                           RISK ASSESSMENT FORM
Name of Person Completing Assessment                 Prof. T. Jickells, University of East Anglia, Norwich UK

   1 Subject of Assessment

   Deployment and recovery of CTD package




   2 Who is doing the Work

   Ships crew
   Scientists




   3 Cruise Number(s) / Location of Work

   AFI 112/3 Marguerite bay




   4 Brief Description of Activity

   The CTD package consists of a cylindrical steel framework approx. 2m in height and 1.75m in diameter at its largest point. The
   framework supports an array of sensors as well as a variety of water bottle options varying for 10 to 20 litres in capacity.

   The overall weight of the package is approx. 750Kg in air.

   The task involves lifting the package on the CTD cable amidships, moving it over the side then lowering it into the sea on the
   starboard side of the vessel. Recovery is the reverse of this procedure with the additional hazard of increased weight due to
   water collected.

   Total CTD deployments on this cruise should be short, but advanced planning and continuous communication with all parties
   involved needs to be established to insure that deteriorating weather or ice conditions does not adversely effect either the safety
   of those involved in the operation or the vessel itself.

   5 Main Equipment Used

   Vessels winch and hydraulic systems
   CTD package
   ‘A’ frame
   Lifejackets
   Life lines
   Sliphooks
   Deck securing system




                                                                                                  RISKFORM Issue 1, 09/01 Page 1 of 6
                             S:\oed\Health & Safety\ Blank Forms & Checklists\Risk Assessment Form

6 Hazard Category(ies) – select all hazards that are applicable
H01       Use of workshop type machinery                            H25      Lone/remote working/Out of hours
H02       Possible entanglement in moving machinery                 H26      Electric shock
H03       Use of hand held/portable power tools                     H27      Fire from ignition sources (including static electricity)
H04       Use of hand/foot operated machine tools                   H28      Explosion
H05       Use of hand tools                                         H29      Contact with molten metals
H06       Handling of glass                                         H30      Use of hydraulic/pneumatic systems
H07       Operation of crane/overhead gantry                        H31      Use of compressed gases
H08       Loads being transported overhead                          H32      Compressed air
H09       Falls of objects from heights                             H33      Work in extremes of temperature
H10       Operation of forklift trucks                              H34      Frostbite/Scalding/Burns
H11       Manoeuvring of heavy loads                                H35      Vibration
H12       Stacking/storing                                          H36      High noise levels
H13       Operation of vehicles                                     H37      Low light levels
H14       Vehicles hitting people                                   H38      Fumes
H15       Manual handling                                           H39      Lack of ventilation
H16       Work with Display Screen Equipment                        H40      Work over/near water, liquids
H17       Office Workstation (computers/printers/ furniture)        H41      Environmental pollution
H18       Repetitive movements                                      H42      Deck operations
H19       Slips/trips/falls of person on same level                 H43      Carrying equipment up gangway
H20       Falls of persons from heights                             H44      Use of small boats
H21       Collapse of structure                                     H45      Use of divers
H22       Sharp objects                                             H46      Working with ship rails lowered
H23       Inexperienced staff involvement                           H47      Near by operations
H24       Violence                                                  H48      Any other foreseeable hazards not already covered



7 Special Hazards
SH01       Use of hazardous chemical substances*1               SH04     Work in confined spaces*2
SH02       Work on any machinery in motion*2                    SH05      Work on live electrical equipment*2

SH03       Hot work (welding/brazing/flame cutting) *2
*1                                                         *2
     Separate COSHH Assessment is required                      Permit to Work System/Work Safety Instruction is required

8 Risk Groups (tick who might be affected by your activities, other than those who are doing the work)
RG01       Cleaners                                                 RG06       Members of the public
RG02       Maintenance staff                                        RG07       Students
RG03       Security                                                 RG08       Ship borne personnel
RG04       Contractors                                              RG09       Pregnant women
RG05       Other members of staff                                   RG10       Staff with disabilities
RG11       Others (give details):
                  PLEASE IDENTIFY THE PRECAUTIONS TO BE PUT IN PLACE IN THE TABLE BELOW

                                                                                                  RISKFORM Issue 1, 09/01 Page 2 of 6
                                        S:\oed\Health & Safety\ Blank Forms & Checklists\Risk Assessment Form
      STAFF WITH MEDICAL OR PHYSICAL CONDITIONS SHOULD ALWAYS DISCUSS THE CONTENTS OF THIS ASSESSMENT AND ANY ADDITIONAL
                      PRECAUTIONS WITH LINE MANAGER OR PROJECT LEADER BEFORE PROCEEDING WITH THE WORK

