					                                        Bournemouth University
                                                 And
                                       Kingston Maurward College




                               QAA Review of FdSc Equine Studies 2005

                                             Action Plan




                                 July 2006: updated 18 Sept. 2006


                                                 -1-
Equine Action Plan July 2006
        Background

        The FdSc Equine Studies was reviewed by the QAA in April 2005. In September 2005 the draft report
        indicated a judgement of no confidence in academic standards, and confidence in the quality of students’
        learning experience. The final report on the Review has been accepted by the University and is due for
        publication shortly.

        At the time of the QAA Review, the University’s periodic review of the programme was underway; the
        Design and Evaluation phases of the review were delayed to accommodate the QAA review dates.

        Following the QAA Review and indication of the judgement, an action plan was developed to address the
        areas identified for development.

        Actions have been identified in four categories:

                  Actions already in progress at the time of the Review
                  Institutional actions for the University
                  Institutional actions for Kingston Maurward College
                  Programme level actions for PACE and the Programme Team

        The Action Plan

        The Action Plan is in two parts:

        Part 1 identifies Key Actions to raise standards at institutional and programme levels
        Part 2 provides a detailed plan of action at the College and programme level to address the full range of
        areas identified for development in the QAA Review Report. Many of these actions will in practice be
        implemented across all HE programmes at KMC.

        Monitoring

        Progress with addressing the Action Plan will be a standing item on the agendas of PQC, HEAPSC and
        Partnership Board, and the implementation of the plan will be evaluated in the ARPM for the programme.
        ASC will receive annual progress reports through the PACE synoptic report on programme monitoring, and
        interim reports as appropriate.

        Glossary

        The following table identifies key individuals, committees and groups referred to in the Action Plan.

            Key to staff roles                         Abbreviations
            HOQ       Head of Quality, PACE            ADC         Academic Development Committee, BU
            CM        Curriculum Manager, KMC          ADQ         Academic Development & Quality, BU
            DP        Deputy Principal, KMC            ARPM        Annual Report on Programme Monitoring
            EE        External Examiner                ASC         Academic Standards Committee
            EO        Examinations Officer, KMC        BU          Bournemouth University
            HEC       HE Coordinator, KMC              BUPIAT      BU Partners in Administration Team
            LCM       Learning Centre Manager, KMC     FdA OAM     FdA Outdoor Adventure Management
            LT        Link Tutor                       FDF         Foundation Degree Forward
            P         Principal, KMC                   FDQB        Foundation Degree Qualification Benchmark
            PL        Programme Leader, KMC            HEAPSC      HE Academic Planning & Standards Committee, KMC
            PSLSD Peripatetic Senior Lecturer (Staff   HoQ         Heads of Quality meeting, BU
                      Development)                     ILO         Intended Learning Outcome
            SAAM      School Academic Administration   ISG         Industry Steering Group
                      Manager                          KMC         Kingston Maurward College
            UL        Unit Leader, KMC                 LLN         Lifelong Learning Network
                                                       PACE        Partnerships, Access & Community Education, BU
                                                       PTM         Programme Team Meeting
                                                       SDSG        Staff Development Steering Group, BU
                                                       SED         Self Evaluation Document
                                                       SQC         School Quality Committee, BU
                                                       SSC         Sector Skills Council


                                                           -2-
Equine Action Plan July 2006
                               SWLLN   South West Lifelong Learning Network
                               UMR     Unit Monitoring Report




                                -3-
Equine Action Plan July 2006
                                    Bournemouth University: QAA Review of FdSc Equine Studies, Kingston Maurward College
                                                                       ACTION PLAN



     PART 1: Action Plan for submission to QAA: Key Actions to raise standards

Academic Year 2004 - 2005
Actions in progress at time of QAA review
ACTION                                              DEADLINE    TO BE ACTIONED BY                   PROGRESS TO DATE                       MONITORING
                                                                                                                                           FORUM
1 Undertake periodic review of programme, to        September   PACE & Programme       Programme review completed September 05.            Monitoring
include revision of approach to WBL                 2005        team                   WBL integrated across programme. Work               carried forward
                                                                                       Placement incorporated into Horse Husbandry         to 05/06 [1]
                                                                                       Unit. Assessed WBL undertaken within KM
                                                                                       Equestrian Centre
2 Enhance access to relevant staff development      June 2005   BU (PACE & AS)         0.5 Peripatetic Senior Lecturer (Staff           Monitoring
opportunities for staff in PIs                                                         Development) appointed June 2005 to identify PI- carried forward
                                                                                       specific staff development needs and develop     to 05/06 [2]
                                                                                       flexible, mobile programme to address needs.

