									Using this template
          Ano provides a suggested structure for your Benefits Realisation Plans. You can complete the sections in
This documentLHC Benefits Realisation Plan
stages as you progress through Benefits Realisation Planning for Programmes, the second of four steps in the
          xyz Integrated Change Programme
Integrated Service Improvement Programme’s (ISIP) recommended approach to strategic planning and benefits
realisation (‘Strategy and Benefits’).
You are advised to: (a) save a copy of the template for       External tools
future reference; (b) switch on the ¶ button on the main      You can create some of the content, especially the
menu while becoming familiar with the template.               summary benefits dependency network diagram and the
The template uses a few basic paragraph styles: standard      benefits links table, in separate PowerPoint and Excel
headings 1 – 2; body text; table text; table headings; body   files.
and table bullets. There are variations in alignment and      In these cases you are recommended to:
colour for specific uses.
                                                                use the separate files to create the content
Guidance notation
                                                                copy the bits you want to include in the plan and
These italics indicate underlying template usage
                                                                 paste special as a picture in the appropriate
‘instructions’ to be read and deleted.
                                                                 locations (indicated by placeholder pictures)
Text in italics like this indicates content guidance, to
be replaced in normal font.                                     maintain the information in the separate file, re-
                                                                 pasting when it changes.
Text like this is intended to suggest part of the
content.                                                      Headers and footers have different styles for portrait
                                                              and landscape pages.
This symbol cross-references the activities described 2.9
in the guidance available at nww.isip.nhs.uk/roadmap          In general, rows in tables are set not to break across
                                                              pages. You will have to allow rows to break across
                                                              pages if you lose text in a table at the bottom of a page.

         ANO

         Local Healthcare Community



         XYZ Integrated Change Programme


         Benefits Realisation Plan


                                                                                          Draft Version 0.01
                                                                                                 dd Mmm yy



         667e5c4a-e8e4-4991-933c-6b6786381291.doc                                                        16-Nov-08
         NHS Integrated Service Improvement Programme:
         Strategy and Benefits Template, Step 2
Ano LHC Benefits Realisation Plan
xyz Integrated Change Programme


Document Control
 Title                Ano Local Healthcare Community
                      Benefits Realisation Plan
                      XYZ Integrated Change Programme

 Author / Editor

 Owner(s)

 File Ref



 Approver                                  Role




                                          Change History

 Version       Date     Author/Editor             Summary of Change




667e5c4a-e8e4-4991-933c-6b6786381291.doc                     i        16-Nov-08
NHS Integrated Service Improvement Programme:
Strategy and Benefits Template, Step 2
Ano LHC Benefits Realisation Plan
xyz Integrated Change Programme


Contents

1     Summary                                               1
1.1   Background                                            1
1.2   Programme Gap Analysis                                1
1.3   Priority Objectives and Outcomes                      1
1.4   Stakeholder Benefits and Measurement                  1
1.5   Projects                                              1
1.6   Benefits Dependency Network                           2

2     Programme Gap Analysis                                3

3     Priority Objectives and Outcomes                      5

4     Stakeholder Benefits                                  6

5     Projects                                              7
5.1   Projects and outcomes                                 7
5.2   Project Mandates                                      7

6     Benefits Measurement Work Packages                    9

7     Benefit Profiles                                     10




667e5c4a-e8e4-4991-933c-6b6786381291.doc        ii   16-Nov-08
NHS Integrated Service Improvement Programme:
Strategy and Benefits Template, Step 2
Ano LHC Benefits Realisation Plan
xyz Integrated Change Programme

1     Summary          2.10

1.1   Background

Optionally include summary information from the LHC Readiness Assessment   Pre-
                                                                           req

1.2   Programme Gap Analysis

Summarise section 2

1.3   Priority Objectives and Outcomes

Summarise section 3

1.4 Stakeholder Benefits and Measurement

Summarise section 4, 6 and 7

1.5 Projects

Summarise section 5




667e5c4a-e8e4-4991-933c-6b6786381291.doc            1                       16-Nov-08
NHS Integrated Service Improvement Programme:
Strategy and Benefits Template, Step 2
Ano LHC Benefits Realisation Plan
xyz Integrated Change Programme

                                                 2.10
1.6   Benefits Dependency Network

Delete placeholder picture below, paste in Benefits Dependency Network from PowerPoint template, then delete this line.

