St. Cloud Civic Center expansion plan
Description
St. Cloud Civic Center expansion plans
Document Sample


March 1, 2010
Mr. Lyle Mathiasen
Civic Facilities Director
St. Cloud Civic Center
10 Fourth Avenue South
St. Cloud, MN 56301
Re: Project Data Summary for the St. Cloud Civic Center Expansion Project
St. Cloud City Council Planning Session Presentation and Update 3/1/2010
Dear Mr. Mathiasen;
Hagemeister Mack Architects is pleased to present the following project update submittal for the St. Cloud Civic Cen-
ter Expansion and Parking Ramp. This report has been prepared based upon the current status of the project which is
now in the middle stages of the Construction Documents Phase. Some data changes will be inevitable as we focus on
the details of the design in preparation for bidding the project this spring.
The project consists of an approximate 85,000 SF addition to the existing Civic Center building, as well as an approxi-
mate 300 stall parking ramp on adjacent property owned by the City of St. Cloud. The total project cost is estimated
to be approximately $34 million. $2 million in state bonding money was allocated for the project in 2008. The City is
seeking an additional $15.1 million in state bonding money to be matched by the City of St. Cloud Food & Beverage
Revenue Tax. We are hopeful the project will be funded this year and that construction can begin in June or July of 2010.
It is anticipated the City will begin utility and street location work this fall in preparation for the Civic Center Expansion
Project.
Thank you for your confidence in retaining Hagemeister and Mack Architects for architectural services related to this
project. The project has been a long time in the making, and we are excited to see it reach this stage. We look forward
to serving you throughout the remainder of the project. If you have any further questions or concerns, please feel free
to contact me at your convenience.
Sincerely,
Hagemeister Mack Architects
Murray A. Mack, AIA, LEED AP
Table of Contents
1. Introduction
Cover Letter ...........................................................................................................................................................1.1
Index .........................................................................................................................................................................1.2
Building Project Data Sheet.................................................................................................................................1.3
Project Team ...........................................................................................................................................................1.4
2. Project Background Narrative
Statutory Requirements .......................................................................................................................................2.1
Planning Process Summary ...........................................................................................................................2.2-2.3
Operational and Strategic Program ............................................................................................................2.3-2.4
Project History................................................................................................................................................2.4-2.5
3. Project Description
Expansion Project Program Summary ..............................................................................................................3.1
Codes .......................................................................................................................................................................3.2
Architectural Systems ....................................................................................................................................3.2-3.4
Mechanical Systems ..................................................................................................................................... 3.4-3.11
Electrical Systems ...................................................................................................................................... 3.11-3.18
Fire Systems ......................................................................................................................................................... 3.18
4. Financial Information (Budget / Estimate / Alternates)
Master Budget Summary ......................................................................................................................................4.1
5. Project Schedule
Project Schedule Overview .................................................................................................................................5.1
6. Financial Information (Project Finance)
Revenue Plan for Financing the Project ............................................................................................................6.1
7. Financial Information (Operational Budget Impact)
Operating Revenue and Expenditures ..............................................................................................................7.1
Appendix A
Current floor plans, site plans, renderings .............................................................................................A.1-A12
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
1.2
Building Project Data Sheet
Name of Project St. Cloud Civic Center Expansion and Parking Ramp
Owner City of St. Cloud
Project Location Fourth Avenue North and St. Germain Street W.
St. Cloud, MN
Building Occupancy Type A-3 and S-2
Primary Space Types Exhibit Hall and Parking
Type of Construction I-B and II-B
Building Size
Number of Stories Existing Building ................................................................................................................... 4
New Addition ....................................................................................................................... 2
Square Feet per Floor Lower parking existing (175 stalls) ................................................................. 74,500 S.F.
Upper parking existing (175 stalls) ................................................................. 74,500 S.F.
1st existing ........................................................................................................... 74,500 S.F.
2nd existing .......................................................................................................... 35,000 S.F.
Total Existing ...................................................................................................... 109,500 S.F.
1st New ................................................................................................................ 61,500 S.F.
2nd New ............................................................................................................... 23,000 S.F.
Total New ............................................................................................................. 84,500 S.F.
Grand Total (NIC Parking Areas) ................................................................. 194,000 S.F.
New Site Size .............................................................................................................................. 110,000 S.F.
Parking
Area of Parking Surface (all new; existing will be removed) ................................................... 32,000 S.F.
New Ramp (per tier) ......................................................................................... 22,000 S.F.
Number of Stalls Surface (approximate) ................................................................................................... 100
New Ramp (approximate) ............................................................................................ 300
Existing Parking Levels (combined total) ................................................................... 350
Total Parking Stalls ............................................................................................................................................ 750
Roofing Type Ballasted or adhered membrane
Exterior Wall Type Insulation architectural precast walls, glass curtain wall, composite metal panels
Interior Wall Type Masonry, metal stud with gypsum board
Structural System Type Steel frame, precast concrete, steel bar joists
Mechanical System Type Roof top units
Fire Protection System Full automatic sprinkler system
Electrical System 2,000 amps, 277/408 volt, three phase
Technology System Energy management, fire alarm, multi media access, wired and wireless telecom-
munications, video security system
Costs
See detailed cost breakdown in Section 4
State funding amount
Received ......................................................................................................................... $2,000,000.00
Requesting ....................................................................................................................... $15,100,000.00
Currently in Bonding Bill ....................................................................................................................... $15,000,000.00
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
1.3
Project Team
City of St. Cloud
Dave Kleis Mayor
Mike Williams City Administrator
Lyle Mathiasen Community Services and Facilities Director
Bill Dunsmoor Civic Center Manager
Steve Gaetz Public Services Director
Matt Glaesman Community Development Director
Steve Foss City Engineer
Hagemeister Mack Architects
Murray Mack Project Architect, Designer
Mike Juhl Project Architect, Manager
Tim Gillet Architectural Design/Technician
Dan Schaff Architectural Design/Technician
Strack Companies
Bob Strack President, Strack Companies
Mike Smith Cost Estimating, Construction Management
Dan Osterman Cost Estimating, Project Management
JLG Architects
Dan Miller Associate Architect
Bonestroo
Tom Herkenhoff Civil Engineering
Larson Engineering
Kesh Ramdular Structural Engineering
LKPB Engineering
Victor Powell Mechanical Engineering
Randy Jacobs Electrical Engineering
Matt Palodichuk Commissioning Agent
Vedi Associates
Puneet Vedi Parking Ramp Consultant
PS Vedi Parking Ramp Consultant
The Weidt Group
Paul Henderson Sustainability Consultant
Damon Farber Landscape Architecture
Tom Whitlock Landscape Architect
Orfield Laboratories, Inc.
Steve Orfield Acoustical Project Manager
David Berg Technical
Michael Role Technical
Dennis Hahn & Associates Food Service Consulting
Dennis Hahn Food Service Consultant
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
1.4
2
Background Project Background Narrative
Narrative
Statutory Requirements
The Minnesota Statutes affecting predesign requirements apply to this project as described in the following:
16A.695 - Property purchased with State Bond Proceeds: This statute did not appear to contain any
requirements that would affect the project planning or design.
16B.241 - Coordinated Facility Planning: Not applicable.
16B.32 - Alternative Energy Sources: Alternative energy sources must be used in project. Feasibility of
providing 2% of building’s power from on-site renewable wind and sun sources must be evaluated during
the design process.
16B.325 - Energy Conservation Goals & Sustainable Building Guidelines: Compliance with B3 Guidelines
required for this project.
16B.326 - Geothermal & Solar Heating-Cooling Systems: Feasibility of using geothermal and solar heating
and cooling systems have be evaluated during the design process.
16B.33 - Designer Selection Board Requirement: Not applicable to projects for local government units.
16B.335 - Predesign Requirement & Review of Plans and Projects, and Consideration of MINNCOR
Industry products:
• Predesign has been completed for this project.
• The project specifications are required to allow for MINNCOR-produced products to be bid. It is
anticipated that there would be a very limited scope of such products.
• Technology plans are not required for local government unit projects.
Planning Process Summary
The St. Cloud Civic Center is located in
downtown St. Cloud at the east end of his-
toric St. Germain Street and located directly
on the west bank of the Mississippi River.The
facility was originally completed in 1988 as a
combination community center and conven-
tion center. The community center functions
were basically located in the Terry Haws
Center and included a number of multi-
purpose wood floor courts, a suspended running track and adjacent support spaces such as locker rooms,
restrooms, and storage. The balance of the facility including the Glenn Carlson space was used for conventions,
meetings and trade shows. The project was funded by the implementation of a 1 % Food and Beverage sales
tax on items sold within the City of St. Cloud. In 1995 The Civic Center expanded its space by renovating the
existing Terry Haws room into trade show / convention space along with a renovation of locker rooms into
other support space for the Civic Center. In 2006, the St. Cloud Civic Center completed a $1.5M interior
renovation of the facility that included mostly finish upgrades and a general face lift. In 2005, the city completed
is financial obligation for the original project bond and began accumulating funds for the expansion project.