Academic Year 2005 - 2006
ACTION - Institutional level - BU                   DEADLINE    TO BE ACTIONED BY PROGRESS TO DATE

1 Monitoring and review of approaches to delivery October 2005 ADQ                     Guidance Note QA14 (ARPMs 2004-05) revised          SQCs, ASC
and assessment of WBL in all FDs                                                       to include requirement for specific reflection on
                                                                                       WBL in ARPMs for 2004-05 onwards
2 Staff development workshop on Exam Board          May 2006    PSLSD                  Session developed and scheduled for delivery in     SDSG
management & procedures tailored to the needs of                                       all regional PIs in 05/06
PI staff
3 Staff development workshops on assessment         Ongoing     PSLSD                  Sessions developed and delivered KMC Sept 05        SDSG
design, academic levels and use of marking                                             & Jan 06. Ongoing roll-out to all PIs
criteria tailored to the needs of HE in FE staff
4 Standardise format for assignment briefs,         September   HOQ                    Standard forms piloted KMC 05/06, roll-out to all   ASC via
assignment feedback & moderation in PIs to          2006                               PIs 06/07                                           HoQ/SAAM
incorporate use of generic and specific
assessment criteria
5 Introduce standard three week return policy on    September   Schools, PACE, PIs  05/06 transitional year, interim report July 2006,     ASC
all assignments                                     2006                            full implementation 06/07
6 Involvement of employers in design and delivery   Ongoing     ADQ, Schools, PACE, Recommendation by ADQ that PI programme                ADQ via
of FDs                                                          Programme teams     teams include representatives from industrial          annual review

                                                                                 -4-
     Equine Action Plan July 2006
                                                                                         liaison panels as members of team for periodic       of Validations
                                                                                         review                                               and Periodic
                                                                                                                                              Reviews
ACTION -Institutional level – KMC

7 Introduce new assignment procedures for all HE Pilot by July     HEC, PL, UL, EO       Assessment working group formed October 2005. HEAPSC
programmes: FdSc Equine Sports & Management 2006                                         Pilot launched March 2006
team to pilot these                                Launch all
                                                   programmes                            Eq team produced own IV forms pending awaiting
                                                   06/07                                 BU forms
8 Develop existing Peer Observation of Teaching Pilot by July                            Pilot underway                                 HEAPSC
scheme to incorporate HE level evaluation criteria 2006
9 Establish communication flow with SSC (Lantra) July 2006         DP & CMs              HEAPSC                                               underway
10 Seek short term liaison role to work with land- September       DP                    TRussell taking over liaison role                    HEAPSC
based employers and SSCs to raise awareness of 2006
FDs
11 Establish Cross-College Higher Level Industry July 2007         DP, CMs, HEC          SMT to discuss – link to Prizegiving?                HEAPSC
Steering Group

ACTION -Programme level – KMC

12 Establish assignment setting programme team September                                 Done                                                 Report to
meeting with LTs to review and develop          2006                                                                                          HEAPSC
appropriate assignments. Seek specific feedback
from EE on integration of theory & practice
13 Establish Exam Paper Sub Board to review all January 2007 PL, ULs, LTs, HEC           Meeting scheduled for January 2007                   Report to
exam papers prior to submission to EE                        HOQ                         Regular contact made with HM, JW, JHB. All           HEAPSC
                                                                                         exam papers now agreed and with examinations
                                                                                         officer
                                                                                         (July 06) – done and working well
14 Staff development on assignment feedback,          July 2006    All team, HOQ, HEC,   Staff development session on assignment setting,     ASC via HoQ,
introduction of standard feedback form,                            LTs                   marking and feedback Jan 2006, to be repeated        PQC, EE
introduction of standard moderation form                                                 for Equine team May 2006; standard feedback          reports
                                                                                         form developed and piloted; moderation form
                                                                                         awaiting approval, to be piloted April – June 2006
                                                                                         Staff Dev Week session held 13 July 06
15 Develop enhanced WBL Guidance Pack to              April 2006   PL, CMs               Done. Covering letter with attachments               HEAPSC
provide greater clarity for employers taking on                                          developed.                                           TDH/DK to
FdSc placement students                                                                  Developed own guidance; standardised approach        monitor
                                                                                         to be adopted.
                                                                                         Guidance pack sought from another college
16 Placement visits to all students to assess level   June 2006    PL                    Schedule in place to see all placements.             HEAPSC
& effectiveness of placements

                                                                                  -5-
     Equine Action Plan July 2006
PART 2: Operational Plan: detailed actions and monitoring

No.   QAA Areas for            Outcomes               Timescale/           Person responsible    Monitoring          Person responsible   Resource           Progress update:
      Development                                     milestones           for implementation    arrangements &      for monitoring       implications       20 September 06
      Actions and                                                                                documentation       arrangements
      priority level
EMPLOYER INVOLVEMENT
1.    An increase in the direct involvement of employers in the design and development of the programme.
1.1   Develop the use of                                                                         HEAPSC to receive   DP                   Staff time
      the Equine Industry                                                                        minutes
      Liaison Group:                                                                                                                      Costs of holding   15 05 06
       set date of next       Meeting held and       31 May 06            Equine CM                                                      meeting
         meeting for           formally minuted,
         Equine Group          with HE included on                                                                                                           Done
       formally minute all    agenda
         meetings                                                                                                                                            Done
       agendas to
         include HE
       presentation at                                                                                                                                      This will be done
         next meeting on
         FDs/HE                                                                                                                                              2 a year now
       review remit of        Remit: frequency of    31 March 06: draft   Equine CM, PL                                                                     agreed. Next
         group and             mtgs established       remit, membership                                                                                      meeting Monday 4
         frequency of          e.g. at least 2x per   list & paperwork                                                                                       Dec 2006
         meetings              year – steering        produced
       establish formal       group model, with                                                                                                             List in place
         membership list –     smaller groups
         to include PL         feeding in as
       change name to         required                                                                                                                      Done
         Industry Steering
         Group

