Projected Flow on Coachella - Devers 230 kV line (generation scheduled

Document Sample
Projected Flow on Coachella - Devers 230 kV line (generation scheduled Powered By Docstoc
					                Projected Flow on Coachella - Devers 230 kV line (generation scheduled to SCE and SDG&E)


     400

                                                                        Coachella-Devers Jan.1, 2002 - Jan. 1, 2003
     350                                                                Normal line rating (pslf)
                                                                        6100 MW @ Hassyampa
                                                                        2340 MW @ Crystal
     300
                                                                        1670 MW @ Imperial Valley and La Rosita
                                                                        All generation combined
     250


     200
MW




     150


     100


     50


      0
           0%        10%       20%       30%       40%       50%       60%         70%              80%     90%       100%

     -50
                Projected Flow on Coachella - Mirage 230 kV line (generation scheduled to SCE and SDG&E)


     400



     350
                                                                         Coachella - Mirage Jan.1, 2002 - Jan. 1, 2003
                                                                         Normal line rating (pslf)
     300
                                                                         6100 MW @ Hassyampa
                                                                         2340 MW @ Crystal
     250                                                                 1670 MW @ Imperial Valley and La Rosita
                                                                         All generation combined

     200
MW




     150



     100



     50



      0
           0%       10%       20%        30%       40%       50%       60%           70%             80%       90%       100%

     -50
                 Projected Flow on El Centro - Imperial Valley 230 kV line (generation scheduled to SCE and
                                                          SDG&E)
     200
                                                                     El Centro - Imperial Valley - Jan.1, 2002 - Jan. 1, 2003
                                                                     Normal line rating (pslf)
                                                                     El Centro xfmr normal rating
                                                                     El Centro xfmr emergency rating
     100
                                                                     6100 MW @ Hassyampa
                                                                     2340 MW @ Crystal
                                                                     1670 MW @ Imperial Valley and La Rosita
                                                                     All generation combined
       0
            0%       10%       20%        30%       40%        50%          60%            70%          80%           90%       100%
MW




     -100




     -200




     -300




     -400
                 Projected Flow on Eldorado - Lugo 500 kV line (generation scheduled to SCE and SDG&E)


     3500


                                                                             Eldorado - Lugo Jan.1, 2002 - Jan. 1, 2003
     3000                                                                    Normal rating SC
                                                                             30 min. rating SC
                                                                             Normal rating conductor
                                                                             6100 MW @ Hassyampa
                                                                             2340 MW @ Crystal
     2500
                                                                             1670 MW @ Imperial Valley and La Rosita
                                                                             All generation combined


     2000
MW




     1500




     1000




     500




       0
            0%       10%       20%       30%       40%       50%       60%        70%          80%          90%           100%
                Projected Flow on Eldorado - Pisgah No. 1 (or No. 2) 230 kV line (generation scheduled to
                                                   SCE and SDG&E)
     300

                                                                         Normal rating conductor
                                                                         Eldorado-Pisgah No.1, Jan. 1, 2002 - Jan. 1, 2003
     250                                                                 6100 MW @ Hassyampa
                                                                         2340 MW @ Crystal
                                                                         1670 MW @ Imperial Valley and La Rosita
                                                                         All generation combined
     200




     150
MW




     100




     50




      0
           0%      10%        20%       30%        40%       50%        60%          70%          80%           90%          100%



     -50
                        Projected Flow East of River (generation scheduled to SCE and SDG&E)


     14000
                                                                           EOR Jan.1, 2002 - Jan. 1, 2003

                                                                           Path rating
     12000
                                                                           6100 MW @ Hassyampa

                                                                           2340 MW @ Crystal

     10000                                                                 1670 MW @ Imperial Valley and La Rosita

                                                                           All generation combined


     8000
MW




     6000




     4000




     2000




        0
             0%   10%         20%       30%      40%       50%       60%          70%          80%          90%      100%
                 Projected Flow on Four Corners - Moenkopi 500 kV line (generation scheduled to SCE and
                                                       SDG&E)
     2500