Since the completion of the major renovation in 1995, the Civic Center has been considering a number of
expansion options. Hagemeister and Mack Architects was retained at that time to assist the City in the
planning process. All of the options considered expansions to the west and/or south based on the loca-
tion of the facility along the banks of the Mississippi River. A significant factor in the facility expansion op-
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
2.1
2
tions included the need for relocating the existing public library located directly west of the Civic Center
Background across 4th Avenue. Consideration was also given to use of the existing library, or even the inclusion of that
Narrative function within the Civic Center facility. That issue was a significant barrier to serious progression of the
project. The Civic Center project simply couldn’t move ahead until the library found a new home. The
plan options changed a number of times as the years passed and the political and budget climate changed.
In 2003 the City passed a referendum authorizing a ½ % General Sales tax that would fund a new library
project. With that in place, planning for the Civic Center became more focused and the City moved for-
ward with negotiations to secure the balance of the site from the owners of M&H Appliance. In 2008, the
library opened the doors to a new facility located approximately 8 blocks to the west on St. Germain Street.
Although a number of expansion options have been studied over the past 12 years, the final design focused
on what has been termed the preferred “west option”. This option has been reviewed by a number of gov-
ernment bodies, including the St. Cloud City Council, who formally approved the “west option” as the one
to be pursued further in design and for consideration for state funding. With this government approval, the
above property issues resolved, and $2M in state bonding money previously appropriated for design and
acquisition of the needed property, the site area for the expansion is available and ready for development.
rth
No
et
re
t St
1s
4t Kelly Inn
hA
ve
Grand Central
Parking Ramp
(349 stalls)
Radisson Hotel
t 5t
e hA
re ve
St
ain
m
er
.G
St
Aerial photograph of Civic Center and surrounding area, showing location of proposed project.
The existing Civic Center is approximately 110,000 sf in size and includes two large trade show/ conven-
tion spaces along with support spaces such as prefunction/lobby areas, break-out rooms, catering kitchens,
storage, and other support spaces. The facility also includes two levels of parking directly below the facil-
ity at 74,500 sf for each level or approximately 350 total stalls. The existing facility is host to a number of
conventions and trade shows. Its central location in the state makes it the perfect location for a variety
of functions, shows and meetings. Some of the larger tradeshow functions include: The Sportsman’s Show,
The Home Show, The Quilters’ Convention and the Farm Show. Many of these events are growing to the
point of not having enough space for their functions. At least two major events previously held at the Civic
Center have moved to another venue due to space limitations. The basis for the expansion has been well
documented in a detailed study completed by Convention, Sports and Leisure (CSL) in 2002 and updated in
2004. The report included interviews of many of the facility users along with an analysis of the market and
what an expanded Civic Center could support in terms of additional space. Portions of that document are
included in this predesign. The full report is available upon request. Design planning has also been inclusive
of the Civic Center facility operators, facility users, City Council and ad hoc groups with various community
concerns. Input from all of these sources has been incorporation into the progression of the design process.
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
2.2
2
Background
Narrative
Site Plan of proposed expansion project.
Operational and Strategic Program
The proposed expansion will consist of a major trade/convention show expansion to the existing Terry Haws
Center located on the north end of the existing facility. Approximately 32,000 sf of large clear span space will be
added to the Terry Haws center, providing over 58,000 sf of contiguous trade show space in that room. The new
addition will also include the ability to subdivide the space into 2 bays, and will include movable walls between
Terry Haws and the new addition. This flexibility will provide for the ability to host 3 separate functions concur-
rently, or 4 if including the Glenn Carlson space on the south side of the facility. In addition to the main trade show
space, there will be a major prefunction / lobby space added directly to the south of the new trade show space
that will serve the new space, as well as facilitate the connection to the existing building and prefunction / lobby
areas. A service area to the north will include space for storage, catering kitchen, load in, refuse and other service/
support needs. The north end of the site will allow for a significant staging and marshalling area, which has been
a major detriment to the current facility operations. The total new area of the expansion will be approximately
84,500 sf, bringing the total area of the facility, not including the two exist-
ing parking levels or the new parking ramp, to approximately 194,000 sf.
The project will also include the construction of a new parking ramp that
will be located directly west of the new addition across 5th Avenue. The
ramp will be located on an existing public surface lot and will include
approximately 300 stalls initially. The ramp will be designed to expand
to approximately 600 stalls total. The ramp will serve the Civic Center
for major events, but will also be available full time for general down-
town parking, as well as for permit patrons who work in the downtown
area. The use of the ramp for various functions and needs should make
it a well-used public parking facility. A skyway is being master planned
into the project to accommodate a connection from the ramp to the
Civic Center. The project will also include a significant public plaza on
the south side of the facility, responding to the new south entrance and
reconfiguration of 4th Avenue. The plaza will provide for a covered drop-
off area, and landscaping that will respond to the downtown character Beaver Island Trail
and existing streetscape elements established throughout the downtown
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
2.3
2
area. A new “Mississippi River Access” point will also be developed at the north end of the existing facility to
Background accommodate access to the existing Beaver Island Trail that runs directly adjacent to the Civic Center and
Narrative Mississippi River. The Beaver Island Trail extends from the Civic Center through St. Cloud State University
and south to 33rd Avenue South. The trail will be extended north of the Civic Center to the St. Cloud Hos-
pital, creating a 5 mile trail that runs adjacent to the Mississippi River and connected key areas of the City.
The Civic Center is being master planned to accommodate a subsequent future addition of approximately
37,000 sf, that will allow for a “third” trade show bay matching the size of the two completed in this proj-
ect. Along with the trade show expansion will be an expansion of the prefunction / lobby and services areas
to the north and south of the main space. A surface parking lot in that area in the meanwhile will allow
for that future expansion. As noted above, the new parking ramp will be designed for future expansions,
and will be expanded as needed when the Civic Center completes the anticipated “third bay” expansion.
Project History
December 1986
OLD CITY HALL/POST OFFICE IS DEMOLISHED TO MAKE ROOM FOR ST. CLOUD CIVIC CENTER. Built
in 1902, it originally held the St. Cloud Post Office and the United States Land Office. In 1937 it was moved
four blocks east to become the City Hall offices. City Hall opened its doors in 1938 in this building.
June 1986
TWO OPTIONS FOR THE COMBINED FIELD HOUSE/CIVIC CENTER ARE PRESENTED TO THE
ST. CLOUD CITY COUNCIL. Option A includes using the old city hall building and Option B removes the
old city hall building.
February 1987
ST. CLOUD CITY COUNCIL APPROVES SITE PLANS AND A $9.4M BUDGET FOR THE CIVIC CENTER.
Budget changes several times over the months following.
May 6, 1987
POLICE DEPARTMENT IS RAISED TO MAKE ROOM FOR THE ST. CLOUD CIVIC CENTER. Completed in
1918, this building held city offices from 1918 to 1937.
1988
THE NEW FACILITY IS COMPLETED AS A COMBINATION COMMUNITY CENTER AND CONVENTION
CENTER WITH NO STATE CONTRIBUTIONS.
Project funded by a 1% local Food and Beverage sales tax.
January 13, 1989
ST. CLOUD CIVIC CENTER OPENS ITS DOORS TO THE PUBLIC DURING A DEDICATION CEREMONY.
January 15, 1989
ST. CLOUD CIVIC CENTER HOLDS ITS FIRST EVENT, A BRIDAL SHOW.
1992
THE ST. CLOUD CIVIC CENTER HAS OPERATIONS IN THE BLACK. Facility operation costs, maintenance,
and replacement costs are accounted for in the annual operations budget.
1995
THE TERRY HAWS COMMUNITY SPACE IS RENOVATED INTO TRADE SHOW AND CONVENTION
SPACE. Formally wood floor sports courts, a running track, lockers rooms and storage, this area is turned into
more trade show and convention space.
2003
THE CITY OF ST. CLOUD PASSES A 1/2 % GENERAL SALES TAX TO FUND A NEW LIBRARY.
The civic center expansion project became more focused.
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
2.4
2
2005
Background THE CITY COMPLETED ITS FINANCIAL OBLIGATION FOR THE ORIGINAL PROJECT BOND AND
Narrative BEGAN ACCUMULATING FUNDS FOR THE EXPANSION PROJECT.
2006
A $1.5M INTERIOR RENOVATION IS COMPLETED THAT INCLUDED FINISH UPGRADES AND A GEN-
ERAL FACELIFT.
