Templates

Document Sample
Templates
e8aececb-39f6-463f-8a77-26940fb46a0e.doc



Project Initation Document Type 1

Project Name: MBC Website Redesign Project



Project Reference



Project Category Technology



SRO Mark Wheelton



Project Manager (or Cath White (until 27/03/07)

name of author of this Philippa Dennett (post 27/03/07)

document if different)



Version: 0.03



Date: 06/03/07



Distribution: Website Steering Group

Resources Policy Development Committee



Purpose of this To document the justification for the undertaking of the

document: project, based on the estimated cost of development and

implementation against the risks and anticipated business

benefits and savings to be gained. To define the project, to

form the basis for its management and the assessment of

overall success.



Where appropriate links should be given to any

associated documents and other supporting information







Senior Responsible Owner



Mark Wheelton, Corporate Manager Community and Wellbeing



Project Manager



Cath White (until 27/03/07)

Philippa Dennett (post 27/03/07)



Background to Project



The current website look and feel is old. Technical personnel with minimal web

designer input constructed the site over 7 years ago. In addition there is old and out

of date content that needs removing and the site could benefit from reviewed and

improved navigation. The current front page does not provide much opportunity to

add new links to new features and effectively promote council priorities and services.



1 / 16 15/11/2008

This document template should not be altered or amended without first consulting the Project Support

Office

e8aececb-39f6-463f-8a77-26940fb46a0e.doc

The site has also developed with limited feedback from citizens who actually use the

website.



According to the Better Connected 2006 review of the MBC website, use of search

and navigation dropped from 2, satisfactory in 2005 to 0, no information in 2006 and

the site lacks a clearly identified A-Z. Whilst some of the issues are to do with the

Open Objects Cheshire-wide website search functionality, which are now fixed, the

website has grown over the past few years and a review of the navigation structure is

well overdue.



There are pages on the Council‟s website that are not recognisable as belonging to

the Council in that they do not share the look and feel of the rest of the Council‟s

website e.g. cinema booking facility. This can be confusing for the end user and

detracts from the Council‟s brand and makes the website look unprofessional. In

October 2006 Test Partners conducted an extensive study of the website to form an

assessment of the Council‟s website‟s compliance with the W3C‟s Web Content

Accessibility Guidelines (WCAG). It found that the two third party functionalities, the

Local Plan and the Benefits Calculator do not meet the basic Priority One level of the

guidelines and thus do not comply with the Disability Discrimination Act.



Inconsistent content, look and feel and navigation provides a poor user experience

and presents an unprofessional image of MBC. The results of the Test Partners

assessment on accessibility showed that much of the site met the Web Content

Accessibility Guidelines to Priority One level but there was scope for improvement in

some areas and the website falls a long way short of the Priority Two requirements.

Results from recent Better Connected surveys of Local Authority websites also

indicate much room for improvement.





Project Objectives - these should be SMART and include an outline of how they

will be met





1. To undertake a major redevelopment of the Council‟s web site to deliver a platform for

future development and so that it more closely matches the Council‟s website strategy.

This will involve specifically delivering a new version of the MBC website that:

- contains streamlined, up-to-date content

- has a new look and feel that is consistent across the site

- has improved navigation



2. To bring the site up to date in terms of the latest government standards (including

accessibility standards) for web sites and act on the findings in the report by Test

Partners “Website Accessibility Test for the Macclesfield Borough Council Website”.



3. To improve standards and processes for maintenance of the web site. This will involve

specifically:

3.1 Provision of a template that 3rd party suppliers of online functionalities can use

that is easy to update by MBC and keeps the corporate look and feel of the

website.



3.2 Provision of a corporate style guide for website content.

2 / 16 15/11/2008

This document template should not be altered or amended without first consulting the Project Support

Office

e8aececb-39f6-463f-8a77-26940fb46a0e.doc



3.3 Provision of a corporate library of approved and web-optimised images for

staff to use on the website.





Project Scope



The project scope will be confined to the following:-



- To review then migrate all the relevant existing web site content to the new site via

the Content Management System (CMS).



- To ensure that all relevant existing functionality is transferred to the new site.



- To ensure that adequate training and support is provided for Service Editors.



- To design and implement a new corporate website look and feel to be applied to

all of the Council website, and to incorporate into this design any exceptions to

cope with online functionalities supplied by third party suppliers e.g. online

payments, online planning, Knutsford Studio Cinema, Benefits Calculator, Local

Plan etc.