      Priority: HIGH
1.2   Develop                  New KM System for      31 May 06            DP, CMs               KM Systems, CMs     DP                   Staff time
      standardised             Industry Steering                                                 Meeting                                                     Done
      paperwork for            Groups created, to
      Industry Steering        include remit,
      Groups: agendas          standard agenda
      with standard items,     and template for
      minutes, remits,         minutes
      memberships

      Priority: medium

                                                                                           -6-
Equine Action Plan July 2006
No.   QAA Areas for            Outcomes                Timescale/              Person responsible    Monitoring              Person responsible   Resource         Progress update:
      Development                                      milestones              for implementation    arrangements &          for monitoring       implications     20 September 06
      Actions and                                                                                    documentation           arrangements
      priority level
1.3   Establish clear          Minutes received by     0607 Acad year          DP                    HEAPSC, ARPM            DP, HOQ              Staff time       Actions reviewed.
      pathway for              HEAPSC                  onwards                                       process.                                                      Will be contained in
      outcomes of ISGs to                                                                                                                                          ARPM.
      be taken forward         Actions reviewed        Oct 06                  PL                    HEAPS gendas &
                               and incorporated                                                      minutes, ARPM,
      Priority: HIGH           into ARPM action                                                      draft periodic review
                               plans as appropriate;                                                 documentation
                               and SED for 0506
                               periodic review
1.4   Identify ways of         Industry                End 0607 acad yr        DP, Principal         HEAPSC                  DP                   Staff time       Discussion taken
      involving industry at    contributions                                                                                                                       place with Principal
      a higher level           obtained                Invite industry                                                                                             and Chair of
                                                       partners to                                                                                                 Governors
      Priority: medium                                 graduation Nov 07,                                                                                          SMT to discuss (July
                                                       research conference                                                                                         06) and explore
                                                       Oct 06                                                                                                      further
                                                       (Marketing database
                                                       under development
                                                       for contacts)
1.5   Explore relevant BU      Initially: business,    31 Oct 06 for list of   LCM                   HEAPSC                  DP                   Staff time
      subject contacts         sport, event mgt        contacts to Equine
                               contacts                CM and Business
      Priority: medium                                 Management UL
                                                       (and to FdA OAM
                                                       team)
1.6   Consider short term      Staff in post           End 0506 acad yr        DP, HEC               HEAPSC                  DP                   Staff time       KMC appointed
      liaison role to work                                                                                                                                         additional staff – one
      with land-based                                                                                                                             Staffing costs   of whom has
      employers & SSCs                                                                                                                                             employer remit. TR
      (e.g. Helen Stickland                                                                                                                                        appointed.
      FDF role).

      Priority: medium
1.7   Seek the support of      Staff development       4 Jan 06                HEC, PL               Register of             HEC                  Staff time       Staff development
      Foundation Degree        session to include                                                    attendance                                                    event held for all
      Forward in               FDF role and                                                                                                                        KMC HE staff on
      developing employer      support                                                                                                                             4.1.06: seminar
      links                                                                                                                                                        topics included
      Priority: medium         Maintain contacts       Ongoing                 HEC, DP                                                                             employer
                               with new Regional                                                                                                                   engagement and the
                               Director post holder                                                                                                                role of FD. PlL to
                                                                                                                                                                   cascade to team
1.8   Explore Land-Based       Clear understanding     End 0506 acad yr        Principal             List of dates/details   DP                   Staff time       KMC named on
      LLN                      of the purpose,         and ongoing                                   of meetings attended                                          initial Land-Based

                                                                                               -7-
Equine Action Plan July 2006
No.    QAA Areas for           Outcomes                 Timescale/   Person responsible   Monitoring            Person responsible   Resource       Progress update:
       Development                                      milestones   for implementation   arrangements &        for monitoring       implications   20 September 06
       Actions and                                                                        documentation         arrangements
       priority level
                               function and benefits                                                                                                LLN bid
       Priority: medium        of the Land-Based
                               LLN; active contacts                                                                                                 LANDEX established
                               established
                                                                                                                                                    New association of
                                                                                                                                                    land-based
                                                                                                                                                    principals
                                                                                                                                                    established
1.9    Identify additional     4 new partners           31 Mar 06    Equine CM, PL, DP,   Minutes of meetings   DP                   Staff time     4 new partners
       HE partners in          identified and invited                HEC, ULs                                                                       identified
       industry who may        to join Equine ISG
       contribute to design,
       delivery and            See 1.1
       development of the
       programme, wider
       than BHS alone, to
       reflect different
       areas of
       industry/related
       industries

       Priority: HIGH
1.10   Add a section to Unit   Incorporate              30 Sept 06   HOQ, PL, ULs, HEC    ARPM process          HOQ, HEC, DP         Staff time     Evidence included in
       Monitoring Reports      employer                                                                                                             ARPM process
       for comment on          engagement
       effectiveness of        evidence into UMR
       interaction with
       employers and to        Implement as pilot
       record feedback         scheme for Equine
       from employers on       team & provide
       Unit/Programme – to     feedback to ADQ on
       ensure capture of       usefulness
       informal feedback.
       Keep a record of        Develop KMC              ?            ?                    ?
       industry contacts:      employer feedback
       guest speakers,         form based on
       industry visits: who,   LANDEX model
       when, Unit and topic

       Priority: HIGH
1.11   Invite July 05          Members invited to       31 Oct 06    PL                   Periodic review       HOQ, HEC,DP          Staff time     The next
       external panel          contribute                                                 process & draft                                           Revalidation process
       members to                                                                         documentation                                             is due Spring /
       contribute to future                                                                                                                         summer 07.


