Test Strategy Form
Document Sample


Software Development Testing
2 - Test Script Form
The purpose of this form is to identify:
a). all the different functions of a business process
b). all possible test cases for each one of those functions.
c). test script details – including expected results & actual results
1. IDENTIFICATION:
Name of Business Process being tested:
Functional Unit Owner:
Table Created by:
Date Table Created:
Last Revision Date:
Test ID:
2. IDENTIFY ALL THE SUB-PROCESSES OF THE BUSINESS PROCESS: (ie: Build Full TA awards, ½ TA awards, ¼
TA awards, ……)
1 Build Full TA awards
2….
3. IDENTIFY ALL POSSIBLE VARIATIONS OF EACH SUB-PROCESS IDENTIFIED IN 2 ABOVE
AND INCLUDE A LIST OF ALL POSSIBLE CRITERIA FOR EACH ONE:
Function Variation: Possible Values:
Eg: Full TA – over 1 term Terms: F, W, S Years: 1 – 6 (all invalid for Full TA)
Eg: Full TA – over 2 terms Terms: FW, WS, FS Years: 1 – 6 (years 7 -8 invalid)
Off-cycle Terms: SF, SW, WF Years: 1-6 (years 7 -8 invalid)
4. CREATE A DECISION TABLE FOR EACH SUB-PROCESS IDENTIFIED IN 2 ABOVE.
ALLOW ONE COLUMN FOR EACH SUB-PROCESS VARIATION IDENTIFIED IN 3 ABOVE.
Review the possible values for the sub-process variations and eliminate duplicates – ie: those
that follow the same logical path.
For example: A Full TA award represents a pre-determined amount of money. The difference between
a Full TA over 3 years and one over 5 years is the difference between 3 * TA amount and 5 * TA amount.
All else being equal, only one of these test cases is required.
Build Full TA Normal cycle (start in F or W - in same funding Off-cycle (start in S or W – can spill over funding years)
Awards year)
Over 1 Term Over 2 terms Over 3 terms Over 1 term Over 2 terms Over 3 terms
# Years = 1 FW SF
# Years = 2 WS
# Years = 3 SW
# Years = 4 FS
# Years = 6 WF
# years = 8 FW(error) WF(error)
Test Script Form 1 of 2
July 2007
Software Development Testing
2 - Test Script Form
5. TEST SCRIPT DETAILS:
INSTRUCTIONS: (Enter general testing instructions here)
1. Enter student id in SZAMADG and click GO
2. ……..
TESTING SCRIPTS, EXPECTED RESULTS & ACTUAL RESULTS:
Test Scenario Expected Results Actual Results – if different - &/or
Script Comments
#
1 Build a Full TA over one term (Fall) Error generated.
for one year
Test Script Form 2 of 2
July 2007
Get documents about "