2007
THE CITY OF ST. CLOUD SUBMITTED A CAPITAL REQUEST FOR THE EXPANSION PROJECT.
2008
THE LIBRARY OPENED THE DOORS TO A NEW FACILITY, EIGHT BLOCKS WEST OF THE EXISTING
SITE.
2008
STATE BONDING BILL PROVIDED $2 MILLION TOWARD THE EXPANSION THAT WAS MATCHED BY
THE CITY OF ST. CLOUD FOR A TOTAL OF $4 MILLION. The total $4 Million is being used to acquire the
existing site area, demolish the existing building, prepare the site for construction and complete the planning
and design process.
Fall 2009
THE FORMER ST. CLOUD PUBLIC LIBRARY BUILDING IS DEMOLISHED TO MAKE WAY FOR ST. CLOUD
CIVIC CENTER EXPANSION PROJECT.
2009
THE LEGISLATURE APPROVED ANOTHER $2 MILLION FOR THE PROJECT, BUT FUNDING WAS VE-
TOED.
2010
THE CITY OF ST. CLOUD IS REQUESTING PARTIAL PROJECT COSTS OF $15.1 MILLION IN STATE
FUNDING FROM THE 2010 LEGISLATURE TO ASSIST IN PLANNING, DESIGN, CONSTRUCTION AND
EQUIPMENT COSTS, TO FINISH THE PROJECT. A local contribution of $15.1 million would be matched to-
wards the project using proceeds from an existing 1% Food and Beverage tax to retire a Debt Service Bond,
with a total expansion cost of $34,200,000.
July, 2010
ANTICIPATED DATE CONSTRUCTION CREWS ARE EXPECTED TO ARRIVE, PROVIDED FUNDING IS
GRANTED.
September, 2011
ANTICIPATED DATE CONSTRUCTION WILL BE COMPLETED WITH A CERTIFICATE OF OCCUPANCY
OBTAINED, PROVIDED FUNDING IS GRANTED.
Conclusion
The need for this project has been identified and debated for over 12 years. From the CSL study and input from
facility users, it is clear that the expansion is needed and will be financially viable.The impact the project will have
on the Central Minnesota region will be significant. The design and construction of the project will bring numer-
ous jobs to the area during difficult times, and with the completion of the project, significant dollars will be inject-
ed into the local and regional economy through the use of the facility. It’s time for this project to move forward.
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
2.5
3
Project Project Description
Description
Expansion Project Program Summary
• 2 story entry/lobby addition on the South side, acting as a “front door” and providing visible access points
for users.
• An accommodating and open lobby / pre-function area for events.
• Additional exhibit hall space to accommodate larger events, including concerts, tradeshows, sporting
events, receptions, etc.
• Additional storage spaces to store the equipment necessary to serve the building’s diverse events.
• Restroom facilities to accommodate up to 4,600 occupants.
• Catering kitchen with coolers/freezers to assemble food and beverages for events.
• New receiving area to provide for loading and unloading of equipment and supplies during events.
• Offices of appropriate size and location to meet the administrative requirements of the expanded facility.
• Meeting rooms for event coordination.
• Stand alone parking ramp facility for approximately 300 vehicles, with expansion for up to 600.
EXISTING SPACE TABULATION
Area (s.f.)
1st Floor 2nd Floor
Terry Haws Hall .............................. 26,486 .
Lobby / Circulation ...........................2,963
.
Glenn Carlson Hall ........................ 15,024 Storage .................................................5,100
Lobby ....................................................7,900 Restrooms ...........................................1,016
Restrooms ...........................................2,032 Office ....................................................1,576
Storage .................................................1,644 Meeting Rooms ..................................8,840
.
Concessions .........................................421 .
Running Track .....................................8,000
Catering Kitchen ................................2,273 Common / Misc. .................................7,505
.
Circulation ..........................................6,305
Office .......................................................414 TOTAL ...................................35,000
Common / Misc. .............................. 12,001
TOTAL ...................................74,500 GRAND TOTAL ..................109,500
NEW SPACE PROGRAM TABULATION
Area (s.f.)
1st Floor 2nd Floor
.
Trade Show A .................................. 16,000 Prefunction / Lobby ...........................4,952
.
Trade Show B .................................. 16,000 .
Circulation ..........................................3,150
Lobby ................................................. 10,890 Restrooms ...........................................1,040
Restrooms ..............................................812 Storage .................................................8,192
Storage .................................................1,309 Meeting Rooms ..................................1,064
Circulation / Stairs / Elev. ................5,708 .
Mechanical / Electrical .........................975
Catering Kitchen ................................1,550 Common / Misc. .................................3,627
Garage / Service .................................2,191
Refuse ......................................................626 TOTAL ...................................23,000
Common / Misc. .................................6,414
TOTAL ...................................61,500 GRAND TOTAL ....................84,500
GRAND COMBINED .........194,500
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
3.1
3
Project Significant Code Issues
Description Due to the location of the Civic Center addition, 3 exits from the west side of Terry Haws Hall will need to
be relocated to maintain the required number of exits. The building expansion will be adding up to 4,600
more occupants, according to building code calculations, depending on the event. Examples of anticipated oc-
cupant loads for some events include:
• Musical concert - floor and bleacher seating of approximately 3,000.
• Boxing/wrestling/ultimate fighting match - floor and bleacher seating of approximately 1,600.
• Tradeshow event - approximately two hundred 8x10 booths with up to 4,600 visitors.
The Civic Center addition will require a minimum of 4 new exits with a total required exit width of approxi-
mately 76 feet. The increased occupant load in the facility will require approximately 19 toilets/urinals for
men, 36 toilets for women, and 12 lavatories for each.
The existing Civic Center is built of Type I, fire resistive construction and has a fully automatic sprinkler
system. The Civic Center addition will be constructed as Type IB and will have a fully automatic sprinkler
system. Currently Minnesota uses the 2006 edition of the International Building Code with Minnesota State
Amendments. The new parking ramp will be constructed as Type IIB and will not have a sprinkler system. The
proposed Civic Center addition and parking ramp will be designed to meet applicable codes, including acces-
sibility requirements.
Specialty Requirements / Bibliography of Applicable Codes, Standards, etc.
Building Systems for this facility will be designed in accordance with the current Minnesota Building Code, as
well as other industry standards as appropriate, including the following:
• State of Minnesota Design Guidelines
• Minnesota Sustainable Building Guidelines
• International Building Code 2006
• Minnesota Building Code 2007
• National Fire Protection Standards (NFPA)
• Minnesota Fire Code
• Chapter 7676 Minnesota Energy Code 1999
• Chapter 1346 Amendments to the Uniform Mechanical Code 1994
• Chapter 4175 Minnesota Plumbing Code 1998
• National Electric Code 2002
• American Society of Testing and Materials (ASTM)
• Current ADA and ADAAG Guidelines
• Building Air Quality - A Guide for Building Owners, Facility Managers and Agent Contacts
The State of Minnesota Building Infrastructure Guidelines for State Owned Buildings are not applicable to this
project, since it is a project for a local government unit.
See Chapter 4 “Specialty Requirement Details” for additional information.
Architectural Systems
The following is a description of the materials and building systems envisioned for the new addition:
Concrete & Masonry
The Civic Center addition will have concrete footings consisting of strip footings and pads with reinforcing
steel as required by the final structural design. Foundations will consist of either cast-in-place concrete, CMU
or precast wall panels. Slab on grade is assumed to be 5” thick with reinforcing mesh over 6” granular fill
to support large vehicles within the Civic Center. Elevated floor slabs are assumed to be either 12” precast
hollow core planks with 2” of concrete topping or 4” concrete on metal deck with a structural steel frame
as required. The parking ramp will consist of a combination of cast-in-place concrete, precast concrete and
CMU for the footings, foundations, floors and walls.
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
3.2
3
Structural Steel
Project
Description The existing Civic Center uses a structural steel frame and open web steel roof joists above grade. The roof
height of the Civic Center addition is expected to be at the existing roof height so additional snow drift load-
ing should not occur on the existing facility. The addition will use a structural steel frame and open web steel
roof joists to match the existing ceiling height in Terry Haws Hall. The parking ramp is not expected to use
any structural steel beyond concrete reinforcing and smaller members for stair and roof support.
Roof System
The roof for the Civic Center addition is expected to incorporate a ballasted or adhered EPDM roof. It is
expected that the existing roof will be re-roofed in a similar and matching system.
Exterior Walls
The new exterior shell for the Civic Center addition will consist of:
• Insulated architectural precast panels with high quality finish and detailing. Allows for future expansion.
• Composite metal panels at the south wall.
• Glazed curtain wall system with tinted low e glass and spandrel panels.
All necessary wall insulation, vapor barriers and blocking will be designed to comply with energy code re-
quirements and sustainability goals.
