					LOGFRAME PLANNING MATRIX
Title: Strengthening the central and local level capacities for environmental Programme name: National Programme for the former
management in the area of air quality                                         Yugoslav Republic of Macedonia under the IPA Transition
                                                                              Assistance and Institution building for 2008

                                                                                                     Contracting       Execution       Disbursement period expires one
                                                                                                     period expires    period expires year from the final date for
                                                                                                     two years from    two years from execution of contracts.
                                                                                                     the date of the   the final date
                                                                                                     conclusion of     for contracting
                                                                                                     the Financing
                                                                                                     Agreement
                                                                                                     Total budget:                    IPA budget:
                                                                                                     1.0 million EUR                  1.0 M EUR

Overall objective                                         Objectively verifiable indicators          Sources of Verification
The overall objective of the project is strengthening the - Training needs assessment and            -European Commission Progress
administrative capacities to implement and enforce           training action plan approved by        Reports
legislation at central and local level in the area of air    MoEPP;                                  - Conclusion from relevant Sub
quality.                                                  - Number of trainings and number of        Committee and Committee
                                                             trained staff ;                         between EC and the country
                                                          - Institutional capacity assessment and
                                                             action plan approved by MoEPP;
                                                          - Implemented actions for institutional
                                                             improvement as per action plan;
                                                          - Strengthen institutional capacities or
                                                             air monitoring, enabling the future
                                                             development of effective air quality
                                                             assessment and forecasting system
                                                          - Capacity building in dispersion
                                                             modelling (MOEPP and HMI)
Project purpose                                           Objectively verifiable indicators          Sources of Verification          Assumptions

Further approximation of national air quality related -     Training needs assessment and            -   Published legislation acts
legislation to EU legislation through drafting and          training action plan approved by         -   Monitoring reports           -   Commitment of institutions
adopting of legislation in the field of ambient air         MoEPP;                                   -   Commission reports           -   Providing dedicated staff in
                                                      -     Number of trainings and number of        -   Governmental reports             beneficiary institutions


                                                                                                                                                                         1
quality.                                                        trained staff ;
                                                           -    Institutional capacity assessment and
Strengthening of administrative capacities at central
                                                                action plan approved by MoEPP;
and local level to implement and enforce the air
                                                           -    Implemented actions for institutional
quality legislation
                                                                improvement as per action plan;
                                                           -    Strengthen institutional capacities or
                                                                air monitoring, enabling the future
                                                                development of effective air quality
                                                                assessment and forecasting system
                                                           -    Capacity building in dispersion
                                                                modelling (MOEPP and HMI)

Results                                                    Objectively verifiable indicators             Sources of Verification          Assumptions
1. Harmonization of the prioritized secondary              -   Training needs assessment and             -   published legislation acts   o   personnel by the beneficiary
legislation for air quality and emissions according to         training action plan approved by          -   monitoring reports               before the launch of the project;
the NPAA, aligned with EU directives in the air quality        MoEPP;                                    -   Commission reports
                                                                                                                                          o   Staffing of units receiving support
area:                                                      -   Number of trainings and number of         -   Governmental reports
                                                                                                                                              is sufficient to implement the
o Rulebook on the detailed conditions for                      trained staff ;
                                                                                                                                              mandate of the unit (in principle
     performing certain types of expert activities         -   Institutional capacity assessment and
                                                                                                                                              staff should at the minimum be as
     regarding the equipment, devices, instruments and         action plan approved by MoEPP;
                                                                                                                                              per formal staff establishment
     appropriate business premises which need to be        -   Implemented actions for institutional
                                                                                                                                              decision)
     fulfilled by the entities performing ambient air          improvement as per action plan;
     quality monitoring                                    -   Strengthen institutional capacities or                                     o   Allocation of working space and
o Rulebook on the form and the content of the model            air monitoring, enabling the future                                            facilities by the beneficiary for
     for submission of the data and the form, content          development of effective air quality                                           technical assistance before the
     and the method for keeping the diary;                     assessment and forecasting system                                              launch of the tender process;
                                                           -   Capacity building in dispersion
o   Rulebook on the emission limit values and types                                                                                       o   Organization,      selection  and
                                                               modelling (MOEPP and HMI)
    of polluting substances in waste gases from mobile                                                                                        appointment of members of
    pollution sources.                                                                                                                        working groups, steering and
o   Guidelines of the Rulebook on the emission limit                                                                                          coordination committees, seminars
    values and types of polluting substances in waste                                                                                         by the beneficiary as per work
    gases from mobile pollution sources.                                                                                                      plan of the project;
o   Rulebook to regulate methodologies and
    procedures in the creation, access, protection and                                                                                    o   Appointing the relevant staff by
    uniformity of air quality information in the related                                                                                      the beneficiaries to participate in
    institutions and the Country as a whole is reviewed                                                                                       training activities as per work
                                                                                                                                              plan. Cooperation with LSG Units
    and guidelines upon it is prepared.
                                                                                                                                              should include also involvement of
                                                                                                                                              association of majors (ZELS).


