lighting.		
                          Light	fixtures	will	be	full	cutoff	type	of	luminaires.

                          All	outdoor	lighting	will	be	controlled	by	an	automation	lighting	control	system	utilizing	a	combination	of	
                          photo	sensor	and	astronomical	time	clock	control.

                          Interior Lighting

                          Interior	lighting	will	utilize	T5	fluorescent	lamps,	T8	fluorescent	lamps	or	compact	fluorescent	lamps.		
                          	
                          The	parking	garage	will	utilize	4’	linear	fluorescent	lamps	rated	for	cold	weather	applications.


                                                                                                                                         page
Project Update 3/1/2010   St. Cloud Civic Center Expansion                                                 Hagemeister Mack Architects
                                                                                                                                         3.15
             3
                          Emergency	egress	lighting	will	consist	of	battery	pack	light	fixtures.			
Project
Description               Exit	lights	will	be	LED	type	with	red	face	and	UL	listed	6B83.

                          Lighting Control

                          Lighting	control	will	be	accomplished	with	multiple	control	strategies	and	combinations	of	strategies	as	
                          follows:




                          Daylight	control	will	be	provided	by	photo	sensors	located	in	the	space	controlled.		Both	dimming	and	
                          stepped	switching	daylight	strategies	will	be	considered	in	conjunction	with	the	Xcel	Energy	Design	Assistance	
                          Program.

                          Dual	technology	occupancy	sensor	controls	will	be	utilized	where	occupancy	control	is	utilized.		Sensors	shall	
                          be	off	only	control	where	manual	switches	are	present.

                          SYSTEMS

                          Fire Alarm:

                          No	fire	alarm	system	with	the	parking	ramp.

                          Voice and Data:

                          This	building	will	be	equipped	with	a	structure	data	cabling	system	for	the	office	space.		Data	and	telephone	
                          equipment	will	occupy	space	in	the	first	level	electrical	room.		

                          Voice	and	data	outlets	will	be	provided	in	all	offices	and	where	necessary	to	meet	space	program	
                          requirements.	Cable	and	termination	devices	will	be	provided	by	the	owner.		1”	Conduit	stub	ups	shall	be	
                          provided	by	the	contractor	and	will	run	from	outlets	to	accessible	ceiling	space.

                          Security/Parking Control:

                          Security	systems	will	be	provided	by	the	owner.		Raceway	will	be	provided	by	the	electrical	contractor.		
                          Location	and	quantity	of	access	control	devices	will	be	determined	by	the	owner’s	security	personnel.

                          Parking	control	system	will	be	provided	by	the	owner.		Raceway	will	be	provided	by	the	electrical	contractor.

                          Video camera system:

                          Video	cameras	will	be	provided	by	the	owner.		Raceway	will	be	provided	by	the	electrical	contractor.		
                          Location	and	quantity	of	cameras	will	be	determined	by	the	owner’s	security	personnel.

                          Intercom system:

                          No	intercom	systems	will	be	provided.


                                                                                                                                       page
Project Update 3/1/2010   St. Cloud Civic Center Expansion                                               Hagemeister Mack Architects
                                                                                                                                       3.16
             3
                          CIVIC CENTER EXPANSION
Project
Description               POWER DISTRIBUTION:

                          Electrical Service

                          No	associated	work	with	this	phase.

                          Normal Power Distribution

                          No	associated	work	with	this	phase.

                          Branch Circuitry

                          Branch	circuits	will	be	provided	as	required	for	all	mechanical	upgrades,	lighting,	and	fire	alarm	systems.

                          Branch	circuits	will	be	copper	conductors	installed	in	steel	conduit.