Doors
The entry systems will include aluminum doors and frames, and required egress hardware. Exterior service
doors will be insulated hollow metal Overhead doors will be insulated sectional steel type with power oper-
aters, at least14’-0” x 14’-0” to accommodate large vehicles.
Interior Finishes
Lobby: Carpet tile flooring, wood veneer panels, granite wainscot, ACT ceiling and
painted gyp. bd. soffits, display cases for baseball museum and local art
Restrooms: Tile flooring, tile wall to ceiling height, ACT ceiling, accessible fixtures and acces-
sories
Offices: Carpet flooring, painted walls, carpet base, ACT ceiling
Catering Kitchen: Tile flooring, FRP walls, vinyl ceiling tile, stainless steel work surfaces
Exhibit Hall: Sealed concrete floors, painted CMU or precast walls some CMU walls with
acoustical block, vinyl base, exposed metal grid ceiling with acoustical spray tex-
ture on roof deck, acoustical panels over walls in some locations, movable walls
with STC rating of 55 or better
Stairs: Service stairs: Rubber flooring, painted walls, exposed painted ceiling
Finished stairs: Granite treads with metal risers and stainless steel railing system
Concessions: Sealed concrete floor, painted walls, vinyl tile ceiling, solid surface work surfaces
Meeting rooms: Carpet flooring and base painted walls, ACT ceiling
Second floor lobby: Carpet tile flooring, painted gyp. bd. walls and wood veneer panels, granite wain-
scot, ACT ceiling and painted soffits and specialty lighting
Storage: Sealed concrete floors, painted walls, ACT ceiling or exposed ceiling
Loading dock: Sealed concrete floors, painted walls, painted ceiling.
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
3.3
3
Service corridor: Sealed concrete floor, painted walls, ACT ceiling
Project
Description Parking ramp: Sealed concrete floors, painted or exposed concrete walls and ceilings, metal
railing detailing
Typical framed partitions will be constructed with metal studs and 5/8” gypsum board on each side.
Interior doors will be painted or prefinished hollow metal with metal frames with acoustical detailing
Ceilings are anticipated to be either suspended 24” x 24” acoustical ceiling tile, painted gypsum board or
other decorative ceiling system (to be determined).
Specialties
Toilet partitions and urinal screens will be floor mounted solid plastic, and restroom accessories will be pro-
vided as required.
Operable walls will be provided to subdivide the new exhibit hall space and to provide separation from the
existing Terry Haws Hall with a minimum 55 STC.
Fire extinguishers will be provided in metal cabinets in public areas and surface mounted in non-public areas,
as required by code.
Code required building signage will be provided. Additional signage will be incorporated on the exterior
including main facility identification at the canopy and west wall, door identification, general circulation and
directional signs and electronic event signage at the south end of the site and at the north end of the site.
Special signage for the ramp will be incorporated.
Elevators
A freight elevator will be provided to service the 2nd floor storage area in the Civic Center addition. A pas-
senger elevator will be provided to service the parking ramp. A passenger elevator will also be provided at
the SW corner of the Civic Center lobby to accommodate Civic Center vertical circulation as well as future
skyway traffic.
Mechanical Systems
Design Criteria
The contractor will be responsible for all labor, taxes, overhead, profit, permits, supervision, material,
equipment, and service necessary for complete electrical systems as specified herein and as shown on the
drawings.
• Comply with all current and applicable codes and standards as follows:
o Minnesota Building Code
o Minnesota Plumbing Code
o International Building Code
o International Mechanical Code
o National Electrical Code
o Minnesota State Board of Health
o Local Applicable Ordinances
o National Fire Protection Association
o Minnesota Energy Code
o OSHA
o SMACNA
o ASHRAE
o Americans with Disabilities Act
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
3.4
3
Project HVAC Scope Option Descriptions
Description
Addition: The addition will be served by 8 custom air handling units with chilled water cooling and hydronic
heating. Controls will feature CO outside air demand limiting, VAV fan energy reduction, system scheduling,
optimum start/stop. Heating will utilize 90-95% condensing boilers.
Existing Building: Replaces 13 existing rooftop units with “replace in kind” units. Retrofit forty (40) pneumatic
VAV box controls with new DDC controls. Replace VAV box reheat coil piping and piping sundries from
reheat coil thru shutoff valves. Provide new front end DDC system complete with workstation, latest
available software, full graphics for all HVAC systems, new controllers for all systems.
Demolition
Design Criteria
Contractor shall be responsible for all selective demolition of the existing HVAC systems as indicated on the
drawings, as specified herein, and as required to maintain complete functioning systems.
The existing HVAC unit replacement has three options; Option A utilizes air-cooled chillers & condensing
boilers with custom air handling units, Option B utilizes dedicated outside air units with “replace in kind”
units for the smaller meeting rooms, and Option C utilizes “replace in kind” units. There is considerably more
demolition for Options A & B.
Existing mechanical installation as shown on the drawings may not be completely accurate in all respects
with regard to quantities, locations, etc. and is shown primarily to generally illustrate the degree of selective
demolition work involved.
Scope
Selectively demolish rooftop HVAC units and duct transitions through the roof only.
Selectively demolish natural gas piping adjacent to the units, including gas shutoff valve and regulator, to each
of the existing rooftop units for reconnection to new units.
Demolish forty (40) pneumatic VAV box controls including room thermostats. Demolish VAV box reheat coil
piping and piping sundries from reheat coil thru shutoff valves.
Phasing will generally start from trade show spaces and progress thru meeting rooms and offices as spaces
are available.
Heating
Central Heating Plants
Addition
A new hydronic condensing boiler system will provide heat for unit heaters, reheat coils, and eight AHU coils.
System will have CV primary pumps for each boiler, and 100% redundant VV secondary distribution pumps.
AHU’s with high outside air percentage will have CV coil pumps.
There will be three (3) 2 million btu/hr boilers based on Lochinvar IBN2000 Intellifin Condensing Boilers.
Hydronic temperatures will be design around a 120°F supply and 100°F return to ensure highest possible
boiler operating efficiencies. Each boiler will have a constant volume inline circulation pump of 185 gpm @
25’ head.
There will be two (2) 100% redundant pumps with 350 gpm @ 60’ head each. Pumps will have variable
frequency drives with system pressure control.
Existing Building: “Replace in Kind” units will reuse the existing gas piping system.
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
3.5
3
Project Cooling
Description
Central Cooling Plants
Addition
A new air cooled chiller system will provide cooling for eight AHU coils. System will have CV primary pumps
for each chiller, and 100% redundant VV secondary distribution pumps.
There will be two (2) 200-ton air-cooled chillers based on York YCIV0197VA46.
There will be two (2) 100% redundant pumps with 800 gpm @ 60’ head each. Pumps will have variable
frequency drives with system pressure control.
Existing Building: “Replace in Kind” units will dx cooling.
Terminal Units
Unit heaters will be provided at each of the overhead doors; loading docks, and trash room. Heaters will be
derated for 120°F supply and 100°F return operating temperatures.
Cabinet unit heaters will be provided at each of the exterior vestibules and Terry Haws overhead doors.
Heaters will be derated for 120°F supply and 100°F return operating temperatures.
VAV reheat boxes will be provided at the meeting rooms and storage rooms to provide individual zoning.
Coils will be rated for 120°F supply and 100°F return operating temperatures. Each VAV box shall have in
order; shutoff valve, strainer, equal percentage control valve, coil, air vent, circuit setter, shutoff valve. Provide
Petes plugs on entering and leaving sides of coil for insertion of temperature and/or pressure probes.
Hydronic Piping
Piping will be sch 40 welded steel for 3” and larger, and Type “L” copper with 95/5 tin/antimony solder for
2-½“ and smaller. Piping for the Lobby entrances will routed through supply tunnel and encased in conduit
where they are required to penetrate the tunnel wall below grade. Insulation shall be1” thick fiberglass with
all service jackets.
Addition
The heating system will serve unit heaters, reheat coils, and eight AHU coils. The heating piping mains are 4”
heating water supply and return in a branched configuration limited to the addition. The cooling system eight
AHU coils. The cooling piping mains are 8” chilled water water supply and return in a branched configuration
limited to the addition.
Existing Building
“Replace in Kind” units will dx cooling and gas heating with no hydronic piping required. Existing radiation
piping, fin tube radiation, and cabinet unit heaters will remain as is with some minor exceptions where
radiation is no longer need due to building modifications. Existing reheat piping will remain as is except the
VAV box reheat coil piping and piping sundries from reheat coil thru shutoff valves will be replaced. Each
VAV box shall have in order; shutoff valve, strainer, equal percentage control valve, coil, air vent, circuit setter,
shutoff valve. Provide Petes plugs on entering and leaving sides of coil for insertion of temperature and/or
pressure probes.
