Test Strategy Form by dfhercbml

VIEWS: 16 PAGES: 2

									                                                   Software Development Testing
                                                                    2 - Test Script Form
The purpose of this form is to identify:
 a). all the different functions of a business process
 b). all possible test cases for each one of those functions.
 c). test script details – including expected results & actual results

1. IDENTIFICATION:
       Name of Business Process being tested:
                                Functional Unit Owner:
                                     Table Created by:
                                   Date Table Created:
                                   Last Revision Date:
                                                   Test ID:


2. IDENTIFY ALL THE SUB-PROCESSES OF THE BUSINESS PROCESS: (ie: Build Full TA awards, ½ TA awards, ¼
   TA awards, ……)
1        Build Full TA awards
2….


3. IDENTIFY ALL POSSIBLE VARIATIONS OF EACH SUB-PROCESS IDENTIFIED IN 2 ABOVE
   AND INCLUDE A LIST OF ALL POSSIBLE CRITERIA FOR EACH ONE:
Function Variation:                    Possible Values:
 Eg:    Full TA – over 1 term                                  Terms: F, W, S Years: 1 – 6 (all invalid for Full TA)
 Eg:    Full TA – over 2 terms                                 Terms: FW, WS, FS Years: 1 – 6 (years 7 -8 invalid)
                                                               Off-cycle Terms: SF, SW, WF Years: 1-6 (years 7 -8 invalid)




4. CREATE A DECISION TABLE FOR EACH SUB-PROCESS IDENTIFIED IN 2 ABOVE.
   ALLOW ONE COLUMN FOR EACH SUB-PROCESS VARIATION IDENTIFIED IN 3 ABOVE.
   Review the possible values for the sub-process variations and eliminate duplicates – ie: those
   that follow the same logical path.
   For example: A Full TA award represents a pre-determined amount of money. The difference between
   a Full TA over 3 years and one over 5 years is the difference between 3 * TA amount and 5 * TA amount.
   All else being equal, only one of these test cases is required.
Build Full TA     Normal cycle (start in F or W - in same funding                Off-cycle (start in S or W – can spill over funding years)
Awards            year)
                  Over 1 Term       Over 2 terms     Over 3 terms     Over 1 term       Over 2 terms    Over 3 terms
# Years = 1                         FW                                                  SF
# Years = 2                         WS
# Years = 3                                                                             SW
# Years = 4                         FS
# Years = 6                                                                             WF
# years = 8                         FW(error)                                           WF(error)

Test Script Form                                                                                                                              1 of 2
July 2007
                                    Software Development Testing
                                                2 - Test Script Form
5. TEST SCRIPT DETAILS:

INSTRUCTIONS: (Enter general testing instructions here)
   1. Enter student id in SZAMADG and click GO
   2. ……..


TESTING SCRIPTS, EXPECTED RESULTS & ACTUAL RESULTS:
Test   Scenario                             Expected Results   Actual Results – if different - &/or
Script                                                         Comments
#
1      Build a Full TA over one term (Fall) Error generated.
       for one year




Test Script Form                                                                                 2 of 2
July 2007

								
To top