                                                                                   -8-
Equine Action Plan July 2006
No.    QAA Areas for           Outcomes              Timescale/        Person responsible    Monitoring           Person responsible   Resource       Progress update:
       Development                                   milestones        for implementation    arrangements &       for monitoring       implications   20 September 06
       Actions and                                                                           documentation        arrangements
       priority level
       programme design                                                                                                                               Invitations to be sent
                                                                                                                                                      to invite panellists.
       Priority: medium
1.12   Identify future panel   Use FDF contacts as   30 Nov 06         HEC, PL               Panel nomination     HOQ, HEC,DP          Staff time     Ongoing.
       members for 0607        appropriate                                                   forms
       Periodic Review

       Priority: medium
1.13   Revise study tour       Arrangements          Sept 05           PL, Programme         Periodic review      HOQ, HEC             Staff time      Study tour made
       arrangements at         amended in revised                      Team                  process & draft                                             a compulsory part
       0405 Periodic           programme                                                     documentation                                               of Equine Industry
       Review                                                                                                                                            Unit, and
                                                                                                                                                         incorporated into
       Priority: HIGH                                                                                                                                    Unit assessment
                                                                                                                                                       All 05 entrants
                                                                                                                                                         informed of study
                                                                                                                                                         tour costs at offer
                                                                                                                                                         stage
1.14   Evaluate                Through UMRs and      30 Sept 06        PL                    ARPM process         HOQ, HEC             Staff time     PK will be including
       effectiveness of        ARPM                                                                                                                   in ARPM
       revised study tour
       arrangements at end
       of first year of new
       programme, and
       identify any changes
       required

       Incorporate any         Revisions to          Easter 07         PL and Programme      Periodic review
       identified changes      Programme and Unit                      Team                  process & draft
       into 0607 Periodic      specifications as                                             documentation
       Review.                 required

       Priority: medium
1.15   Establish               Seek feedback from    Jan 07            PL, Equine CM         Periodic review      DP, HEC              Staff time     DP attended
       communication flow      LANTRA during                                                 process & draft                                          NAPAEO
       with relevant Sector    periodic review to                                            documentation                                            Conference.
       Skills Council          ensure coherence                                                                                                       LANTRA present.
       (LANTRA)                with benchmarks                                                                                                        Contact established

       Priority: medium
WORK BASED LEARNING
2.     The design and implementation of arrangements to induct and train employers in assessment methods and use of criteria.
2.1    At 0405 Periodic        In the revalidated    Sept 05           PL, Programme         Revised Programme    HEC, HOQ             Staff time     Completed Sept 05

                                                                                       -9-
Equine Action Plan July 2006
No.   QAA Areas for            Outcomes             Timescale/            Person responsible       Monitoring            Person responsible   Resource             Progress update:
      Development                                   milestones            for implementation       arrangements &        for monitoring       implications         20 September 06
      Actions and                                                                                  documentation         arrangements
      priority level
      Review, remove the       FdSc Equine Sports                         Team                     and Unit                                                        Done
      use of summative         & Management                                                        Specifications
      employer                 employer                                                            See PK for evidence
      assessment               assessment is no
                               longer used
      Priority: HIGH
2.2   Include awareness        See 3.3              31 May 06             PL                       HEAPSC                DP                   Staff time           Pack done but kept
      of assessment, level                                                                                                                                         at a level that can be
      and methodologies                                                                                                                       Materials for pack   understood by
      in employer WBL                                                                                                                                              employers
      guidance pack

      Priority: HIGH
3.    Placements which provide students with the experience of WBL as intended in the Foundation Degree Qualification Benchmark.
3.1   Revise WBL and           Programme            Sept 05               PL, Programme            Briefing Document     DP, HOQ              Staff time           Completed Sept 05:
      placements               Specification and                          Team                                                                                      WBL mapped and
      arrangements at          Unit Directory                                                                                                                        integrated into
      0405 Periodic            revised                                                                                                                               more Units when
      Review                                                                                                                                                         programme
                                                                                                                                                                     redesigned,
      Priority: HIGH                                                                                                                                                 instead of
                                                                                                                                                                     dedicated WBL
                                                                                                                                                                     Unit
                                                                                                                                                                    Placement
                                                                                                                                                                     arrangements
                                                                                                                                                                     changed and built
                                                                                                                                                                     into Horse
                                                                                                                                                                     Husbandry Unit
3.2   Evaluate                 Evaluation through   30 Sept 05            PL                       ARPM process          HOQ HEC, DP          Staff time           PK will include in
      effectiveness of         ARPM and                                                            HEAPSC                                                          ARPM
      revised WBL              incorporation of                                                    Periodic review
      arrangements at end      necessary actions                                                   process & draft
      of first year of new     into ARPM Action                                                    documentation
      programme, and           Plan and periodic
      devise action plan as    review process
      required
                               Meeting with key
      Priority: medium         staff to evaluate
                               KMC placement
3.3   Provide greater                                                                              HEAPSC                DP                   Staff time           TS has undertaken
      clarity for employers                                                                                                                                        Health & Safety
      taking on FdSc                                                                               Employer pack                                                   checks
      placement students:                                                                                                                     Materials for pack   Pack enforced. Date
       effective              Use relevant         Draft by: 24 Feb 06   PL, Equine CM                                                                            to be set for all visits