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
3.6
3
HVAC
Project
Description Design Parameters
Outside air conditions: Summer 92 / 76 °F db / wb, Winter -20 °F
Inside air conditions: Summer 75 °F & 50% RH, Winter 72 °F
Cooling and heating requirements: Based on CLTD cooling method on Trane Trace calculation program.
Ventilation requirements: Ventilation air requirements are calculated per requirements of ASHRAE 62.1-2004.
Occupancy is based on space usage as determined by programming or people / sq ft as calculated by 62.1-
2004.
Exhaust requirements: Toilet / showers and janitor room exhaust requirements are based on 2 cfm/sq ft.
slightly above ASHRAE 62.1-2004 to assure moisture and odor removal.
Design Criteria
New Terry Haws Center and Lobby systems are based on multiple single zone VAV air handling units with
dx cooling and hydronic heating. Units will have return fan, filter section, dx cooling coil, hydronic heating
coil, and supply fan. Systems will provide airflow rate required to maintain dry bulb temperature setpoint.
Cooling supply air temperature will be maintained at about 55°F (resettable) to maintain humidity control.
Economizer will be fully functional to ensure full free winter cooling capability is maintained. See further
description under controls section.
Meeting rooms and back of house space systems are configured as variable air volume reheat systems with
30% minimum airflow. Units will have return fan, filter section, chilled water cooling coil, hydronic heating coil,
and supply fan. Systems will provide variable airflow rate required to maintain cooling temperature setpoint.
Reheat will be enabled whenever the minimum airflow rate is not capable of maintaining heating setpoint
temperature. Economizer will be fully functional to ensure full free winter cooling capability is maintained.
See further description under controls section.
Existing Terry Haws Center and Glenn Carlson Hall replacement provides inexpensive “replace in kind”
packaged gas heating and electric cool rooftop units on curb adapters fitted to existing curbs. Units will be
VAV to provide fan energy savings and dehumidification at partial load.
Existing Meeting Rooms and Offices replacement provides inexpensive “replace in kind” packaged gas heating
and electric cool rooftop units set on curb adapters fitted to existing curbs. Units will be VAV to provide to
match needs of the VAV boxes.
Supply ductwork from the AHUs to the VAVs shall be “Medium Pressure” 4 inwg pressure class construction
with a maximum velocity of 1800 fpm and a maximum friction loss of 0.10 inwg/100’ duct. All other ductwork
(except parking garage exhaust duct) shall be “Low Pressure” 2 inwg pressure class construction with a
maximum velocity of 1500 fpm and a maximum friction loss of 0.06 inwg/100’ duct.
Exhaust systems include three (3) toilet room exhausts for the Lobby and back of house groupings, four (4)
exhausts for the loading dock vehicle exhaust control, one (1) exhaust for catering, and one (1) exhaust for
trash odor control.
Existing parking garage exhaust systems will have two (2) replacement exhaust fans on the roof with
ductwork relocated and integrated into the new building addition. Parking garage exhaust ductwork will
extend from the upper parking and lower parking levels, connected by level, through the roof of the addition.
Below grade will be fiberglass, and above grade will be galvanized as described in the product section. Parking
garage exhaust ductwork shall be “Low Pressure” 2 inwg pressure class construction with a maximum
velocity of 1500 fpm and a maximum friction loss of 0.08 inwg/100’ duct. for the existing parking garage,
Noise level goal for the HVAC systems (without contribution from background noise will be less than RC
(N) 30 for trade show spaces, and RC (N) 35 for meeting rooms. This goal will require careful selection of
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
3.7
3
equipment, and use of duct sound attenuators in key areas.
Project
Description Zone controls will be updated with new DDC local area controllers, sensors, actuators, and control wiring.
VAV controls will provide airflow control, airflow monitoring, discharge temperature monitoring, zone
temperature control, space temperature sensor with limited setpoint adjustment.
Product
Addition AHUs
There are eight custom air handling units: four (4) 14,000 cfm units, two (2), 21,500 cfm units, one (1) 6,500
cfm, one (1) 2,000 cfm. Custom air handling units for the addition will be have return fan, economizer section,
filter section, dx cooling coil, hydronic heating coil, and supply fan. Housing will be 4” dual wall insulated
system with sloped roof for outdoor service. Supply and return fans will have variable frequency drives and
“out of airstream” inlet venture flow sensors. Fans will have AcoustiFlo™ sound attenuating shrouds to
lower the sound power at the AHU. Coils will be sized for a maximum velocity of 450 fpm. Filters shall be
2” MERV 8 prefilter & 12” MERV 11 postfilter. Dampers shall be very low leak with insulated and thermally
broken blades. Custom units are based on Haakon™.
Existing Glenn Carlson & Terry Haws AHUs: There are six “replace in kind units”: (3) 30-ton, (3) 50-ton.
Units are “replace in kind” packaged gas heating and electric cool rooftop units on curb adapters fitted
to existing curbs. The existing ductwork has sound attenuators that will remain in place for the alternate.
Replace in kind units are based on Carrier 48A.
Existing Meeting Rooms, Offices, and Corridor AHUs: There are seven “replace in kind units”: (4) 25-ton, (2)
30-ton, (1) 40-ton. The “replace in kind” units are packaged gas heating and electric cool rooftop units on
curb adapters fitted to existing curbs. The existing ductwork has sound attenuators that will remain in place
for the alternate. Replace in kind units are based on Carrier 48A.
Exhaust systems will utilize up blast or sidewall centrifugal fan systems to disperse odors based on Greenheck
CUBE AND CWB models respectively.
Above grade ductwork shall be G90 galvanized sheetmetal constructed to SMACNA construction standards.
Rectangular duct shall have TDC joints, and round duct shall be spiral. Provide five feet of tedlar lined flexible
ductwork for the final connection to each lay-in ceiling diffuser. Exposed ductwork will be constructed of
paint grip galvanized sheetmetal. Insulation consists of 1 ½” thick 3 lb. density semi-rigid glass fiberboard for
rectangular duct and 1 ½” thick 1-½ lb. density flexible fiber blanket for round duct. All insulation will have a
foil scrim vapor barrier. Exposed supply duct in the Terry Haws Center will not be insulated.
Below grade exhaust ductwork shall be dual duct insulated fiberglass reinforced plastic (FRP) ductwork based
on Spunstrand FSK R4. Duct shall be engineered for expected soil loading conditions, have an ‘R’ Value of 4,
and a U.L. listed fire retardant liner. The Lobby will be served by an accessible underground concrete tunnel
with 1½” thick extruded Styrofoam under the floor and on the exterior of the walls. Duct extensions from
the tunnel will be FRP.
Supply ductwork and return ductwork mains shall be constructed with low pressure loss fittings without
constrictions that can generate noise. Elbows shall be minimum 1.5 centerline radius only and tighter bends
shall be constructed with splitter elbows to achieve the same minimum 1.5 centerline radius. Branch mains
shall be constructed using proportional airflow splits and elbows as appropriate. Offsets shall be limited
to only those required by permanent physical obstructions; Contractor shall coordinate all work to avoid
unnecessary offsets.
Offsets and transitions shall be limited to a 1 to 2 ratio for converging and a 1 to 3 ratio for diverging flow.
Branch ductwork may utilize 45 degree entry taps or low loss manufactured fittings. No straight taps are
allowed.
Sound attenuators will be located near the AHU’s to reduce the space noise levels. Selections are based on
60” long VibroAcoustics™ RFL-LV-F2.
Lay-in diffusers shall be rectangular high efficiency type. Exposed duct shall have two-way airfoil blade surface
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
3.8
3
mount diffusers. Lay-in return grilles shall be eggcrate with frame to allow sound boot to be attached.
Project Exposed ductwork (Terry Haws) shall have perforated diffusers based on McGill Duct-D-Fuser™.
Description
Provide return grilles with galvanized transfer boot lined with 1” thick 3psf acoustic duct lining. Boot shall
have two mitered elbows (one vertical and one horizontal) and no line of sight in either direction.
Automatic Temperature Controls
Direct Digital Controls (DDC) that is compatible with the existing Building Automation System (BAS). DDC
system shall provide control of all HVAC functions including; temperature setpoints, occupancy scheduling,
monitoring & alarming points, and trending functions.
New Terry Haws and Lobby air handling units will have field supplied controls capable of providing; CO based
outside air demand limiting, individual return & relief plenum pressure control, individual supply & return fan
speed control, unit supply & return airflow differential reset by common building static pressure, coil pump
enable, heating coil modulated control, dx staging and hot gas bypass control.
New Meeting Rooms and Storage air handling units will have field supplied controls capable of providing;
Occupancy based outside air demand limiting, individual return & relief plenum pressure control, individual
supply & return fan speed control, unit supply & return airflow differential reset by common building static
pressure, coil pump enable, heating coil modulated control, dx staging and hot gas bypass control. New VAV
reheat boxes will have analog outputs (air volume damper, hydronic reheat valve) and analog inputs (space
temperature, discharge air temperature, airflow) controlled by local area controllers.