- To deliver „metadata‟ to meet the latest e-government standards and to be

compatible with the requirements of e-government partners.



- To deliver a more user-friendly navigation mechanism to allow users more readily

to find information.



- To ensure that the site meets the latest accessibility guidelines.



Exclusions - what is not included in project mandate



The project will not be looking for 3rd party functionalities to be fundamentally changed

beyond the look and feel except where the pages do not meet the requirements of the

Priority One Web Content Accessibility Guidelines.





Project Approach



Pre-production stage

This will focus on clarifying user requirements via obtaining feedback from current

website users which will also establish a benchmark for later testing.



A customer user group will be established to refer back to during the implementation

stage



Production stage

Based on the above, work can begin on the following:



Design of the new look and feel

Design of new navigation

3 / 16 15/11/2008

This document template should not be altered or amended without first consulting the Project Support

Office

e8aececb-39f6-463f-8a77-26940fb46a0e.doc

Templates for content in CMS

Infrastructure deployment

Content review

Content migration to the new look and feel

Training and support

Functionality review

Functionality migration to the new look and feel

Testing

Go live of the new site



The project will make use of existing staff resources except in the case of third party

online functionalities in which case the project team will liaise with the supplier.



Project planning and management, including an appropriate project organisation, will be

according to the Congleton and Macclesfield Borough Councils‟ Project Management

Methodology.



Interfaces - with other projects and the outside world



Business Transformation Programme

Customer First Programme

Swift/Inovem Project



Assumptions - which have or may be made



In drawing up the draft project plan it is assumed that adequate staff and time will be

made available to resource the project team.



Constraints



No specific constraints in respect of the project timetable or budget have been provided

to the Project Manager. However, it is expected that the Project Board will manage these

aspects of the project.



It is to be confirmed if Member approval will be required for the revised look and feel.



Project Deliverables / products / outputs



Introduction

The products to be produced during the re-development of the website are summarised

below.



Infrastructure

• Infrastructure specification

• Installed infrastructure

• Implemented security arrangements

• Monitored usage reports



Content Management System

• Specification of requirements for implementation of new look and feel and migration of

content

4 / 16 15/11/2008

This document template should not be altered or amended without first consulting the Project Support

Office

e8aececb-39f6-463f-8a77-26940fb46a0e.doc



Look and Feel

• Overall graphic design

• Layout templates

• Navigation design and templates

Menu hierarchy

Category lists (different ways of naming and grouping services to help local

authorities share resources).

A–Z

Breadcrumb trail (a navigation tool that allows a user to see where the current

page is in relation to the Website‟s hierarchy)

• Defined and implemented accessibility features

Semantic structure

Automated accessibility check

Test Partners check?

E-Gif compliance (sets out the policy standards for e-delivery)



Information/Content

• Meta tag scheme (meta data is information about a document rather than the document

content and helps with searching)

• Meta tag mechanisms

• Category lists

• Defined workflow roles and responsibilities

• Identified Service Drafters and Editors

• Information content structure

• Migrated existing website content

• New website content

• Search facilities – see under functionality



Functionality

• Identified existing functions (online booking, payments etc.)

• Transferred existing functions

• Identified new functionality requirements:-

Forms

Image management

FAQs

Search facilities

Links to back office systems

Other interactivity



• For each item of functionality identified: -

Specification of function

Developed function mechanisms

Implemented/Integrated function



Support

• Requirements

• Implemented support arrangements

• User documentation

• Technical documentation

• Training materials

5 / 16 15/11/2008

This document template should not be altered or amended without first consulting the Project Support

Office

e8aececb-39f6-463f-8a77-26940fb46a0e.doc

• Trained users

• Trained support staff



Management Products

• Project Initiation Document

• Project Plans

• Progress reports

• Exception reports

• Testing plans

• Training plans









6 / 16 15/11/2008

This document template should not be altered or amended without first consulting the Project Support

Office

e8aececb-39f6-463f-8a77-26940fb46a0e.doc

Benefits Expected - - Benefit Analysis Matrix





Benefits Observable Measurable (What) Quantifiable (How) Financial (Result)

