3.5 Requirements Checklist

Instructions
Use the "Requirements Checklist" worksheet to narrow down which option best suits the organization's needs.

Category 1a
Top 10 Requirements: Enter the top 10 most important features or requirements for which you will be scoring the options. Give each
feature an appropriate weight (i.e. 10%), with all 10 requirement weights equaling 100%. Enter a score of 0 - 10 for each requirement
based on the solution's ability to fulfill that requirement (0 being not available, 10 being excellent). Add a comment for an y option and
requirement as needed.

Weighted Top 10 Requirements: This is the score for each option for the Top 10 Requirements Category.

1a Score This is the weighted score for 1a. Assign a percentage value to the importance of Top 10 Requirements in relation to Category 1
overall (so that 1a + 1b = 100%).

Overall Comments: Add any comments about the Top 10 Requirements for each Option.

Category 1b
Critical Features: enter the Critical Requirements that are important for your organization. If you have more critical features than are
listed here, insert more rows. Under the "Score" column, score each option from 0 to 4 (0 being unsupported, 4 being well sup ported) for
how well each solution supports the requirement. The "Critical Features" row will tally the score for each option.

1b Score This is the weighted score for 1b. Assign a percentage value to the importance of Critical Features in relation to Category 1
overall (so that 1a + 1b = 100%).

Total Requirements: This number is calculated by adding the "1a Weight" to the "1b Weight".

Requirements Importance: Assign a percentage value to the importance of Requirements in your evaluation. This number, plus "Cost
Importance", "Risk Importance", and "Intangibles Importance" must equal 100%. The Total score of Category 1 is tallied here.

Category 2
Project Cost: Enter all of the costs associated with each option. If you require different categories than those listed here, change or ins ert
rows as needed. Some options will have different costs associated with them, so ensure that you include them all in the "Proj ect Cost"
column.

Total Project Cost: This is the sum of all of the costs for each option.

Budget: Enter the estimated or desired budget cap for this project. Each Option will be scored using the formula (Budget - Total Project
Cost)/Budget.

Cost Importance: Assign a percentage value to the importance of Cost in your evaluation. This number, plus "Requirements Importance",
"Risk Importance", and "Intangibles Importance" must equal 100%. The Total score of Category 2 is tallied here.

Category 3
Project Risk: Enter all of the risks involved in the project. If you require different risks, change or insert rows as needed. Assign an
appropriate weight to each risk, with all risk weights totaling 100%. For each Option, assign a score from 0 - 10 for each risk listed, where
10 is a very favorable risk (very low or no risk) and 0 is a very unfavorable risk (very high risk). For each option, add a c omment to the risk
as required.

Weighted Project Risk: This is the score for each option for the Project Risk Category.

Risk Importance: Assign a percentage value to the importance of Risk in your evaluation. This number, plus "Requirements Importance",
"Cost Importance", and "Intangibles Importance" must equal 100%. The Total score of Category 3 is tallied here.

Category 4
Intangibles: Enter all of the intangibles involved in the project. If you require different intangibles, change or insert rows as needed.
Assign an appropriate weight to each intangible with all intangible weights totaling 100%. For each Option, assign a score fr om 0 - 10 for
each intangible listed, where 10 is a very favorable intangible score and 0 is a very unfavorable intangible score. For each option, add a
comment to the intangible as required.

Weighted Intangibles: This is the score for each option for the Project Intangibles Category.

Intangibles Importance: Assign a percentage value to the importance of Intangibles in your evaluation. This number, plus "Requirements
Importance", "Cost Importance", and "Risk Importance" must equal 100%. The Total score of Category 4 is tallied here.

Category 5
Total Score: This is the final score for all categories. The option with the highest numerical score is best suited for your project based on
your weights and criteria.