                     1. Integrated Change Programme Benefits Dependency Network


                                               Projects                                                                    Priority
                     Enablers                                          Outcomes                    Benefits
                                           (& Actions to Change)                                                          Objectives

                  1. Enabler
                                            1. Action                                           1. Benefit
                                                                      1. Outcome

                                                                                                                                        2.3
                                            2. Action
                  2. Enabler
                                                                                                                          1. priority
                                                                      2. Outcome                                          objective
                                                                                                2. Benefit
                                            3. Action
                                                                               2.4
                  3. Enabler                     Project
                                                                      3. Outcome


                                            4. Action
                                                                                                3. Benefit   2.5
                  4. Enabler
                                                                      4. Outcome
                                                                                                                          2. priority
                                            5. Action                                                                     objective

                                                 Project
                                                                                                4. Benefit
                  5. Enabler
                                                                      5. Outcome
                                                   2.6
                                            6. Action

                                                 Project



667e5c4a-e8e4-4991-933c-6b6786381291.doc                                       2                                                              16-Nov-08
NHS Integrated Service Improvement Programme:
Strategy and Benefits Template, Step 2
  Ano LHC Benefits Realisation Plan
  xyz Integrated Change Programme

  2      Programme Gap Analysis

  How could the integrated change programme contribute to a patient-led NHS? What does the integrated change programme need to achieve
  within the current planning period?


Care Delivery                                                                                                                                    Rank or
  Principle      LHC vision for the future             Future State                          Current State                      Gap              Priority

1. Health        Copy these from the LHC’s   Describe the desired future state       Describe the current state of   Describe what needs to be   1–9
equality         ISI Plan.                   of the capabilities associated          the capabilities associated     done to close the gap
across                                       with the integrated change              with the integrated change      between the current and     or
populations                                  programme with respect to the           programme with respect to       future states.
                                             current planning period.                the current planning period.                                H/M/L

                                                                      2.2                                                                        or

                                                                                                                                                 RAG

2. Support
individual
wellbeing                                                                                                                                         2.3
3. Care
provided in
the right
setting

4.
Appropriate
access and
choice for all




  667e5c4a-e8e4-4991-933c-6b6786381291.doc                                       3                                                                    16-Nov-08
  NHS Integrated Service Improvement Programme:
  Strategy and Benefits Template, Step 2
 Ano LHC Benefits Realisation Plan
 xyz Integrated Change Programme

Care Delivery                                                                             Rank or
  Principle     LHC vision for the future        Future State       Current State   Gap   Priority

5. Timely,
convenient
and
responsive
services

6. High
quality
clinical
outcomes

7. Optimise
workforce
capacity and
capability

8. Efficient
and effective
delivery of
services

9. Financial
balance
across the
local health
economy




 667e5c4a-e8e4-4991-933c-6b6786381291.doc                       4                            16-Nov-08
 NHS Integrated Service Improvement Programme:
 Strategy and Benefits Template, Step 2
Ano LHC Benefits Realisation Plan
xyz Integrated Change Programme

3      Priority Objectives and Outcomes

This section describes the priority objectives that the integrated change programme is expected to achieve, and the associated outcomes.
Use the ranked programme gap analysis (above) to define objectives for the integrated change programme. These should clearly relate to the
overall ISI Plan Priority Objectives. Objectives should be SMART (specific, measurable, achievable, realistic and time-bound).


                  Prioritised
Priority             Care
Objectives         Delivery     Priority objectives for the integrated
(from ISI Plan)   Principles    change programme                                 Measures                    Outcomes

The ISI Plan      A label       What are the objectives of this integrated       What measures can be        What measurable outcomes need to occur or
Priority          describing    change programme?                                used to demonstrate         be in place for the integrated change
Objective(s)      the top                                                        that the objective has      programme to achieve its priority
                                A suggested structure for SMART objectives
referred to in    ranking                                                        been achieved?              objective?
                                is:
the Programme     care
                                                                                 If the objective is truly   These might be described in terms of
Mandate.          delivery      verb … metric … population / scope …
                                                                                 SMART, these will be        improved capabilities or, in some cases, as
                  principles    object … from baseline value to target
                                                                                 immediately apparent        deliverables.
                  e.g.          value … timeframe.
                                                                                 (see left).
                  Financial                                                                                  E.g. “a new therapy unit is in place by Q5
                  balance,      E.g. Increase the percentage of adult                                        2006”.
                  Health        patients with non-resistant TB who
                  equality.     completed therapy within 12 months from                                                       2.4
                                80% to 90% by 2006.