                                                                                          - 10 -
Equine Action Plan July 2006
No.   QAA Areas for            Outcomes                Timescale/              Person responsible       Monitoring            Person responsible   Resource          Progress update:
      Development                                      milestones              for implementation       arrangements &        for monitoring       implications      20 September 06
      Actions and                                                                                       documentation         arrangements
      priority level
          employer             sections from FE        To CMs: 2 March 06      DP                                                                                    to be completed
          briefings            pack, plus:             Finalise by: 28 April   PL, Equine CM                                                       Travel expenses   PK will include
       revise employer         assignment brief      06                                                                                                            employer in
          guidance pack,        guidance on                                                                                                                         discussion when on
          referring to           assessment            Issue to employers      PL                                                                                    Placement visits.
          FDQB                   process, level and    during May 06
       WBL                      methodologies                                                                                                                       Team must be
          Coordinator to        FDF employer          Staff development       PL/CM                                                                                 included in Health &
          receive staff          guide on FDs          by 31 May 2006                                                                                                Safety checks
          development on         (also online)                                                                                                                       PL to lead
          FdSc employer
          packs to prepare
          for employer
          briefings at
          placement
          checks

      Placement visits to      Checklist for           Checklist by 31 May     PL, Equine CM,                                                                        PL to lead
      all students (where      placement               06                      HEC                                                                                   PK has schedule of
      possible) to assess      evaluation created,                                                                                                                   visits in place
      level & effectiveness    to include key          Visit all placements    PL
      of placements            questions and           by 30 June 06                                                                                                 Distance issues
                               prompts for staff       PK will have visited                                                                                          (New Zealand
      Priority: HIGH           development             all placements                                                                                                Wales)
ASSESSMENT
4.    Assignments that provide students with the opportunity to demonstrate the integration of academic learning with the acquisition of practical and vocational skills.
4.1   Subject Link Tutor to    ULs and PL to           Start of 0506 acad yr   ULs, PL                  Tracking sheet        HOQ, HEC             Staff time        Done 0506. All
      approve all              submit all briefs to    0607 acad yr                                     signed by LT          TR / CP / HM                           briefs have been
      assignment briefs        LT for approval prior                                                    showing approval of                                          approved by HM
      before issued to         to issue to students                                                     briefs                                                       (emails confirm)
      students                                                                                          Summary sheet
                                                                                                        completed
      Priority: HIGH
4.2   Map ways in which        Incorporate a section   30 Sept 06              HOQ                      ARPM process          HOQ, HEC, DP         Staff time
      staff are integrating    on this topic into                                                       LT report
      theory and practice      UMR
      in teaching
                               Implement as pilot                              HOQ, PL, ULs, HEC
      Priority: HIGH           scheme for Equine
                               team & provide
                               feedback to ADQ on
                               usefulness


                                                                                               - 11 -
Equine Action Plan July 2006
No.   QAA Areas for            Outcomes               Timescale/             Person responsible      Monitoring             Person responsible   Resource            Progress update:
      Development                                     milestones             for implementation      arrangements &         for monitoring       implications        20 September 06
      Actions and                                                                                    documentation          arrangements
      priority level
5.    Greater alignment between unit learning outcomes and assessment criteria.
5.1   Subject Link Tutor to    See 4.1
      approve all
      assignment briefs
      before issued to
      students

      Priority: HIGH
5.2   Staff development        See 8.1                                                                                                           Staff time          HE Staff
                                                                                                                                                                     development is a
      Priority: HIGH                                                                                                                                                 key element of each
                                                                                                                                                                     Staff Development
                                                                                                                                                                     Week
6.    Stricter adherence to the BU procedures for assessment.
6.1   Training for KMC HE      Training session       5 April 06             HEC to organise, all    Register of            DP                   Staff time          Done
      team in Examination      held, run by BU                               KMC HE team to          attendance provided
      Board procedures         Registry and ADQ                              attend                  by Staff Dev Officer
      and assessment           staff
      regulations

      Priority: HIGH
6.2   Introduce new            Assessment working     Oct 05 – check date    HEC, Equine PL, 1x      Examinations           HEC, DP, HOQ         Staff time          Nov 05: procedure
      examination              group formed                                  Equine UL, EO           Flowchart, exam                                                 issued
      procedures for all                                                                             control sheet,                              One blip - when     Feb 06: EE feedback
      HE programmes to         Procedure to include   Issue procedure:       HEC, DP                 process tracking                            second round sent   obtained and Team
      ensure: timely           team meeting to        Nov 05                                         spreadsheet                                 out, TW has not     meeting scheduled
      production of papers     review LT and EE                                                                                                  responded
      and re-sit papers;       feedback and agree     Collate EE and LT      HEC                     HEAPSC
      approval for level       final versions of      feedback: Feb 06:
      and against Unit         papers. Papers
      ILOs; checking and       requiring extensive    Team meeting: Mar      PL, ULs, LT, HEC
      approval of printed      changes to be          06
      papers by ULs            returned to EEs for
                               final approval         EE final approval on   EEs (HEC to
      Priority: HIGH                                  papers returned to     coordinate)
                                                      EEs: 24 Mar 06
6.3   Review operation of      Feedback invited       July 06                HEC                     Examinations           DP, HOQ              Staff time          Procedure shared
      new examinations         from EEs, LTs,                                                        Flowchart, exam                                                 with other Partner
      procedure and            Programme Teams,                                                      control sheet,                                                  Colleges via BUPIAT
      revise as required       HOQ                                                                   process tracking
                                                                                                     spreadsheet, exam                                               Feedback obtained
      Priority: HIGH           Revised flowchart,     Oct 06                                         paper template                                                  at July 06 staff dev
                               control sheet and                                                                                                                     session to identify