1 Customers will be able to - Lower number of - Staff time answering Cost of staffing

find information more easily complaints about complaints Postage cost saving

website - Staff time answering

- Lower number of phone calls

telephone calls following - Increase in customer

use of website satisfaction with website

- Better feedback in - Compare pre and post

customer satisfaction redesign take up

surveys

- More usage of website



2 Content will be relevant, - Number of pages of old, - Compare pre and post More focussed use of

accurate and up-to-date expired content redesign pages of budgets

- Increase in customer expired content

satisfaction with website - Better feedback in

customer satisfaction

surveys

3 Customers will have more - Increase in customer - Better feedback in More focussed use of

confidence in the website satisfaction with website customer satisfaction budgets

- Increase in website surveys

usage - Compare pre and post

redesign website usage

4 The Council will be able to - New initiatives and - No of initiatives and Possible income generation

promote initiatives and services on the front services promoted on

services on the front page page the front page pre and

- Take up of new post redesign

initiatives - Compare pre and post

redesign take up



7 / 16 15/11/2008

This document template should not be altered or amended without first consulting the Project Support Office

e8aececb-39f6-463f-8a77-26940fb46a0e.doc



Benefits Observable Measurable (What) Quantifiable (How) Financial (Result)

5 More customers will choose - The number of emails - Compare pre and post Cost of staffing

to use the MBC website to sent to the Council via redesign volume of Postage cost saving

answer their enquiries the website emails

- Website usage statistics - Compare pre and post

redesign website usage

statistics

6 The Council‟s out-of-hours - Fewer out-of-hours calls - The number of enquiries Cost of not hiring new staff

call centre will be able to will get referred to the passed from the out-of- in the Customer Centre

use the MBC website to Customer Centre hours call centre to the

answer customer enquiries - Increase in customer Customer Centre pre Cost of not having to call

satisfaction with out-of- and post redesign customers back

hours service - The cost of returning

calls

- Availability of Customer

Centre staff for other

work









8 / 16 15/11/2008

This document template should not be altered or amended without first consulting the Project Support Office

e8aececb-39f6-463f-8a77-26940fb46a0e.doc



Benefits Observable Measurable (What) Quantifiable (How) Financial (Result)

7. The website will enable the - Shared services pilots - Number of pilots with Cost of not hiring new staff

planned shared services with Cheshire County Cheshire County to answer telephone and

pilots with Cheshire County Council Council face-to-face enquiries

Council - Number of CCC

enquiries answered by

Customer Centre

- Number of MBC

enquiries answered by

CCC

8. The website will improve its - Better Connected rating - Compare pre and post

score in the Better for MBC website relaunch rating

Connected rankings

9. The website will have a - Implementation of - Number of pages Cost of maintaining

consistent look and feel corporate look and feel without the new look and individual functionalities

which contributes to a more for website feel

professional appearance - Customer satisfaction - Better feedback in More focussed use of

with look and feel customer satisfaction budgets

surveys

10 The look and feel of third - Number of third party - Pre and post redesign Cost of maintaining

party online functionalities functionalities that cost of maintaining individual functionalities

will be easier to maintain require maintaining individual functionalities

individually - Better feedback in

- Customer satisfaction customer satisfaction

with look and feel surveys

11 The website will comply - The requirements met - Compare pre and post Fines avoided through non-

with Priority Two of the following the redesign redesign compliance compliance

requirements of the Web - Visually impaired with WCAG

Content Accessibility customer satisfaction - Better feedback in

Guidelines and thus will with accessibility customer satisfaction

comply with the Disability surveys and/or



9 / 16 15/11/2008

This document template should not be altered or amended without first consulting the Project Support Office

e8aececb-39f6-463f-8a77-26940fb46a0e.doc



Benefits Observable Measurable (What) Quantifiable (How) Financial (Result)



Discrimination Act accessibility testing





12 The website will contain - The number of - Compare pre and post

images of acceptable compliant images on the redesign images

content and quality. website









10 / 16 15/11/2008

This document template should not be altered or amended without first consulting the Project Support Office

e8aececb-39f6-463f-8a77-26940fb46a0e.doc







Quality Expectations / Acceptance Criteria by which products will be considered to

be completed





Each product will have its own quality criteria.



Only the Project Board has authority to sign off products.





Project Tolerances - Cost Time Quality Risk Benefits Scope





The Project Board will define the Project Tolerances to be applied to each stage of the

project. Tolerances will be review at the monthly meeting of the Project Board.