                          LIGHTING

                          Design Criterion
                          Design	light	levels	will	be	based	on	the	9th	Edition	of	the	Illuminating	Engineering	Society	of	North	America	
                          (IESNA)	Handbook.		The	lighting	power	density	will	exceed	1989	ASHRAE	90.1	by	30%	to	comply	with	
                          Minnesota	B3	requirements,	in	addition	power	density	will	target	a	value	that	exceeds	2004	ASHRAE	90.1	by	
                          30%.		The	light	levels	and	power	density	will	be	as	follows:




                          	         	         	
                          Light	levels	indicated	in	the	above	table	are	a	minimum	level	and	higher	levels	will	be	achieved	as	limited	by	
                          the	allowable	power	density

                          Interior Lighting

                          Interior	lighting	will	utilize	T5	fluorescent	lamps,	T8	fluorescent	lamps	or	compact	fluorescent	lamps	in	single	
                          story	spaces	and	T5HO	fluorescent	lamps	in	the	exhibit	hall.		

                          New	emergency	egress	lighting	will	consist	of	battery	pack	light	fixtures.			

                          New	exit	lights	will	be	LED	type	with	red	face	and	UL	listed	6B83.




                                                                                                                                        page
Project Update 3/1/2010   St. Cloud Civic Center Expansion                                                Hagemeister Mack Architects
                                                                                                                                        3.17
             3
                          Lighting Control
Project
Description               Lighting	control	will	be	accomplished	with	multiple	control	strategies	and	combinations	of	strategies	as	
                          follows:




                          A	lighting	control	system	will	be	provided	to	perform	time	schedule	control.		This	control	system	will	be	
                          fully	addressable	and	will	have	the	flexibility	of	grouping	lighting	into	control	groups	to	provide	flexible	and	
                          adjustable	spaces.		This	control	system	will	be	provided	with	communications	to	the	civic	center	building	
                          automation	system	to	allow	time	schedule	on/off	set	points	to	be	entered.

                          Daylight	control	will	be	provided	by	photo	sensors	located	in	the	space	controlled.		Both	dimming	and	
                          stepped	switching	daylight	strategies	will	be	considered	in	conjunction	with	the	Xcel	Energy	Design	Assistance	
                          Program.

                          Scene	control	will	provide	three	zones	of	lighting	control	and	a	minimum	of	four	preset	scenes.

                          SYSTEMS

                          Fire Alarm:

                          A	new	multiplexed,	fire	alarm	system	will	be	provided	for	the	civic	center	addition	and	the	existing	civic	
                          center.		The	fire	alarm	control	panel	will	be	an	addressable	system	with	voice	capability,	with	all	peripherals	to	
                          provide	a	completely	functional	system.		Main	fire	alarm	control	panel	will	be	located	in	the	electrical	room.

                          A	remote	fire	alarm	annunciator	panel	will	be	located	in	the	main	entry	where	readily	accessible	to	local	Fire	
                          Department	personnel.

                          Alarm	and	trouble	contacts	will	be	interconnected	to	campus	building	automation	system	for	monitoring	
                          purposes.

                          Duct	smoke	detectors	will	be	provided	for	all	AHU’s	and	fire/smoke	damper	operations.

                          Audio/Visual	signal	alarm	indicating	appliances	will	be	provided	throughout	the	building.	

                          All	wiring	will	be	installed	in	conduit.

                          Voice and Data:

                          No	work	with	this	phase.

                          Security:

                          No	work	with	this	phase.

                          Video camera system:

                          No	work	with	this	phase.

                          Intercom system:

                          No	intercom	systems	will	be	provide.

                                                                                                                                          page
Project Update 3/1/2010   St. Cloud Civic Center Expansion                                                  Hagemeister Mack Architects
                                                                                                                                          3.18
             4
Budget /                  Project Budget / Estimates / Alternates
Estimates                                     ST. CLOUD CIVIC CENTER EXPANSION PROJECT
                                                 MASTER BUDGET SUMMARY AS of 2-22-10