                                                                                            - 12 -
Equine Action Plan July 2006
No.   QAA Areas for            Outcomes               Timescale/           Person responsible      Monitoring            Person responsible   Resource            Progress update:
      Development                                     milestones           for implementation      arrangements &        for monitoring       implications        20 September 06
      Actions and                                                                                  documentation         arrangements
      priority level
                               tracking spreadsheet                                                HEAPSC                                                         revisions required
                               produced
6.4   Introduce new            Assessment working     Oct 05               HEC, Equine PL, 1x      HEAPSC,               HEC, DP, HOQ         Staff time          Ongoing.
      assignment               group formed                                Equine UL, EO           Management Liaison
      procedures for all                                                                           Meetings                                                       New HE
      HE programmes.           Pilot assignment       Procedure launched   HEC                     Procedure                                                      Administrator
                               procedure and          for all programmes                           documentation                                                  appointed
      Priority: HIGH           tracking mechanism     for 0607 acad yr
                               produced                                    HEC, PL, ULs



                                                                           HEC
6.5   Improve                  HEC to join new BU     May 05 & ongoing     HEC                     Minutes of meetings   HEC                  Staff time          Ongoing links
      collaboration and        Partners in
      sharing of best          Administration Team
      practice with BU and
      Partner College          Maintain links with    Nov 05 & ongoing     LCM                                           LCM
      colleagues               BU Academic
                               Services
      Priority: medium
                               Membership of ADC      Ongoing              DP                                            DP
7.    Feedback on student work which provides an adequate formative learning function.
7.1   Trial the use of a       Agree use of form at   Dec 05               PL, ULs                 PTMs, (staff)         HEC, HOQ             Printing of forms   Done. PACE
      new Partnerships         Management Liaison                                                  AUE (student)                                                  feedback forms in
      assignment               Meeting for all HE                                                                                                                 use and working well
      feedback form, with      programmes                                                                                                                         Completed 09/06
      launch of finalised
      version in 0607          Phase out use of old   Feb 06               PL, ULs
                               form
      Priority: HIGH
7.2   Staff development        See 8.1                                                                                                        Staff time
      on assignment                                                                                                                                               Completed 09/06
      feedback

      Priority: HIGH
7.3   Design Partnerships      New form designed      Oct 06               HOQ                     PTM                   HOQ                  Staff time          Done
      assignment               and launched                                                        Feedback form
      feedback form for
      use by all Partner
      Colleges

      Priority: medium
7.4   Ensure effective         All work moderated     0506 acad yr and     Subject LT, HEC,        Exam Board            HEC, HOQ             Staff time          Done for 0506 and

                                                                                          - 13 -
Equine Action Plan July 2006
No.   QAA Areas for            Outcomes               Timescale/         Person responsible      Monitoring            Person responsible   Resource             Progress update:
      Development                                     milestones         for implementation      arrangements &        for monitoring       implications         20 September 06
      Actions and                                                                                documentation         arrangements
      priority level
      moderation               according to BU        ongoing            HOQ, PL                 Archive of student                                              ongoing
      procedures and           guidelines, and                                                   work showing LT
      evidence of              evidence provided                                                 signatures
      moderation               on assignment
                               feedback forms
      Priority: HIGH
7.5   Introduce standard       0506 acad year:        0506 acad year     PLs, ULs                Interim report July   PL, HEC, HOQ         Staff time           Policy launched,
      three week return        transitional year –                                               06                                                              assessment
      policy on all            introduced for all                                                                                                                calendar produced
      assignments              programmes, most                                                  Ongoing monitoring                                              according to policy,
                               assignments                                                       from Oct 06                                                     turnaround time
      Priority: HIGH           returned within                                                                                                                   being recorded
                               target, support
                               issues identified

                               0607 acad year: all    Oct 06 onwards
                               assignments
                               returned to students
                               within 3 term weeks
      A review of student assessment practices in order to provide opportunities for students to demonstrate their achievement of the specified standard in their work, and to
8.
      ensure that student work is not generously marked.
8.1   Staff development in     Session on writing     7 Sept 05          HEC to coordinate       EE reports            HOQ                  Staff time           All done
      marking, use of          exam papers and                           Programme team to       Staff Development
      generic assessment       generic assessment                        attend                  Schedules and
      criteria, design of      criteria                                                          attendance lists
      assignment                                                                                 Notes from sessions
      assessment criteria,     Session on             4 Jan 06           PL attended
      examination boards       assignment briefs,
                               levels, feedback and
      Priority: HIGH           marking

                               Session on             April 06           All HE staff
                               examination boards

                               Evaluation of          July 06            All HE staff
                               assessment procs
                               (see 6.3)