Assess the Level of Risk                                                                                                                              6.2
                                                   (a)           (b)                              6.1 Existing Control Measures                       Revised               6.3 Further Action
Haz                                              Hazard      Likelihood   Risk Rating                                                                 Risk Level                Necessary
               Description of activities       Consequence                 = (a) x (b)
No.                                                                                        e.g. Training, Protective Devices, existing Work Safety    High
               relating to the hazards                                                           Instructions, existing Risk Assessments, PPE.        Medium                     (Comments)
                      identified               3 Major       3 High       High (6 & 9)                                                                Low
                                               2 Serious     2 Medium     Medium (4)
                                               1 Slight      1 Low        Low (1 to 3)
                                                                          H M L                                                                       H    M L

H07     Use of ships crane and winches for           3           2        H              Competent ships crane and winch operators must                          L     See attached instruction for
H08     lifting CTD during deployment and                                                carry out the task. Person instructing cranes and                             further advice.
H09     recovery. Use of Stern gantry with a                                             winches must also be competent.
        cable under tension.
                                                                                         All personnel involved must wear suitable PPE –
        Failure of wire or slack wire could                                              safety helmets and safety shoes as a minimum.
        cause the load to fall or package to
        drop suddenly leading to possible                                                Exclusion zone to be enforced for non-
        crush injury.                                                                    participating personnel.

        Recovered objects may be damaged                                                 Minimise all lift heights when recovering.
        and parts could fall off when being                                              Ensure accurately the maximum weight and
        lifted.                                                                          possible drag induced load of any object being
                                                                                         recovered.

                                                                                         Wires must be regularly maintained and
                                                                                         lubricated. Ensure wire, lifting points and
                                                                                         shackles are suitable for the task and properly
                                                                                         certificated.

                                                                                         Spooling of wire to be monitored during initial
                                                                                         deployment. Steadying lines to be attached as
                                                                                         necessary.




                                                                                                                                      RISKFORM Issue 1, 08/01 Page 3 of 6
                                                           S:\oed\Health & Safety\ Blank Forms & Checklists\Risk Assessment Form
Assess the Level of Risk                                                                                                                                6.2
                                                   (a)             (b)                              6.1 Existing Control Measures                       Revised               6.3 Further Action
Haz                                              Hazard        Likelihood   Risk Rating                                                                 Risk Level                Necessary
               Description of activities       Consequence                   = (a) x (b)
No.                                                                                          e.g. Training, Protective Devices, existing Work Safety    High
               relating to the hazards                                                             Instructions, existing Risk Assessments, PPE.        Medium                    (Comments)
                      identified               3 Major        3 High        High (6 & 9)                                                                Low
                                               2 Serious      2 Medium      Medium (4)
                                               1 Slight       1 Low         Low (1 to 3)
                                                                            H M L                                                                       H    M L

H14     CTD package moving across the                3             2        H              Before sampling, the CTD package to be secured                          L
        deck due to vessel motion can lead                                                 to deck and the package must be restrained by
        to potential crush injury or package                                               steadying lines until deployment.
        swinging leading to potential for
        indivudual to be struck.                                                           Exclusion zone to be enforced for non-
                                                                                           participating personnel.

                                                                                           All personnel involved must wear suitable PPE –
                                                                                           safety helmets and safety shoes as a minimum.
H11     Manouvering of full CTD bottles              2             2             M         Personnel carrying out the work should have at                          L
H15     into racks, fitting special purpose                                                least basic manual handling training.
        clamps and removing and carrying
        water bottles could lead to manual                                                 Safety boots with steel toecaps must be worn
        handling injuries.                                                                 when carrying out lifting and moving operations.

                                                                                           At least two persons are required to handle
                                                                                           bottles when carrying and fitting clamp brackets.

                                                                                           Samples to be taken when bottles are still on
                                                                                           CTD frame.
H19     There may be obstructions such as            2             2             M         Work floor area to be kept clear in a clean and                         L
        loose items and tools, cables, water                                               tidy state. Loose items and tools should not be
        on deck that could contribute to                                                   kept lying around.
        Slips, Trips or Falls.
                                                                                           Excess water should be removed as soon as
                                                                                           possible.