Existing building air handling units will utilize inexpensive “replace in kind” packaged VAV gas heating and
electric cool rooftop unit control. Control is limited to monitoring and enable strategies utilizing a BacNet or
LonWorks communications card.
Existing VAV reheat boxes will have analog outputs (air volume damper, hydronic reheat valve) and analog
inputs (space temperature, discharge air temperature, airflow) controlled by local area controllers.
Plumbing
Design Criteria
Plumbing modification involve rerouting of rainwater piping from the west face of existing building to new
locations at the building connection of the new addition.
New plumbing work involves stacked men’s and women’s restrooms in the front of the house, and
miscellaneous restrooms and janitor’s rooms. Fixture count is approximately 8 urinals, 32 water closets,
33 lavatories, 1 shower, 5 janitor’s sinks, 8 water coolers, 4 three compartment sinks, 6 kitchen sinks, 1
commercial dishwasher, 4 hose bibbs.
Domestic water piping sizing shall be shall have a maximum velocity of 8 fpm, a maximum friction loss of 2.5
psi/100’ pipe, and the Minnesota Pluming Code. Domestic required water service size is 4” with current
demand for both existing and new building loads.
The existing 3” water service is routed below a portion of the existing building, and approximately 25’ of the
existing main will be retained. Site utilities will provide a 4” new connection to the existing 3” main 5’ outside
of the existing building line to the relocated street main. The existing 3” meter will remain but a 4” main after
the meter will extend to connect to the 3” existing main above the first floor ceiling and tee into a new 3”
main for the new addition.
Product
Domestic water piping shall be type “L” copper with 95/5 tin/antimony solder. Insulation shall be 1” thick
fiberglass with all service jacket.
Sanitary drain, rainwater leader, waste, and vent piping shall be no-hub cast iron.
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
3.9
3
Water closets shall be vitreous china, elongated bowl, wall mount (with carrier), flush valve, 1.6 gallons per
Project flush, with open front seat.
Description
Urinals shall be vitreous china, wall mount (with carrier), flush valve, 0.5 gallons per flush.
Lavatories shall be vitreous china, wall mount (with carrier), with grid drain, and single lever faucet with 4”
centers.
Water Coolers shall be dual level ADA 8gph recessed units.
Elevator in the Addition and at the Ramp (typical of 3) will have sumps with dual sump pumps.
Four vehicle bays in the Addition will have trench drains that drain through a flammable waste trap. All of the
area drains in the Ramp will drain to a through a flammable waste trap.
Fire Protection
The existing building is currently sprinkled throughout. The piping system within the existing building will
modified to provide the required coverage for the new architectural layout. Recessed pendent sprinkler
heads will be used in most areas.
The existing standpipe system will be extended to the 2 new stairwells within the addition. A new standpipe
with 2-1/2” hose connections at each landing will be provided in each stair. Standpipe distribution will be 8”
for the portion of piping serving the chair storage area (see below). Remaining standpipe distribution piping
will be 6”.
The addition will be served by 5 new sprinkler zones
Two zones, one on each floor, will be connected to the standpipe at the southwest stair of the addition
(noted as Stair 102 on the First Floor). These zones will serve the two levels of Area 2.
Three additional zones, one on each floor and one for the exhibition space, will be connected to the
standpipe at the northeast stair of the edition (noted as Stair 124 on the First Floor). These zones will serve
the two levels of Area 1.
The existing 8” fire service is routed below a portion of the addition and will need to be relocated south
approximately 50 feet and reconnected to the existing sprinkler riser assembly.
The existing fire department connections will be relocated due to a conflict with the new addition. This will
be done with a new 4 outlet fire department connection (or a Storz connection if requested by the City)
for the wet sprinkler system to comply with Minnesota Fire Code 905.2.1.4 and a 2 inlet fire department
connection for the existing dry standpipe system serving the garage area.
Basic material system components to include
Wet systems: UL listed/FM approved galvanized threadable lightwall steel pipe, ASTM A135 or A53 or UL
listed/FM approved black lightwall pipe, ASTM A795.
prinklers shall be quick response. Chrome recessed pendent in finished areas. Brass upright and pendent in
unfinished areas.
All sprinkler products must be UL listed and/or FM approved.
All sprinkler and standpipe systems shall be hydraulically calculated.
Hazard Classification:
Mechanical rooms, and electrical rooms shall be considered as Ordinary Hazard Group 1.
Storage rooms (except for the chair storage) and exhibition spaces shall be considered as Ordinary Hazard
Group 2.
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
3.10
3
Remaining areas shall be considered as Light Hazard unless otherwise noted or otherwise required by the
Project authority having jurisdiction.
Description
The chair storage area on the 2nd floor north end of the edition will be designed for storage of group A
plastics stored at a height between 5 feet and 8 feet with a design density of at least 0.4 GPM / sq ft. Remote
area will be 2500 square feet. Design Hose Stream will be 500 GPM.
The sprinkler and standpipe systems shall include all necessary zone valves, flow switches, drains etc. for a
complete and operational system.
Due to the hydraulic requirements of the chair storage area a fire pump will be required. Assume 1250 GPM,
70 PSI Boost, 75 HP.
Testing
Air handling units will be verified for proper operation, supply & return airflows, outside airflow, heating and
cooling discharge temperatures, plenum & building static pressure control.
HVAC reheat boxes shall be verified for proper airflow (minimum and maximum), heating water flow, heating
and cooling operation.
Ductwork shall be tested for leakage and sound power as requested by the Engineer.
All piping shall be pressure tested prior to placing into service.
Electrical Systems
Electrical Design Scope
The electrical building systems described in this document are new or modifications to existing Power
Distribution Systems, Lighting Systems, and Fire Alarm System.
Code Compliance
The design of this facility will be compliance with the current NEC, IBC, IFC, Minnesota Codes with approved
amendments, and local codes.
B3 Certification
The facility is to adhere to the State of Minnesota Sustainable Building Guidelines. This will require the
building energy consumption to be 30% less than the Minnesota Energy Code. Eliminating light trespass from
the site and reducing the contribution of site lighting to the overall electrical energy cost. Daylight harvesting
strategies and occupancy sensors will be used to reduce general lighting energy consumption to meet
guideline objectives.
POWER DISTRIBUTION SYSTEMS
Electrical Service
The existing electrical service is not of sufficient capacity for the proposed addition, and the existing utility
transformer location will need to be relocated to avoid the footprint of the proposed addition.
A new service transformer and connection cabinet will be located outdoor on north side of the building. This
will be a utility provided transformer with a 480Y277 volt, 3 phase, 4 wire secondary.
A new main switchboard will be 3000 amps, 480/277 volts, 3 phase with full neutral and copper bussing.
This switchboard will contain multiple sections for expandability. Sections shall include a 2500 amp bolted
pressure main switch, a transient voltage surge suppressor (TVSS), customer power monitoring/metering, and
fused distribution switches.
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
3.11
3
Project Grounding electrode conductor will be connected to building water service, steel rebar encased in concrete
Description footings, structural steel if available, and auxiliary ground rods.
Normal Power Distribution
The power distribution system will consist of a main service electrical room located in the second level of
the addition, corridor surface mount panelboards, a first floor electrical/communications closet, and a second
floor electrical/communications closet.
A 480/277 volt, 3 phase, 4 wire lighting branch circuit panelboard will be in the main electrical room and will
serve the lighting loads. A relay control panel will be located adjacent to the lighting panel to provide control
as described elsewhere in this document. Outdoor lighting will be served from this panelboard.
A 480/277 volt, 3 phase, 3 wire mechanical power panel will be provided in the main electrical room, and shall
serve all mechanical loads.
Each floor shall have a 480-208/120 volt, 3 phase step down transformers to serve receptacle/miscellaneous
loads. Each transformer will feed a panelboard that feeds local loads.
Circuit-breaker type branch circuit panelboards with copper bus and 25% spare spaces. The panelboards will
be dead front construction with a hinged door and a hinged cover. Circuit breakers will be bolt on type.
Branch Circuitry
Branch circuits will be copper conductors installed in steel conduit.
All light switches and duplex receptacles will be provided with stainless steel plates.
LIGHTING
Design Criterion
Design light levels will be based on the 9th Edition of the Illuminating Engineering Society of North America
(IESNA) Handbook. The lighting power density will exceed 1989 ASHRAE 90.1 by 30% to comply with
Minnesota B3 requirements, in addition power density will target a value that exceeds 2004 ASHRAE 90.1 by
30%. The light levels and power density will be as follows:
Light levels indicated in the above table are a minimum level and higher levels will be achieved as limited by
the allowable power density
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
3.12
3
Exterior Lighting
Project
Description Exterior uncovered entries will be illuminated with building-mounted High Pressure Sodium (HPS) lighting.