                               BU assessment          8 Sept 06          All HE staff
                               conference
8.2   Ensure two EE visits     Mid year visit and     Visit: 22 Mar 06   EEs (PL & HEC to        EE Reports            HOQ, HEC             Staff time
      carried out: mid-year    written report from    Report:            coordinate)             ARPM process                                                    Schedule in place
      and Examination          EE
      Board day

                                                                                        - 14 -
Equine Action Plan July 2006
No.   QAA Areas for            Outcomes              Timescale/            Person responsible     Monitoring          Person responsible   Resource       Progress update:
      Development                                    milestones            for implementation     arrangements &      for monitoring       implications   20 September 06
      Actions and                                                                                 documentation       arrangements
      priority level
                               Examination Board     6 Jul 06              EEs (HEC to
      Priority: HIGH                                                       coordinate)
8.3   Establish mentoring      Arrangements          Sept 05               HOQ, EEs               EE Reports          HOQ                  Staff time     Done 0506 acad yr
      arrangements for         agreed                                                             Evidence from
      new EE to be                                                                                ADQ?                                                    New EE takes over
      mentored by              Both EEs to attend    22 Mar 06, 6 Jul 06   HOQ, EEs                                                                       fully from 0607 acad
      outgoing EE              visits                                                                                                                     yr

      Priority: HIGH
8.4   Programme Team to        All assignments       Throughout 0607       PL, ULs                LT Report           LTs, HOQ, HEC        Staff time     Ongoing
      devise all 06/07         devised as a team,    acad yr               HEC, LTs to support    Assignment briefs                                       PK/HM
      assignments as a         with guidance from                                                 Team comment
      team and ensure all      LTs, led by PL                                                     sheet
      approved by LT and
      EE before issue to       All approved by EE
      students                 before issue

      Priority: HIGH
8.5   Hold Examination         Exam Paper Board      Jan 07                PL, ULs, HEC, HOQ,     Minutes of Exam     HOQ, HEC             Staff time     Exam papers, resit
      Paper Board as a         held, to cover main                         LTs                    Paper Board                                             and model answers
      development of new       and re-sit papers                                                  Exam papers                                             now passed to
      Examinations             plus model answers                          HEC to coordinate                                                              examinations officer
      Procedure, to review                                                 submission of
      papers prior to                                                      papers to EE
      submission to EE

      Priority: HIGH
PROGRAMME DESIGN AND DELIVERY
9.    More encouragement and advice for students on how they might reflect on, and apply, knowledge between the academic and practical sides of the programme.
9.1   Implementation of        Attend BU staff       Nov 05                HEC, Study &           HEAPS               PL, UL               Staff time     All relevant staff
      Personal                 development                                 Research Skills UL                                                             have attended
      Development              workshop on PDP                                                    PDP handbook                                            workshops
      Planning                                                                                                                                            Completed PDP
                               Cascade PDP           Apr 06 and July 06    HEC, Study &                                                                   implemented Oct 06
      Priority: HIGH           information to KMC                          Research Skills UL
                               HE team

                               Map areas of          Mapping: Apr-May      PLs
                               existing good         06
                               practice for all HE
                               programmes and        ARPMs: 30 Sept 06     PLs
                               identify areas for
                               development of        Implement Action      PLs and Programme

                                                                                         - 15 -
Equine Action Plan July 2006
No.   QAA Areas for            Outcomes                Timescale/           Person responsible      Monitoring          Person responsible   Resource            Progress update:
      Development                                      milestones           for implementation      arrangements &      for monitoring       implications        20 September 06
      Actions and                                                                                   documentation       arrangements
      priority level
                               PDP: incorporate        Plans: 06/07 Acad.   Teams
                               into ARPM Action        Yr
                               Plans

                               Launch for all          Oct 06               HEAS, Study &
                               programmes, with                             Research Skills UL
                               feedback form for
                               staff & students

9.2   At 04/05 Periodic        Revised Unit            Sept 05              PL, Programme           Periodic Review     ADQ                  Staff time          Completed Sept 05
      Review, redesign         specifications                               Team                    process             HOQ
      units so as to better                                                                         ARPM Process
      integrate academic
      and vocational
      aspects

      Priority: HIGH
9.3   Evaluate                 Analysis carried out    ARPM: 31 Sept 06     PL                      PACE Quality Ctte   HOQ                  Staff time          PL attended ARPM
      effectiveness of         in ARPM and actions                                                  HEAPSC              DP                                       workshop 5 April 06
      revised Units with       taken forward in        Implementation of    PL, Programme
      respect to the           ARPM Action Plan        Action Plan: 06/07   Team, HEC                                                                            HEC meeting with
      integration of                                   acad yr                                                                                                   ADQ May 06 to plan
      academic and                                                                                                                                               review schedule
      vocational aspects       Implement               Easter 07            PL, Programme           ADQ, HEAPSC         ADQ, HOQ, DP,
                               programme revisions                          Team                                        HEC
      Priority: HIGH           as appropriate at
                               Periodic Review
                               0607