                                                                                           Non-slip footwear must be worn.




                                                                                                                                        RISKFORM Issue 1, 08/01 Page 4 of 6
                                                           S:\oed\Health & Safety\ Blank Forms & Checklists\Risk Assessment Form
Assess the Level of Risk                                                                                                                                6.2
                                                   (a)             (b)                              6.1 Existing Control Measures                       Revised               6.3 Further Action
Haz                                              Hazard        Likelihood   Risk Rating                                                                 Risk Level                Necessary
               Description of activities       Consequence                   = (a) x (b)
No.                                                                                          e.g. Training, Protective Devices, existing Work Safety    High
               relating to the hazards                                                             Instructions, existing Risk Assessments, PPE.        Medium                     (Comments)
                      identified               3 Major        3 High        High (6 & 9)                                                                Low
                                               2 Serious      2 Medium      Medium (4)
                                               1 Slight       1 Low         Low (1 to 3)
                                                                            H M L                                                                       H    M L

H26     Electrical termination of CTD cable          2             2             M         ONLY trained personnel should undertake the                             L
        could give rise to an electric shock                                               electrical termination.

                                                                                           Cable plug must always be insulated until
                                                                                           connected.

                                                                                           CTD frame must be earthed through cable and a
                                                                                           1A fuse must be installed in the circuit.
H30     Failure of hydraulic equipment               3             2        H              Equipment must be regularly maintained and                              L     See attached instruction for
        could lead to oil spill and/or load                                                serviced. Ensure wire, lifting points and shackles                            further advice.
        dropping if under tension.                                                         are suitable for the task and properly certificated.

                                                                                           Exclusion zone to be enforced for non-
                                                                                           participating personnel.

                                                                                           Operators must be skilled and trained and they
                                                                                           must be familiarised with response to oil spill
                                                                                           procedures.
H31     CTD bottles are pressurised and              2             2             M         Ensure that caps are sitting correctly and the                          L
        hence there is a risk of gas leak                                                  clamp rod nuts are only tightened sufficiently to
        through end cap seals due to either                                                seal end caps.
        caps not seating corrcetly or over
        tightening of clamp tied rods. This                                                Operators must wear safety goggles whilst bottles
        may cause sea water to spray into                                                  are pressurised.
        operator’s eyes.
H33     Adverse weather could cause unit to          2             2             M         Deployment or recovery to be agreed with ships                          L     Everyone involved must be
        swing leading to potential for                                                     staff especially with the Master before                                       extra vigilant, with close
        colllision injury.                                                                 commencing operation.                                                         communication between all
                                                                                                                                                                         involved.
                                                                                           Exclusion zone to be enforced for non-
                                                                                           participating personnel.                                                      See attached instruction for
                                                                                                                                                                         further advice.



                                                                                                                                        RISKFORM Issue 1, 08/01 Page 5 of 6
                                                         S:\oed\Health & Safety\ Blank Forms & Checklists\Risk Assessment Form
Assess the Level of Risk                                                                                                                              6.2
                                                 (a)             (b)                              6.1 Existing Control Measures                       Revised               6.3 Further Action
Haz                                            Hazard        Likelihood   Risk Rating                                                                 Risk Level                Necessary
               Description of activities     Consequence                   = (a) x (b)
No.                                                                                        e.g. Training, Protective Devices, existing Work Safety    High
               relating to the hazards                                                           Instructions, existing Risk Assessments, PPE.        Medium                     (Comments)
                      identified             3 Major        3 High        High (6 & 9)                                                                Low
                                             2 Serious      2 Medium      Medium (4)
                                             1 Slight       1 Low         Low (1 to 3)
                                                                          H M L                                                                       H    M L

H46     Ships rail may be lowered to allow         3             2        H              Gloves, hard hats, life jackets and/or safety lines                           All personnel to be briefed as
        pakage to clear rails leading to                                                 must be worn as prescribed for operating with                                 to the hazards involved and
        potential for man overboard.                                                     ships rail lowered.                                                           allocated tasks to suit their
                                                                                                                                                                       competence.
                                                                                         A recognised line of communication between
                                                                                         ships bridge,aft deck,winches and cranes                                      See attached instruction for
                                                                                         operators are essential. This should be                                       further advice.
                                                                                         established using existing handheld radios, vocal
                                                                                         and manual signalling.




                                                                                                                                      RISKFORM Issue 1, 08/01 Page 6 of 6

				