Light fixtures will be full cutoff type of luminaires.
Exterior covered entry lighting will be illuminated from the bottom of the canopy with metal halide lights.
All outdoor lighting will be controlled by an automation lighting control system utilizing a combination of
photo sensor and astronomical time clock control.
Interior Lighting
Interior lighting will utilize T5 fluorescent lamps, T8 fluorescent lamps or compact fluorescent lamps in single
story spaces and T5HO fluorescent lamps in the exhibit hall.
The exhibit hall will utilize 2x4 high bay fluorescent light fixtures.
The loading dock area will utilize wet location fluorescent light fixtures.
Lighting in circulation spaces will utilize high efficiency linear fluorescent fixtures.
Lighting in storage and utility spaces will be surface or suspended 4 foot industrial fluorescent strips with T-8
lamps and electronic ballasts.
Emergency egress lighting will consist of battery pack light fixtures.
Exit lights will be LED type with red face and UL listed 6B83.
Lighting Control
Lighting control will be accomplished with multiple control strategies and combinations of strategies as
follows:
A lighting control system will be provided to perform time schedule control. This control system will be
fully addressable and will have the flexibility of grouping lighting into control groups to provide flexible and
adjustable spaces. This control system will be provided with communications to the civic center building
automation system to allow time schedule on/off set points to be entered.
Daylight control will be provided by photo sensors located in the space controlled. Both dimming and
stepped switching daylight strategies will be considered in conjunction with the Xcel Energy Design Assistance
Program.
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
3.13
3
Scene control will provide three zones of lighting control and a minimum of four preset scenes.
Project
Description Dual technology occupancy sensor controls will be utilized where occupancy control is utilized. Sensors shall
be off only control where manual switches are present.
SYSTEMS
Fire Alarm
A fire alarm system will be provided for the civic center expansion. The fire alarm control panel will provided
under part C of this narrative. Main fire alarm control panel will be located in the electrical room.
A remote fire alarm annunciator panel will be located in the main entry where readily accessible to local Fire
Department personnel.
Alarm and trouble contacts will be interconnected to campus building automation system for monitoring
purposes.
Duct smoke detectors will be provided for all AHU’s and fire/smoke damper operations.
Audio/Visual signal alarm indicating appliances will be provided throughout the building.
All wiring will be installed in conduit.
Voice and Data
This building will be equipped with a structure data cabling system including shared electrical/data closets on
each floor. Electrical/data closets will be stacked vertically.
Voice and data outlets will be provided in all offices and where necessary to meet space program
requirements. Cable and termination devices will be provided by the owner. 1 ¼” Conduit stub ups shall be
provided by the contractor and will run from outlets to accessible ceiling space.
Security
Security systems will be provided by the owner. Raceway will be provided by the electrical contractor.
Location and quantity of access control devices will be determined by the owner’s security personnel.
Video camera system
Video cameras will be provided by the owner. Raceway will be provided by the electrical contractor.
Location and quantity of cameras will be determined by the owner’s security personnel.
Intercom system
No intercom systems will be provided at the loading dock.
PARKING RAMP
POWER DISTRIBUTION:
Electrical Service
The new electrical service for the parking ramp will come from a utility transformer vault in the adjacent alley.
CT metering will be provided within the ramp.
A new service entrance rated 600 amp, 480/277 volts, 3 phase panel will be provide on the first level of the
parking ramp.
Grounding electrode conductor will be connected to building water service, steel rebar encased in concrete
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
3.14
3
footings, structural steel if available, and auxiliary ground rods.
Project
Description Normal Power Distribution
The power distribution system will consist of a main service electrical room located on the first level of the
parking ramp.
The service 480/277 volt panel will feed all 480 and 277 volt loads as well as a 480-208/120 volt step down
transformer.
A 100 amp, 208/120 volt, 3 phase panelboard on the secondary side of the stepdown transformer will feed all
208 and 120 volt loads within the parking ramp.
Circuit-breaker type branch circuit panelboards with copper bus and 25% spare spaces. The panelboards will
be dead front construction with a hinged door and a hinged cover. Circuit breakers will be bolt on type.
Branch Circuitry
Branch circuits will be copper conductors installed in steel conduit.
All light switches and duplex receptacles will be provided with stainless steel plates.
LIGHTING:
Design Criterion
Design light levels will be based on the 9th Edition of the Illuminating Engineering Society of North America
(IESNA) Handbook. The lighting power density will exceed 1989 ASHRAE 90.1 by 30% to comply with
Minnesota B3 requirements, in addition power density will target a value that exceeds 2004 ASHRAE 90.1 by
30%. The light levels and power density will be as follows:
Light levels indicated in the above table are a minimum level and higher levels will be achieved as limited by
the allowable power density
Exterior Lighting
Exterior uncovered entries will be illuminated with building-mounted High Pressure Sodium (HPS) lighting.
Light fixtures will be full cutoff type of luminaires.
All outdoor lighting will be controlled by an automation lighting control system utilizing a combination of
photo sensor and astronomical time clock control.
Interior Lighting
Interior lighting will utilize T5 fluorescent lamps, T8 fluorescent lamps or compact fluorescent lamps.
The parking garage will utilize 4’ linear fluorescent lamps rated for cold weather applications.
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
3.15
3
Emergency egress lighting will consist of battery pack light fixtures.
Project
Description Exit lights will be LED type with red face and UL listed 6B83.
Lighting Control
Lighting control will be accomplished with multiple control strategies and combinations of strategies as
follows:
Daylight control will be provided by photo sensors located in the space controlled. Both dimming and
stepped switching daylight strategies will be considered in conjunction with the Xcel Energy Design Assistance
Program.
Dual technology occupancy sensor controls will be utilized where occupancy control is utilized. Sensors shall
be off only control where manual switches are present.
SYSTEMS
Fire Alarm:
No fire alarm system with the parking ramp.
Voice and Data:
This building will be equipped with a structure data cabling system for the office space. Data and telephone
equipment will occupy space in the first level electrical room.
Voice and data outlets will be provided in all offices and where necessary to meet space program
requirements. Cable and termination devices will be provided by the owner. 1” Conduit stub ups shall be
provided by the contractor and will run from outlets to accessible ceiling space.
Security/Parking Control:
Security systems will be provided by the owner. Raceway will be provided by the electrical contractor.
Location and quantity of access control devices will be determined by the owner’s security personnel.
Parking control system will be provided by the owner. Raceway will be provided by the electrical contractor.
Video camera system:
Video cameras will be provided by the owner. Raceway will be provided by the electrical contractor.
Location and quantity of cameras will be determined by the owner’s security personnel.
Intercom system:
No intercom systems will be provided.
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
3.16
3
CIVIC CENTER EXPANSION
Project
Description POWER DISTRIBUTION:
Electrical Service
No associated work with this phase.
Normal Power Distribution
No associated work with this phase.
Branch Circuitry
Branch circuits will be provided as required for all mechanical upgrades, lighting, and fire alarm systems.
Branch circuits will be copper conductors installed in steel conduit.
LIGHTING
Design Criterion
Design light levels will be based on the 9th Edition of the Illuminating Engineering Society of North America
(IESNA) Handbook. The lighting power density will exceed 1989 ASHRAE 90.1 by 30% to comply with
Minnesota B3 requirements, in addition power density will target a value that exceeds 2004 ASHRAE 90.1 by
30%. The light levels and power density will be as follows:
Light levels indicated in the above table are a minimum level and higher levels will be achieved as limited by
the allowable power density
Interior Lighting
Interior lighting will utilize T5 fluorescent lamps, T8 fluorescent lamps or compact fluorescent lamps in single
story spaces and T5HO fluorescent lamps in the exhibit hall.
New emergency egress lighting will consist of battery pack light fixtures.
New exit lights will be LED type with red face and UL listed 6B83.
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
3.17
3
Lighting Control
Project
Description Lighting control will be accomplished with multiple control strategies and combinations of strategies as
follows:
A lighting control system will be provided to perform time schedule control. This control system will be
fully addressable and will have the flexibility of grouping lighting into control groups to provide flexible and
adjustable spaces. This control system will be provided with communications to the civic center building
automation system to allow time schedule on/off set points to be entered.
Daylight control will be provided by photo sensors located in the space controlled. Both dimming and
stepped switching daylight strategies will be considered in conjunction with the Xcel Energy Design Assistance
Program.
Scene control will provide three zones of lighting control and a minimum of four preset scenes.
