office of the executive engineer_

Document Sample
office of the executive engineer_ Powered By Docstoc
					        OFFICE OF THE EXECUTIVE ENGINEER,
           BARRAGE DIVISION, GALUDIH.

           NOTICE INVITING QUOTATION NO. 03/07-08


       Sealed quotation are invited from the manufactures or authorized
Agents/ Dealers for supply of following items at Galudih / Jamshedpur, by
post or personally through the authorized representatives to reach the office
of the Undersigned up to 3 PM on 11/7/07. It will be opened on the same
day at 3.30 PM at Barrage Division, Galudih.
       Questioners or their authorized representatives may remain presents at
the time of opening of quotations.
Sl.No. Name of Items                                             Quantity
1        30 KVA Diesel Genarater Set of approved make (Self 1 No
         start) like Kirolaskar, Greaves cottan etc. for Chief
         Engineer, Chandil Complex, Office, Adityapur,
         Jamshedpur.
2        A.C. 1.5 Ton window type of Standard make like L.G. 3 Nos
         Voltas, etc.
3        A.C. split type 1.5 Ton of standard make like L.G. 1 No.
         Voltas etc.
4        Cooler with moveable stand of standard make like 5 Nos.
         Symphoney, Kenstar etc.
5        Mixture Jucer of standard make                          1 No.
6        Exhaust fan of standard make like Cropton / Usha etc
         6" dia                                                  2 Nos
         9" dia                                                  3 Nos
         18" dia                                                 1 No.

Terms & Conditions.

1.    The above items should be of standard specification and I.S.I. marked.
2.    The rate should be F.O.R. at Jamshedpur for Item No.1 and Galudih
      (East Singhbhum) for Item No. 2 to 6. inclusive of fitting & fixing.
3.    The rate may be inclusive of all taxes or it may be clearly mentioned
      regarding Sales tax / VAT or any other taxes.
4.    The supplier has to install the equipments and demonstrates its
      function.
5.   90% payment will be made after delivery and rest 10 % payment will
     be made after satisfactory Installation and functioning of equipments.
6.   No claims will be entertained regarding loss or damage during
     transportation.
7.   The Undersigned reserves the right to accept or reject any quotation in
     part or whole without assigning any reason there of.



                                                 Executive Engineer,
                                              Barrage Divison, Galudih.

				
DOCUMENT INFO
Shared By:
Categories:
Stats:
views:5
posted:2/27/2010
language:English
pages:2