                                                                                               CIVIC            PARKING
                                                                                              CENTER             RAMP             TOTAL
                               01 GENERAL REQUIREMENTS
                                   CONTINGENCY ALLOWANCE                                        $1,700,000          $300,000        $2,000,000
                                   OTHER GENERAL REQUIREMENTS                                     $782,500          $299,922        $1,082,422
                               02 EXISTING CONDITIONS                                             $212,084           $20,000          $232,084
                          022400 ENVIRONMENTAL ASSESSMENT/REMEDIATION                             $154,126                 $0         $154,126
                                   DEMOLITION - Library & M & H Building                          $389,075                 $0         $389,075
                               03 CONCRETE                                                        $714,102        $2,623,600        $3,337,702
                                   PRECAST CONCRETE                                               $819,006          $707,320        $1,526,326
                               04 MASONRY & STONE                                               $1,647,022          $235,900        $1,882,922
                               05 METALS - Furnish & Install                                    $1,208,500           $67,384        $1,275,884
                               05 MISCELLANEOUS (Materials & Erection)                            $350,725          $249,800          $600,525
                               06 WOODS, PLASTICS AND COMPOSITES                                  $197,630           $20,000          $217,630
                              07A THERMAL AND MOISTURE PROTECTION                               $1,585,013          $212,731        $1,797,744
                               08 OPENINGS                                                      $1,346,880          $142,940        $1,489,820
                               09 FINISHES                                                      $1,427,594           $96,000        $1,523,594
                               10 SPECIALTIES                                                     $513,874           $47,500          $561,374
                               11 EQUIPMENT                                                         $20,000         $262,400          $282,400
                               12 FURNISHINGS                                                     $104,095                 $0         $104,095
                               14 CONVEYING EQUIPMENT                                             $334,000          $206,000          $540,000
                               21 FIRE SUPPRESSION                                                $224,108           $21,616          $245,724
                               22 PLUMBING                                                      $1,121,500          $210,000        $1,331,500
                               23 HVAC (HVAC, Piping, Ventilation & Temp. Controls)             $2,422,392           $45,000        $2,467,392
                               26 ELECTRICAL                                                    $1,722,940          $617,120        $2,340,060
                              31A EARTHWORK                                                       $365,000          $503,920          $868,920
                              32A EXTERIOR IMPROVEMENTS                                           $954,040           $44,480          $998,520
                               33 UTILITIES (Sewer, Domestic, Fire and Storm)                     $433,266           $64,500          $497,766
                                   OWNERS F. F. & E.                                            $1,980,000                 $0       $1,980,000

                                   HARD COST GROUP TOTALS                                   $22,729,472 $6,998,133 $29,727,605

                                   SOFT COST GROUP
                                   DESIGN FEES (Architects, Engineers, Consultants)             $1,281,425          $370,825        $1,652,250
                                   CONSTRUCTION MANAGEMENT                                        $369,667          $129,883          $499,550
                                   LAND ACQUISTION COSTS                                        $1,134,010                 $0       $1,134,010
                                   4TH AVENUE REALIGNMENT (PROJECT SHARE)                       $1,000,000                 $0       $1,000,000
                                   INSURANCE, BOND COSTS, OTHER                                     $95,000           $5,000          $100,000

                                   SOFT COST GROUP TOTALS                                     $3,880,102          $505,708       $4,385,810

                                                  COST GROUP TOTALS                         $26,609,574 $7,503,841 $34,113,415
                          It should be noted that the project will consider and carry various additive and/or deductive alternates for
                          the project to respond to actual bid results and allow for priority selection of items at that time. Alternates
                          being considered include: various finish options for: ceilings, floors, walls, and precast panels, canopy options,
                          mechanical and electrical options and owner FFE options. These could total $1M-$2M.
                                                                                                                                            page
Project Update 3/1/2010   St. Cloud Civic Center Expansion                                                    Hagemeister Mack Architects
                                                                                                                                            4.1
             5
Schedule                  Project Schedule
Schedule
                          Project Schedule Overview

                          Civic Center                                                                  Parking Ramp

                          Schematic Design Phase ......................Jan - May 2009 Schematic Design Phase ......................Jan - May 2009

                          Design Development Phase ................ Jun - Sep 2009 Design Development Phase ................ Jun - Sep 2009

                          Construction Doc. Phase ......Sep 2009 - April 2010 Construction Doc. Phase ......Sep 2009 - April 2010

                          Bid Phase ......................................................... May 2010 Bid Phase ......................................................... May 2010

                          Construction Start.............................. June - July 2010 Construction Start.............................. June - July 2010

                          Substantial Completion.................................. Sep 2011 Substantial Completion...................................Jun 2011

                          Commissioning ...............................................Nov 2012 Commissioning ................................................ July 2011

                          Final Completion ............................................. Feb 2012 Final Completion ............................................. July 2011

                          Grand Opening ............................................... Apr 2012 Grand Opening ............................................... Aug 2011

                          The above schedule is contingent upon state funding being allocated during the 2010 session.