9.4   Create schedule for      Group tutorial          31 Mar 06            PL                      PTM                 HEC                  Staff time          Arrangements to
      group tutorials and      schedule for 05/06                                                                                                                establish for 2006/07
      provide PL with          year analysed                                                                                                                     in place - done
      guidance on topics
      to be covered            Schedule of topics      7 July 06            PL, LTs
                               for 06/07 year
      See 9.1, 9.5             devised re. PDP
                               (see 9.1)
      Priority: HIGH
9.5   Implement more           Identify current        31 Mar 06            LCM                     PTM minutes         PL, DP, LCM          Staff time          LCM holds training
      clearly defined          practices                                                            LCM PTM reports                                              sessions for
      programme of                                                                                  ARPM                                     Cost of producing   students and a
      Library induction and    Identify topics to be   7 July 06            LCM, Study &            List of topics                           handbook            member of lib staff
                                             st
      training for first and   covered for 1 and                            Research Skills Unit    Staff development                                            assigned in a liaison

                                                                                           - 16 -
Equine Action Plan July 2006
No.   QAA Areas for            Outcomes                Timescale/         Person responsible      Monitoring          Person responsible   Resource          Progress update:
      Development                                      milestones         for implementation      arrangements &      for monitoring       implications      20 September 06
      Actions and                                                                                 documentation       arrangements
      priority level
                                nd
      second year              2 year students         Launch Oct 06      Leader                  attendance sheets                                          role. 1:1 support
      students                 e.g. Library                                                                                                                  offered.
                               induction,
      Priority: HIGH           referencing, finding                                                                                                          LCM producing new
                               resources, and                                                                                                                packs/info for
                               devise programme                                                                                                              induction/referencing
                               that integrates with                                                                                                          /website addresses
                               topics covered in
                               Study & Research
                               Skills unit

                               Staff development       0607 acad yr       LCM
                               sessions for all HE
                               staff on how to
                               integrate aspects
                               such as referencing
                               and academic                                                                                                                  All HE staff to attend
                               writing into teaching                                                                                                         – not just
                               and assessment                                                                                                                programme leaders.
                                                                                                                                                             Staff on-line
                               LCM as a member of      Nov 05 onwards     LCM, HEC                                                                           resources training
                               all HE Programme                                                                                                              available as well.
                               Teams established
                               through Programme
                               Team Meetings

                               Conservation            0506 and ongoing   LCM, Study &                                                     BU guides being
                               Sciences academic                          Research Skills Unit                                             used
                               writing guide &                            Leader                                                                             Now in place and
                               online Harvard                                                                                                                working well
                               referencing guide




                                                                                         - 17 -
Equine Action Plan July 2006
No.    QAA Areas for           Outcomes               Timescale/             Person responsible    Monitoring           Person responsible   Resource       Progress update:
       Development                                    milestones             for implementation    arrangements &       for monitoring       implications   20 September 06
       Actions and                                                                                 documentation        arrangements
       priority level




                                                                                                                                                            Autumn 05: School
                                                                                                                                                            of Conservation
                                                                                                                                                            Sciences Academic
                                                                                                                                                            Writing Handbook
                                                                                                                                                            provided to Study &
                                                                                                                                                            Research Skills UL –
GENERAL ACTIONS
10.1   Finalisation of KMC     Feedback obtained      8 Dec 05               DP                    Partnership Board,   DP                   Staff time     Strategy taken to
       HE Strategy 2004-07     from Partnership                                                    HEAPSC                                                   Partnership Board 8
       and Implementation      Board                                                                                                                        Dec 05; KMC staff
       Plan                                                                                                                                                 feedback obtained 4
                               Feedback obtained      Staff development      DP, HEC                                                                        Jan 06
       Priority: medium        from KMC staff         session: 4 Jan 06
                                                                                                                                                            Ac Bd reviewed
                               Strategy revised       28 Apr 06              DP, HEC
                                                                                                                                                            Taken to Staff Dev
                               Strategy approved      HEAPSC: 17 May 06      HEC                                                                            Week session for
                               by HEAPSC and          Ptnr Board: 6 Jun 06   DP, HEC                                                                        discussion (13 July
                               Partnership Board                                                                                                            06)
10.2   Compile reflective      Notes highlighting     Ongoing                All                   HEAPSC               DP
       notes on the overall    lessons learned and
       impact of the QAA       key improvements
       Review process on       made, as a means to
       HE at KMC, how it       enable staff to draw
       has been dealt with     positive reflections
       and how the             from the process
       situation has been
       turned around

                                                                                          - 18 -
Equine Action Plan July 2006
No.    QAA Areas for           Outcomes             Timescale/   Person responsible    Monitoring             Person responsible   Resource       Progress update:
       Development                                  milestones   for implementation    arrangements &         for monitoring       implications   20 September 06
       Actions and                                                                     documentation          arrangements
       priority level

       Priority: low
10.3   Ensure active           All team members     Ongoing      All                   Action Plan progress   DP, HOQ              Staff time     On-going
       engagement of           contribute to the                                       reports
       whole team (KMC &       implementation of
       BU) in                  the action plan
       implementation of
       action plan

       Priority: HIGH
10.4   Develop existing        PACE pilot scheme    July 06      PACE                  HEAPSC                 DP, HOQ              Staff time     External
       Peer Observation of                                                                                                                        observations in
       Teaching scheme to      Review of KMC        July 06      DP                                                                               place
       incorporate HE level    practices
       evaluation criteria
                               Revised scheme in    Oct 06       DP
       Priority: HIGH          place
10.5   Need to include         Work together to     ongoing      DP                    To monitor more        DP                   Staff time     Produce a Flowchart
       Curriculum              formalise existing                                      rigorously                                                 to help monitor the
       Managers in             procedures                                                                                                         position
       discussions




                                                                              - 19 -