SYSTEMS
Fire Alarm:
A new multiplexed, fire alarm system will be provided for the civic center addition and the existing civic
center. The fire alarm control panel will be an addressable system with voice capability, with all peripherals to
provide a completely functional system. Main fire alarm control panel will be located in the electrical room.
A remote fire alarm annunciator panel will be located in the main entry where readily accessible to local Fire
Department personnel.
Alarm and trouble contacts will be interconnected to campus building automation system for monitoring
purposes.
Duct smoke detectors will be provided for all AHU’s and fire/smoke damper operations.
Audio/Visual signal alarm indicating appliances will be provided throughout the building.
All wiring will be installed in conduit.
Voice and Data:
No work with this phase.
Security:
No work with this phase.
Video camera system:
No work with this phase.
Intercom system:
No intercom systems will be provide.
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
3.18
4
Budget / Project Budget / Estimates / Alternates
Estimates ST. CLOUD CIVIC CENTER EXPANSION PROJECT
MASTER BUDGET SUMMARY AS of 2-22-10
CIVIC PARKING
CENTER RAMP TOTAL
01 GENERAL REQUIREMENTS
CONTINGENCY ALLOWANCE $1,700,000 $300,000 $2,000,000
OTHER GENERAL REQUIREMENTS $782,500 $299,922 $1,082,422
02 EXISTING CONDITIONS $212,084 $20,000 $232,084
022400 ENVIRONMENTAL ASSESSMENT/REMEDIATION $154,126 $0 $154,126
DEMOLITION - Library & M & H Building $389,075 $0 $389,075
03 CONCRETE $714,102 $2,623,600 $3,337,702
PRECAST CONCRETE $819,006 $707,320 $1,526,326
04 MASONRY & STONE $1,647,022 $235,900 $1,882,922
05 METALS - Furnish & Install $1,208,500 $67,384 $1,275,884
05 MISCELLANEOUS (Materials & Erection) $350,725 $249,800 $600,525
06 WOODS, PLASTICS AND COMPOSITES $197,630 $20,000 $217,630
07A THERMAL AND MOISTURE PROTECTION $1,585,013 $212,731 $1,797,744
08 OPENINGS $1,346,880 $142,940 $1,489,820
09 FINISHES $1,427,594 $96,000 $1,523,594
10 SPECIALTIES $513,874 $47,500 $561,374
11 EQUIPMENT $20,000 $262,400 $282,400
12 FURNISHINGS $104,095 $0 $104,095
14 CONVEYING EQUIPMENT $334,000 $206,000 $540,000
21 FIRE SUPPRESSION $224,108 $21,616 $245,724
22 PLUMBING $1,121,500 $210,000 $1,331,500
23 HVAC (HVAC, Piping, Ventilation & Temp. Controls) $2,422,392 $45,000 $2,467,392
26 ELECTRICAL $1,722,940 $617,120 $2,340,060
31A EARTHWORK $365,000 $503,920 $868,920
32A EXTERIOR IMPROVEMENTS $954,040 $44,480 $998,520
33 UTILITIES (Sewer, Domestic, Fire and Storm) $433,266 $64,500 $497,766
OWNERS F. F. & E. $1,980,000 $0 $1,980,000
HARD COST GROUP TOTALS $22,729,472 $6,998,133 $29,727,605
SOFT COST GROUP
DESIGN FEES (Architects, Engineers, Consultants) $1,281,425 $370,825 $1,652,250
CONSTRUCTION MANAGEMENT $369,667 $129,883 $499,550
LAND ACQUISTION COSTS $1,134,010 $0 $1,134,010
4TH AVENUE REALIGNMENT (PROJECT SHARE) $1,000,000 $0 $1,000,000
INSURANCE, BOND COSTS, OTHER $95,000 $5,000 $100,000
SOFT COST GROUP TOTALS $3,880,102 $505,708 $4,385,810
COST GROUP TOTALS $26,609,574 $7,503,841 $34,113,415
It should be noted that the project will consider and carry various additive and/or deductive alternates for
the project to respond to actual bid results and allow for priority selection of items at that time. Alternates
being considered include: various finish options for: ceilings, floors, walls, and precast panels, canopy options,
mechanical and electrical options and owner FFE options. These could total $1M-$2M.
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
4.1
5
Schedule Project Schedule
Schedule
Project Schedule Overview
Civic Center Parking Ramp
Schematic Design Phase ......................Jan - May 2009 Schematic Design Phase ......................Jan - May 2009
Design Development Phase ................ Jun - Sep 2009 Design Development Phase ................ Jun - Sep 2009
Construction Doc. Phase ......Sep 2009 - April 2010 Construction Doc. Phase ......Sep 2009 - April 2010
Bid Phase ......................................................... May 2010 Bid Phase ......................................................... May 2010
Construction Start.............................. June - July 2010 Construction Start.............................. June - July 2010
Substantial Completion.................................. Sep 2011 Substantial Completion...................................Jun 2011
Commissioning ...............................................Nov 2012 Commissioning ................................................ July 2011
Final Completion ............................................. Feb 2012 Final Completion ............................................. July 2011
Grand Opening ............................................... Apr 2012 Grand Opening ............................................... Aug 2011
The above schedule is contingent upon state funding being allocated during the 2010 session.
page
Project Update 1/3/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
5.1
6
Finance Finance Plan
Plan
CIVIC CENTER EXPANSION PROJECT
PROPOSED PROJECT FINANCE PLAN
It is the expectation of the City to receive $15,100,000 in State Bonding money during the 2010 legisla-
tive session to assist in the St. Cloud Civic Center Expansion Project, estimated to be $34,200,000. The
2008 State Bonding bill did include $2 mil for the project which has been matched by the City and used for
preliminary project expense. Those preliminary costs include acquisition of the M & H building, demolition of
the old library & M & H building and site preparation, including significant street utility work. Design fees and
consultation will use up the balance of the $4 mil.
The City is required to match a successful State Bonding Grant. The City’s financing plan for said match
would be fundamentally reliant on the existing 1% Food & Beverage Tax. Here are some points of interest
regarding existing and proposed Civic Center financial obligations:
• The F & B tax would continue to make Paramount Theater debt payments;
• The F & B tax would make the balance of the MAC debt service payments;
• The F & B tax could provide $50,000/year for Paramount capital improvements;
• The F & B tax could provide $50,000/year for MAC capital improvements;
• The F & B tax could provide a stream of debt service payments in the amount of $1,200,000/year
for Civic Center Expansion beginning in 2012 (and an increasing amount once the MAC and
Paramount debt is paid off).
It is proposed that the City would sell a bond redeemable via Food & Beverage tax collections.
The bond size could approach $19,000,000:
- $2 mil to match the 2008 State grant;
- $15.1 mil to match the 2010 State grant;
- $2 mil to cover HVAC and roof work for the existing building.
The bond would be paid off over a 20 to 25 year term with interest rates of 3 to 5%, depending upon the
type of bond issued for the project. The projected cash flow in the food and beverage fund will be sufficient
to support the $19 million bond.
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
6.1
7
Operating Operating Budget Impact
Costs
The impact of the Expansion Project has been estimated using the first 20 years of Civic Center history. The
increases from 2010 Estimate to Year 1 Post-Expansion are largely due to increased capacity but they also re-
flect a temporary down-turn in the market that has affected most hospitality properties and related facilities.
OPERATING REVENUE
2010 YEAR 1 ESTIMATED
ESTIMATES AFTER EXPANSION
Hotel/Motel Tax Collection $419,000 $500,000
Room Rental Income $575,000 $957,000
Concessions/Coffee Service $170,000 $234,000
Commissions: Catering, Decorating, etc. $184,000 $233,000
Event Cost Recapture Costs, etc. $200,000 $330,000
TOTAL OPERATING
REVENUE $1,548,000 $2,254,000
OPERATING EXPENDITURES
2010 YEAR 1 ESTIMATED
ESTIMATES AFTER EXPANSION
Full-Time/PT Employee Payroll Expense $879,200 $1,200,900
Supplies: Maintenance & Repair $155,200 $242,800
Utilities $263,600 $340,000
Concessions/Coffee Service Supplies $59,000 $82,000
Other Services & Charges $62,200 $73,700
TOTAL OPERATING
EXPENDITURES $1,419,200 $1,939,400
EXCESS REVENUES
OVER EXPENSES $128,800 $314,600
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
7.1
Appendix A
A
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
A.1
Appendix A
A
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
A.2
Appendix A
A
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
A.3
Appendix A
A
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
A.4
Appendix A
A
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
A.5
Appendix A
A
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
A.6
Appendix A
A
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
A.7
Appendix A
A
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
A.8
Appendix A
A
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
A.9
Appendix A
A
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
A.10
Appendix A
A
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
A.11
Appendix A
A
page
Project Update 3/1/2010 St. Cloud Civic Center Expansion Hagemeister Mack Architects
A.12
Get documents about "