                                                                                                                                                                                      page
Project Update 1/3/2010   St. Cloud Civic Center Expansion                                                                                 Hagemeister Mack Architects
                                                                                                                                                                                      5.1
             6
Finance                   Finance Plan
Plan
                          CIVIC CENTER EXPANSION PROJECT
                          PROPOSED PROJECT FINANCE PLAN

                          	          	
                          It	is	the	expectation	of	the	City	to	receive	$15,100,000	in	State	Bonding	money	during	the	2010	legisla-
                          tive	session	to	assist	in	the	St.	Cloud	Civic	Center	Expansion	Project,	estimated	to	be	$34,200,000.		The	
                          2008	State	Bonding	bill	did	include	$2	mil	for	the	project	which	has	been	matched	by	the	City	and	used	for	
                          preliminary	project	expense.		Those	preliminary	costs	include	acquisition	of	the	M	&	H	building,	demolition	of	
                          the	old	library	&	M	&	H	building	and	site	preparation,	including	significant	street	utility	work.		Design	fees	and	
                          consultation	will	use	up	the	balance	of	the	$4	mil.		

                          The	City	is	required	to	match	a	successful	State	Bonding	Grant.		The	City’s	financing	plan	for	said	match	
                          would	be	fundamentally	reliant	on	the	existing	1%	Food	&	Beverage	Tax.	Here	are	some	points	of	interest	
                          regarding	existing	and	proposed	Civic	Center	financial	obligations:

                          •	        The	F	&	B	tax	would	continue	to	make	Paramount	Theater	debt	payments;
                          •	        The	F	&	B	tax	would	make	the	balance	of	the	MAC	debt	service	payments;
                          •	        The	F	&	B	tax	could	provide	$50,000/year	for	Paramount	capital	improvements;
                          •	        The	F	&	B	tax	could	provide	$50,000/year	for	MAC	capital	improvements;	
                          •	        The	F	&	B	tax	could	provide	a	stream	of	debt	service	payments	in	the	amount	of	$1,200,000/year	
                          	         for	Civic	Center	Expansion	beginning	in	2012	(and	an	increasing	amount	once	the	MAC	and	
                          	         Paramount	debt	is	paid	off).

                          It	is	proposed	that	the	City	would	sell	a	bond	redeemable	via	Food	&	Beverage	tax	collections.

                          The	bond	size	could	approach	$19,000,000:		

                          	         -	$2	mil	to	match	the	2008	State	grant;	
                          	         -	$15.1	mil	to	match	the	2010	State	grant;
                          	         -	$2	mil	to	cover	HVAC	and	roof	work	for	the	existing	building.

                          The	bond	would	be	paid	off	over	a	20	to	25	year	term	with	interest	rates	of	3	to	5%,	depending	upon	the	
                          type	of	bond	issued	for	the	project.		The	projected	cash	flow	in	the	food	and	beverage	fund	will	be	sufficient	
                          to	support	the	$19	million	bond.




                                                                                                                                         page
Project Update 3/1/2010   St. Cloud Civic Center Expansion                                                 Hagemeister Mack Architects
                                                                                                                                         6.1
             7
Operating                 Operating Budget Impact
Costs

                          The impact of the Expansion Project has been estimated using the first 20 years of Civic Center history. The
                          increases from 2010 Estimate to Year 1 Post-Expansion are largely due to increased capacity but they also re-
                          flect a temporary down-turn in the market that has affected most hospitality properties and related facilities.