                                                                             2.3




667e5c4a-e8e4-4991-933c-6b6786381291.doc                                     5                                                                       16-Nov-08
NHS Integrated Service Improvement Programme:
Strategy and Benefits Template, Step 2
Ano LHC Benefits Realisation Plan
xyz Integrated Change Programme

4      Stakeholder Benefits

Identify the benefits arising from the delivery of each outcome. The set of benefits should be sufficient to achieve demonstrably the priority
objectives of the integrated change programme.
Full details of each benefit are described in the Benefits Profiles section at the end of this document.
Delete the placeholder picture below. Use the spreadsheet template and paste below, and then delete this line.
               Outcome                                                                                                                  Objective                     Stakeholder
                                                       <-- Key (Outcome links)
                                                       1 = primary benefit from this Outcome
                                                       2 = secondary benefit from this Outcome
                                                                                              Key (Objectives links) -->
                                         Benefit Ref


                                                                                               1 = primary / major contribution
                                                                                                              2 = secondary /
                                                       some contribution
     xxx
           xxx
                 xxx
                       xxx
                             xxx
                                   xxx




                                                                                                                                  xxx
                                                                                                                                        xxx
                                                                                                                                              xxx
                                                                                                                                                    xxx
                                                                                                                                                          xxx
                                                                                                                                                                xxx
                                                                                                                                                                      xxx
                                                                                                                                                                            xxx
                                                                                                                                                                                  xxx
                                                                                                                                                                                        xxx
                                                                                                                                                                                              xxx
      1    2     3     4     5     6                   Benefit                                                                    1     2     3     4     5
                                          1
                                          2
                                          3
                                                                                     2.5
                                          4
                                          5
                                          6
                                          7
                                          8
                                          9
                                         10




667e5c4a-e8e4-4991-933c-6b6786381291.doc                                                          6                                                                                       16-Nov-08
NHS Integrated Service Improvement Programme:
Strategy and Benefits Template, Step 2
Ano LHC Benefits Realisation Plan
xyz Integrated Change Programme


5     Projects                    2.6

This section describes the existing and/or new projects that will deliver the outcomes, in
terms of Project Mandates.
The following projects are parts of the integrated change programme:
This table duplicates some information from the more detailed Project Briefs, to provide a
summary view of each project.

5.1   Projects and outcomes

Ref   Project             Outcomes                               Stakeholders

      State the project   What outcomes / products /             Which stakeholders own,
      title.              outputs / deliverables does this       contribute to and experience
                          project deliver?                       impact from the project?




                                 2.8
5.2   Project Mandates

The first table below contains guidance on filling out each of the sections. It is followed by
a blank template which can be populated copied for each project identified above.
                 Xyz Integrated Change Programme – Project Mandate

                 1. Project Title… from list above

Purpose          What does the project contribute to the integrated change programme’s
                 objectives? Express this in terms of the project outcomes (outlined in Section 3).

Actions to       Which Actions to Change does the project carry out (identified from the Benefits
change           Dependency Network or from the Gap Analysis)?

Outcomes and     Which outcomes and products/outputs does this project deliver?
deliverables

Timescale        When is the project expected to deliver its outcomes and products/outputs?

Stakeholders     Which stakeholders own, contribute to and experience impact from the project?
                 Owner:
                 Contributors:
                 Impacted:




667e5c4a-e8e4-4991-933c-6b6786381291.doc                     7                            16-Nov-08
NHS Integrated Service Improvement Programme:
Strategy and Benefits Template, Step 2
Ano LHC Benefits Realisation Plan
xyz Integrated Change Programme


                   Xyz Integrated Change Programme – Project Mandate

                   1. Project Title… from list above

Roles and          Who will do what on the project?
responsibilities   Project Board:
                   Project Manager:
                   Project Team:

Inputs and pre-    What inputs is the project dependent on, in terms of enablers and outputs from
requisites         other projects, programmes and enablers (identified in the Benefits Dependency
                   Network)?

Timescales         What timing expectations and constraints apply to the project?

Assumptions        What assumptions have been made in creating this Project Mandate?




                   Xyz Integrated Change Programme – Project Mandate

                   2. Project Title… from list above

Purpose

Actions to
change

Outcomes and
deliverables

Timescale

Stakeholders       Owner:
                   Contributors:
                   Impacted:

Roles and          Project Board:
responsibilities   Project Manager:
                   Project Team:

Inputs and pre-
requisites

Timescales

Assumptions




667e5c4a-e8e4-4991-933c-6b6786381291.doc                     8                           16-Nov-08
NHS Integrated Service Improvement Programme:
Strategy and Benefits Template, Step 2
Ano LHC Benefits Realisation Plan
xyz Integrated Change Programme


6      Benefits Measurement Work Packages                                        2.7
This section describes how the work to measure benefits will be organised so that the
benefits can be shown to have been realised.
After analysing the benefits and part-completing the benefits profiles, consider combining
the task of measuring several benefits (baselines and actual delivery to target) into a single
Benefits Measurement Work Package, to avoid duplication of effort.
Wherever possible use or exploit the data from existing measurement methods.
Further details (e.g. timing, pre-conditions…) are then documented as part of the
respective benefit profiles.