                                                                       Four Corners - Moenkopi Jan.1, 2002 - Jan. 1, 2003
     2000                                                              Normal rating SC (2002 AZ Security Manual)
                                                                       30 min. rating SC (2002 AZ Security Manual)
                                                                       Normal rating conductor: ?
                                                                       6100 MW @ Hassyampa
                                                                       2340 MW @ Crystal
     1500
                                                                       1670 MW @ Imperial Valley and La Rosita
                                                                       All generation combined
MW




     1000




     500




       0
            0%       10%       20%       30%       40%       50%       60%           70%            80%        90%          100%




     -500
                  Projected Flow on Hassyampa - North Gila 500 kV line (generation scheduled to SCE and
                                                       SDG&E)
     3000
                                                                Hassyampa (Palo Verde)-N. Gila Jan. 1, 2002 - Jan. 1, 2003
                                                                Normal rating SC
                                                                30 min. rating SC
     2500
                                                                Normal rating conductor: Sag-limitation
                                                                6100 MW @ Hassyampa
                                                                2340 MW @ Crystal
     2000                                                       1670 MW @ Imperial Valley and La Rosita
                                                                All generation combined

     1500
MW




     1000



      500



        0
             0%       10%       20%       30%       40%       50%         60%          70%          80%          90%         100%


      -500



     -1000
                 Projected Flow on Imperial Valley - Miguel 500 kV line (generation scheduled to SCE and
                                                         SDG&E)
     3000
                                                                         Imperial Valley - Miguel Jan.1, 2002 - Jan. 1, 2003
                                                                         Normal rating SC
                                                                         30 min. rating SC
     2500                                                                Normal rating conductor
                                                                         6100 MW @ Hassyampa
                                                                         2340 MW @ Crystal
                                                                         1670 MW @ Imperial Valley and La Rosita
     2000
                                                                         All generation combined



     1500
MW




     1000




     500




       0
            0%      10%       20%        30%       40%        50%       60%          70%           80%           90%           100%



     -500
                 Projected Flow on Julian Hinds - Mirage 230 kV line (generation scheduled to SCE and
                                                       SDG&E)
     400



                                                                        Julian Hinds-Mirage Jan.1, 2002 - Jan. 1, 2003
     300                                                                Normal line rating
                                                                        6100 MW @ Hassyampa
                                                                        2340 MW @ Crystal
                                                                        1670 MW @ Imperial Valley and La Rosita
     200                                                                All generation combined
MW




     100




       0
            0%     10%       20%        30%       40%       50%       60%          70%            80%        90%         100%



     -100




     -200
                 Projected Flow on La Rosita - Imperial Valley 230 kV line (generation scheduled to SCE and
                                                          SDG&E)



     200




       0
            0%       10%           20%           30%           40%           50%   60%   70%   80%       90%   100%




     -200
MW




     -400

                    La Rosita - Imperial Valley Jan.1, 2002 - Jan. 1, 2003
                    Normal line rating (pslf)
                    6100 MW @ Hassyampa
     -600
                    2340 MW @ Crystal
                    1670 MW @ Imperial Valley and La Rosita
                    All generation combined

     -800
                 Projected Flow on Liberty - Mead 345 kV line (generation scheduled to SCE and SDG&E)



     1200                                                            Liberty - Mead Jan.1, 2002 - Jan. 1, 2003
                                                                     Normal rating Phase Shifter (2002 AZ Security Manual)
                                                                     30 min. rating Phase Shifter (2002 AZ Security Manual)
     1000                                                            Normal rating conductor (PSLF)
                                                                     6100 MW @ Hassyampa
                                                                     2340 MW @ Crystal
     800
                                                                     1670 MW @ Imperial Valley and La Rosita
                                                                     All generation combined
     600



     400
MW




     200



       0
            0%      10%       20%       30%       40%       50%       60%          70%           80%             90%          100%