Project Controls – indicate how the project will be controlled





Project planning and management, including an appropriate project organisation, will be

according to the Congleton and Macclesfield Borough Councils‟ Project Management

Methodology.



Frequency of Review

The Project Board will define the frequency at which the progress of the project will be

reviewed. Currently this has been defined as monthly for meetings of the Project Board

and fortnightly for meetings of the Project Team.



Management Reviews

Management Reviews or End Stage Assessments will be related to significant events

during the life of the project to commit resources and to authorise progress. It is expected

that the Project Board meetings will perform this function.









11 / 16 15/11/2008

This document template should not be altered or amended without first consulting the Project

Support Office

e8aececb-39f6-463f-8a77-26940fb46a0e.doc





Risks - what major Risks exist which may prevent the project meeting it objective–

include existing risk log if available





The project will require resources from members of the project team but, it may be

difficult to obtain the level of resource input required.



Provision of all potential requirements not possible within available budget.



Significant slippage resulting from poor project definition / planning / management and

the absence of the E-Government Programme Manager from 27/03/07.



Existing web site gets out of date as staff efforts directed at new site



Lack of availability of the MBC website when the new site goes live.









13 / 16 15/11/2008

This document template should not be altered or amended without first consulting the Project

Support Office

e8aececb-39f6-463f-8a77-26940fb46a0e.doc







Plan - outline project plan giving key milestones and activities, and details of the

commitment of resources required. If applicable give an indication of stage

breakdowns



Preproduction 74.5 days Mon 26/02/07 Fri 08/06/07

Project Clarification 7.5 days Mon 26/02/07 Wed 07/03/07

Solution Definition 25 days Wed 07/03/07 Wed 11/04/07

Project Specification 42 days Wed 11/04/07 Fri 08/06/07



Production 79 days Mon 14/05/07 Fri 31/08/07

Content 40 days Mon 14/05/07 Mon 09/07/07

Design & Construction 60 days Fri 08/06/07 Fri 31/08/07

"

Testing, Launch & Handover" 14.5 days Fri 10/08/07 Thu 30/08/07 113









14 / 16 15/11/2008

This document template should not be altered or amended without first consulting the Project

Support Office

e8aececb-39f6-463f-8a77-26940fb46a0e.doc



Stakeholder Analysis





Stakeholder Anti None Let Help Make

Group

Website customers R

Customer Centre staff R

All staff R

Members R

ICT staff R

Out-of-hours call centre R

staff

CWHIC partners R

Service Drafters and R

Editors

Service Managers R







Key

C = Current commitment R = Required commitment

Anti = Stakeholder is against the change.

Let = Stakeholder is neutral, they will allow the change to happen, but have no strong feeling for or against.

None = Stakeholder is passively negative about the change.

Help = Stakeholder understands the benefits and will help facilitate the change.

Make = Stakeholder is actively promoting the change









15 / 16 15/11/2008

This document template should not be altered or amended without first consulting the Project Support Office

e8aececb-39f6-463f-8a77-26940fb46a0e.doc





Project Costs and Budget





At this time it is envisaged that the main cost will be staff time. Specifically:

- Internet and GIS Manager

- Web Developer

- Systems Manager/ Systems Team

- Graphic Design Supervisor/Graphics Team

- Editors and Drafters in service areas

- PR Officer

- Assistant Corporate Programme and Project Manager

- E-Government Programme Manager



Costs may be incurred from 3 rd party suppliers of online functionalities for making

changes to the look and feel of the pages they serve on behalf of MBC. These are not

known at this stage.



Costs will be incurred if we choose to use Test Partners to conduct accessibility testing

on the new design (recommended).





Date of Project Approved









16 / 16 15/11/2008

This document template should not be altered or amended without first consulting the Project

Support Office


Share This Document


Related docs
Other docs by seeme22
Dialog Form Template
Views: 9  |  Downloads: 0
Creating a Website Brief Template
Views: 1784  |  Downloads: 51
Subject Access Request Form Template
Views: 530  |  Downloads: 4
APT Letter Template
Views: 6  |  Downloads: 0
Index of resourcesletter template
Views: 10  |  Downloads: 0
FPS Briefvorlage Letter template
Views: 1  |  Downloads: 0
by registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!