   Benefits
 Measurement                             Work Package      Measurement
Work Packages            Benefits           Owner            Method             Measurer

Give the Benefits   Which benefits, or   Who is            What type of      Who actually
Measurement         separate measures    responsible for   measurement       does the
Work Package a      associated with a    the work          will be carried   measurement?
name                benefit, will be     package?          out (e.g.
                                                                             Indicate if this
                    measured by this                       extract data
                                                                             is an external
                    work package?                          from standard
                                                                             agency (e.g.
                                                           report,
                                                                             HCC).
                                                           conduct
                                                           process
                                                           review, carry
                                                           out
                                                           stakeholder
                                                           survey)




667e5c4a-e8e4-4991-933c-6b6786381291.doc                   9                              16-Nov-08
NHS Integrated Service Improvement Programme:
Strategy and Benefits Template, Step 2
 Ano LHC Benefits Realisation Plan
 xyz Integrated Change Programme


 7         Benefit Profiles

 A benefit profile is created for each identified benefit. The benefit profile contains a
 complete description of the benefit. If there is a large number of benefits consider using a
 tool (Excel spreadsheet, database etc.) to store and manage the set of benefits profiles. In
 this instance include a summary description for each benefit.
 Ensure there is consistency between the document as a whole and the benefits profiles.
 The first template below contains guidance on filling out each section of the benefit
 profile. It is followed by a blank template which can be copied and populated for each
 benefit above.
                Benefit id                          Created         ddmmyy            Reviewed         ddmmyy
 Benefit
                Benefit Title
 Profile
 Owner                        2.5
                                    Who is responsible for this profile and for achievement of the benefit?
 Benefit Description                Describe the benefit and its context

 Stakeholders                       Which stakeholders benefit?
 Supports Objective(s)              List the Priority Objective(s) to which this benefit contributes
 Related to Outcome(s)              List the Outcome(s) from which this benefit results
 Delivered by Project(s)            List the projects delivering the outcomes                             2.6

 Assumptions                        List the key assumptions that underpin this benefit profile
                       2.10
                                    List the key risks that might impact on the timing and/or value of this
 Risks
                                    benefit

 Benefit Type    Financial             Yes No       Qualitative           Yes / No    Quantitative           Yes / No
2.7      In what
         units and /
                                             Estimated
         or what                                                         Estimated                   How will the
 Unit of                       Baseline      or           Target
         qualitative                                                     prediction    Method        measure be
 Measure                       Value         measured     Value
         terms is                                                        or target                   made?
                                             value
         the benefit
         measured?
 Benefit start date            mmyy          Start measuring      mmyy            Target date        mmyy
                                                               To which benefit measurement work package
 Benefits Measurement Work Package
                                                               does the measurement belong (see Section 6)?

                                       2.7                                                                  Benefit
 Measured     Achievement
                                                                                                            Achieved
 Date of
              What are the findings of the measurement activity?                                            Yes No
 review
 Planned
 next
 review




 667e5c4a-e8e4-4991-933c-6b6786381291.doc                                10                                 16-Nov-08
 NHS Integrated Service Improvement Programme:
 Strategy and Benefits Template, Step 2
Ano LHC Benefits Realisation Plan
xyz Integrated Change Programme


               Benefit id                     Created                Reviewed
Benefit
Profile        Benefit Title
Owner
Benefit Description

Stakeholders
Supports Objective(s)
Related to Outcome(s)
Delivered by Project(s)
Assumptions
Risks

Benefit Type    Financial                     Qualitative            Quantitative
Unit of                     Baseline                Target
                                                                      Method
Measure                     Value                   Value
Benefit start date                     Start measuring            Target date

Benefits Measurement Work Package


                                                                                    Benefit
Measured     Achievement
                                                                                    Achieved




667e5c4a-e8e4-4991-933c-6b6786381291.doc                     11                     16-Nov-08
NHS Integrated Service Improvement Programme:
Strategy and Benefits Template, Step 2

								
To top