     -200



     -400



     -600
                 Projected Flow on Marketplace - Adelanto 500 kV line (generation scheduled to SCE and
                                                       SDG&E)



     5500
                                                                       Normal rating SC (pslf)
                                                                       30 min. rating SC (pslf)
                                                                       Marketplace-Adelanto Jan.1, 2002 - Jan. 1, 2003
     4500                                                              Normal rating conductor (pslf)
                                                                       6100 MW @ Hassyampa
                                                                       2340 MW @ Crystal
                                                                       1670 MW @ Imperial Valley and La Rosita
     3500
                                                                       All generation combined
MW




     2500




     1500




      500



            0%      10%       20%       30%        40%       50%       60%          70%           80%        90%         100%
     -500
                 Projected Flow on McCullough - Victorville No. 2 (or No. 1) 500 kV line (generation scheduled
                                                    to SCE and SDG&E)

     3500
                                                                       Normal rating SC (pslf)
                                                                       30 min. rating SC (pslf)
                                                                       Normal rating conductor (pslf)
     3000
                                                                       McCullough-Victorville No.2, Jan. 1, 2002 - Jan. 1, 2003
                                                                       6100 MW @ Hassyampa
                                                                       2340 MW @ Crystal
     2500
                                                                       1670 MW @ Imperial Valley and La Rosita
                                                                       All generation combined

     2000
MW




     1500




     1000




     500




       0
            0%         10%       20%        30%       40%        50%        60%           70%           80%          90%          100%
                 Projected Flow on Mead - Victorville 287 kV line (generation scheduled to SCE and SDG&E)




     400
                                                                              Mead - Victorville Jan.1, 2002 - Jan. 1, 2003
                                                                              Normal rating conductor
                                                                              6100 MW @ Hassyampa
                                                                              2340 MW @ Crystal
     300
                                                                              1670 MW @ Imperial Valley and La Rosita
                                                                              All generation combined



     200
MW




     100




       0
            0%       10%       20%        30%       40%       50%       60%          70%           80%           90%          100%




     -100
                 Projected flow on Eldorado - Moenkopi 500 kV line (generation scheduled to SCE and
                                                     SDG&E)
     4000
                                                                        Eldorado - Moenkopi Jan.1, 2002 - Jan. 1, 2003
                                                                        Normal rating SC (2002 AZ Security Manual)
     3500                                                               30 min. rating SC (2002 AZ Security Manual)
                                                                        Normal rating conductor (PSLF)
                                                                        6100 MW @ Hassyampa
     3000                                                               2340 MW @ Crystal
                                                                        1670 MW @ Imperial Valley and La Rosita
                                                                        All generation combined
     2500



     2000
MW




     1500



     1000



     500



       0
            0%    10%        20%       30%       40%       50%       60%         70%          80%           90%          100%

     -500
                 Projected Flow on Mohave - Lugo 500 kV line (generation scheduled to SCE and SDG&E)


     3000
                                                                           Normal rating SC
                                                                           30 min. rating SC
                                                                           Mohave-Lugo Jan.1, 2002 - Jan. 1, 2003
     2500                                                                  Normal rating conductor
                                                                           6100 MW @ Hassyampa
                                                                           2340 MW @ Crystal
                                                                           1670 MW @ Imperial Valley and La Rosita
     2000                                                                  All generation combined
MW




     1500




     1000




      500




        0
            0%      10%       20%       30%       40%       50%      60%         70%         80%          90%        100%
                  Projected flow on Navajo-Crystal 500 kV line (generation scheduled to SCE and SDG&E)


     3500
                                                                             Normal rating SC (2002 AZ Security Manual)
                                                                             30 min. rating SC (2002 AZ Security Manual)
     3000                                                                    Navajo-Crystal Jan.1, 2002 - Jan. 1, 2003
                                                                             Normal rating conductor (PSLF)
                                                                             6100 MW @ Hassyampa
     2500                                                                    2340 MW @ Crystal
                                                                             1670 MW @ Imperial Valley and La Rosita
                                                                             All generation combined
     2000