                          OPERATING REVENUE

                                                                       2010              YEAR 1 ESTIMATED
                                                                       ESTIMATES         AFTER EXPANSION

                          Hotel/Motel Tax Collection                   $419,000          $500,000
                          Room Rental Income                           $575,000          $957,000
                          Concessions/Coffee Service                   $170,000          $234,000
                          Commissions: Catering, Decorating, etc.      $184,000          $233,000
                          Event Cost Recapture Costs, etc.             $200,000          $330,000

                          TOTAL OPERATING
                          REVENUE                                      $1,548,000        $2,254,000


                          OPERATING EXPENDITURES

                                                                       2010              YEAR 1 ESTIMATED
                                                                       ESTIMATES         AFTER EXPANSION

                          Full-Time/PT Employee Payroll Expense        $879,200          $1,200,900
                          Supplies: Maintenance & Repair               $155,200          $242,800
                          Utilities                                    $263,600          $340,000
                          Concessions/Coffee Service Supplies          $59,000           $82,000
                          Other Services & Charges                     $62,200           $73,700

                          TOTAL OPERATING
                          EXPENDITURES                                 $1,419,200        $1,939,400


                          EXCESS REVENUES
                          OVER EXPENSES                                $128,800          $314,600




                                                                                                                                       page
Project Update 3/1/2010   St. Cloud Civic Center Expansion                                               Hagemeister Mack Architects
                                                                                                                                       7.1
                          Appendix A


         A




                                                                                           page
Project Update 3/1/2010   St. Cloud Civic Center Expansion   Hagemeister Mack Architects
                                                                                           A.1
                          Appendix A


         A




                                                                                           page
Project Update 3/1/2010   St. Cloud Civic Center Expansion   Hagemeister Mack Architects
                                                                                           A.2
                          Appendix A


         A




                                                                                           page
Project Update 3/1/2010   St. Cloud Civic Center Expansion   Hagemeister Mack Architects
                                                                                           A.3
                          Appendix A


         A




                                                                                           page
Project Update 3/1/2010   St. Cloud Civic Center Expansion   Hagemeister Mack Architects
                                                                                           A.4
                          Appendix A


         A




                                                                                           page
Project Update 3/1/2010   St. Cloud Civic Center Expansion   Hagemeister Mack Architects
                                                                                           A.5
                          Appendix A


         A




                                                                                           page
Project Update 3/1/2010   St. Cloud Civic Center Expansion   Hagemeister Mack Architects
                                                                                           A.6
                          Appendix A


         A




                                                                                           page
Project Update 3/1/2010   St. Cloud Civic Center Expansion   Hagemeister Mack Architects
                                                                                           A.7
                          Appendix A


         A




                                                                                           page
Project Update 3/1/2010   St. Cloud Civic Center Expansion   Hagemeister Mack Architects
                                                                                           A.8
                          Appendix A


         A




                                                                                           page
Project Update 3/1/2010   St. Cloud Civic Center Expansion   Hagemeister Mack Architects
                                                                                           A.9
                          Appendix A


         A




                                                                                           page
Project Update 3/1/2010   St. Cloud Civic Center Expansion   Hagemeister Mack Architects
                                                                                           A.10
                          Appendix A


         A




                                                                                           page
Project Update 3/1/2010   St. Cloud Civic Center Expansion   Hagemeister Mack Architects
                                                                                           A.11
                          Appendix A


         A




                                                                                           page
Project Update 3/1/2010   St. Cloud Civic Center Expansion   Hagemeister Mack Architects
                                                                                           A.12

						
Related docs
Other docs by stcloudtimes
St. Cloud area community priorities
Views: 253  |  Downloads: 4
Jett contract
Views: 114  |  Downloads: 1
Drug diversion coalition report
Views: 870  |  Downloads: 10
Central Minnesota Health Survey
Views: 12  |  Downloads: 0
Controlled substance diversion roadmap
Views: 885  |  Downloads: 13
Minnesota Dept. of Health Diversion Report
Views: 2752  |  Downloads: 55
Read the court documents
Views: 323  |  Downloads: 2
Saffari lawsuit
Views: 1063  |  Downloads: 25
Read the complaint
Views: 594  |  Downloads: 1
FTC report
Views: 217  |  Downloads: 4