                                                                                                                                                                              2
2. Programme for stakeholders involvement in the air             Each LSG Unit should appoint
quality sector is designed, approved and implemented.            project contact person
The programme will take into account as well the
                                                             o   Availability of co-financing
coordination mechanisms between the institutions
involved, an action plan to improve the coordination         o   Availability of quality data
mechanism and public consultation.                               necessary for the test of the
                                                                 dispersion model available 3
3. Administrative capacity assessment, covering both             moths after the start of the
central and local level for implementation and                   contract.
enforcement of the air quality legislation, Action plan to
improve administrative capacities for air quality, are
developed and approved,
The assessment should cover all the aspects
(organizational structure, communication, staff, training
needs, equipment, etc.) to allow efficient and effective
implementation and enforcement of the law.
For the purpose of this analysis the main central level
institutions are Ministry of environment and physical
planning (Environmental          Information     Centre),
Environmental Inspectorate, Hydro-meteorological
Administration, Health Institute.
Local level institutions are the following six
municipalities: Municipality of Gostivar, Berovo,
Kavadarci, Aerodrom, Karpos and Bitola.

4. Prioritized actions of the action plan to improve
administrative capacities for air quality are applied.

5. Training action plan developed and adopted and
prioritized training measures implemented. Expected
number of trained staff from central and local
authorities, industries and NGOs is 55. The most
priority areas for training to be done within the frame of
the project include:
o Function of a dispersion model for central and local
     authorities (Hydro-meteorological administration,
     State health protection institute,
o Modern meteorological observation techniques and
     maintenance (Hydro-meteorological administration)



                                                                                                 3
o   QA/QC procedures for air quality measurements
    (MEPP)
o   Usage of National Environmental Information
    System in reference to air quality (MEPP, Hydro-
    meteorological    administration, State health
    protection institute, Municipality of Gostivar,
    Berovo, Kavadarci, Aerodrom, Karpos and Bitola,
    Large Combustion Plants )
o   Preparation on program for reduction and
    improvement of air quality and action plan for
    protection of air quality for (Municipality of
    Gostivar, Berovo, Kavadarci, Aerodrom, Karpos
    and Bitola )

6. Effective air quality assessment and forecasting
capabilities and data management on central and local
level

7. Development and adoption of methods and
procedures for air quality assessment, data processing
methods and datasets respecting QA/QC principles;

8. Review of detailed emission inventory and emission
data and preparation of air quality assessment for 2009
and revision of the list of zones and agglomerations;

9. Analysis of the current pilot local-scale dispersion
model. Preparation and approval of regional-scale
dispersion model, installation and test of the model in
pilot hot spots, simulations and put in operation. The
pilot hot spots are foreseen to be at Eastern and
Western zones and Skopje region agglomeration.

10. Established efficient National environmental
information system concerning air quality for the
improvement of reporting and access to information
formulated on the basis of Directive 2007/2/ЕC for the
establishment and operation of an Infrastructure for



                                                          4
Spatial Information in Europe (INSPIRE) and in
accordance with SEIS.

11. Pilot Program for reduction of pollution and
improvement of ambient air quality and action plan for
protection of the ambient air quality for reduction of air
pollution for Bitola prepared and agreed. Development
and approval of a National implementation plan for
further development and implementation of the acquis
in the air quality around the country.

12. Priority list for investments for air quality,
meteorological measurements and data management has
been prepared and approved. Developed and approved
tender Technical specifications for supply component of
the project.

13. Designed and implemented public awareness
campaign and dissemination of results.
Activities                                                 Means            Costs                       Assumptions
- Harmonise prioritised legislation with the directives, Twining contract   Twinning arrangement (1.0   o Appointment        of     counterpart
  in particular Framework Directive on the ambient air                      million EUR)                    personnel by the beneficiary
  quality assessment and management ( 2008/50/EC                                                            before the launch of the project;
  and 96/62/EC) and subsequent Daughter Directives                                                      o   Staffing of units receiving support
  (1999/30/EC,           2000/69/EC,          2002/3/EC,                                                    is sufficient to implement the
  2004/107/EC), EIA (85/337/EEC):                                                                           mandate of the unit (in principle
- Implement an institutional capacity assessment on
                                                                                                            staff should at the minimum be as
  both central and local level, develop an action plan to
                                                                                                            per formal staff establishment
  improve institutional capacities and implement
                                                                                                            decision)
  prioritised actions to improve institutional capacities;
- Implement an assessment of present enforcement                                                        o   Allocation of working space and
  capacities on local and central level, develop an                                                         facilities by the beneficiary for
  action plan to improve the enforcement capacities                                                         technical assistance before the
  and implement prioritised actions to improve the                                                          launch of the tender process;
  enforcement capacities;
                                                                                                        o   Organization,   selection    and
- Implement a training needs assessment; develop a
                                                                                                            appointment of members of
  training action plan, and implement prioritised                                                           working groups, steering and
  training for strengthening of institutional capacities                                                    coordination committees, seminars
  in air quality;


                                                                                                                                            5
- Preparation and adoption of the National plan,             by the beneficiary as per work
  programs and actions plans for protection of ambient       plan of the project;
  air quality
                                                         o   Appointing the relevant staff by
- Planning and building up meteorological data base
                                                             the beneficiaries to participate in
  with relevant QC methods and data transfer
                                                             training activities as per work
- Developing data processing methods and datasets to
                                                             plan. Cooperation with LSG Units
  provide needed meteorological information for
                                                             should include also involvement of
  dispersion modelling
                                                             association of majors (ZELS).
- Review of the detailed emission inventory for
                                                             Each LSG Unit should appoint
  dispersion modelling purposes for biggest stationary
                                                             project contact person
  sources and traffic in major cities
- Assessment of ambient air quality for the previous     o   Availability of co-financing
  year     and revision of the list of zone and
  agglomeration                                          o Availability   of quality data
- Assess the detailed equipment needs of the MoEPP           necessary for the test of the
  and HMI and procure the prioritised equipment for          dispersion model available 3
  air monitoring and data management system.                 moths after the start of the