     1500
MW




     1000


      500


        0
             0%       10%       20%       30%      40%       50%       60%          70%          80%          90%          100%

      -500


     -1000
                  Projected Flow on North Gila-Imperial Valley 500 kV line (generation scheduled to SCE and
                                                           SDG&E)
     3000                                                                Normal rating SC
                                                                         30 min. rating SC
                                                                         North Gila-Imperial Valley Jan.1, 2002 - Jan. 1, 2003
                                                                         Normal rating conductor
     2500
                                                                         6100 MW @ Hassyampa
                                                                         2340 MW @ Crystal
                                                                         1670 MW @ Imperial Valley and La Rosita
     2000                                                                All generation combined



     1500
MW




     1000



      500



        0
             0%        10%       20%        30%       40%       50%       60%           70%          80%           90%           100%


      -500



     -1000
                        Projected Flow Path 26 (generation scheduled to SCE and SDG&E)


     5000


                                                                     Path 26 Jan. 1, 2002 - Jan. 1, 2003
     4000
                                                                     Path rating

                                                                     6100 MW @ Hassyampa

     3000                                                            2340 MW @ Crystal

                                                                     1670 MW @ Imperial Valley and La Rosita

                                                                     All generation combined
     2000
MW




     1000



        0
             0%   10%      20%       30%       40%       50%      60%          70%          80%            90%   100%


     -1000



     -2000



     -3000
                 Projected Flow on Palo Verde - Devers 500 kV line (generation scheduled to SCE and SDG&E)


     5000
                                                                            Palo Verde - Devers Jan.1, 2002 - Jan. 1, 2003
                                                                            Normal rating SC
     4500
                                                                            30 min. rating SC
                                                                            Normal rating conductor
     4000
                                                                            6100 MW @ Hassyampa
                                                                            2340 MW @ Crystal
     3500                                                                   1670 MW @ Imperial Valley and La Rosita
                                                                            All generation combined
     3000
MW




     2500


     2000


     1500


     1000


     500


       0
            0%         10%       20%       30%       40%       50%       60%         70%           80%          90%          100%
                  Projected Flow on Perkins-Mead 500 kV line (generation scheduled to SCE and SDG&E)


     3500


     3000
                                                                  Normal rating Phase Shifters (2002 AZ Security Manual)
                                                                  30 min. rating SC (2002 AZ Security Manual)
                                                                  Perkins-Mead Jan.1, 2002 - Jan. 1, 2003
     2500
                                                                  Normal rating conductor (PSLF)
                                                                  6100 MW @ Hassyampa
                                                                  2340 MW @ Crystal
     2000
                                                                  1670 MW @ Imperial Valley and La Rosita
                                                                  All generation combined
     1500
MW




     1000


      500


        0
             0%       10%      20%       30%       40%      50%         60%         70%          80%          90%          100%

      -500


     -1000
                        Projected Flow SCIT (generation scheduled to SCE and SDG&E)


                                                                       SCIT Jan.1, 2002 - Jan. 1, 2003
     21000
                                                                       SCIT rating winter 2002/03
                                                                       SCIT rating summer 2002
                                                                       6100 MW @ Hassyampa
     19000
                                                                       2340 MW @ Crystal
                                                                       1670 MW @ Imperial Valley and La Rosita
     17000                                                             All generation combined
                                                                       850 MW @ High Desert

     15000


     13000
MW




     11000


     9000


     7000


     5000


     3000
             0%   10%     20%       30%      40%       50%       60%          70%          80%         90%       100%
                       Projected Flow South of Lugo (generation scheduled to SCE and SDG&E)


     7000
                                                                           South of Lugo Jan.1, 2002 - Jan. 1, 2003
                                                                           South of Lugo rating (T-144)
                                                                           6100 MW @ Hassyampa
     6000
                                                                           2340 MW @ Crystal
                                                                           1670 MW @ Imperial Valley and La Rosita
                                                                           All generation combined
     5000                                                                  850 MW @ High Desert



     4000
MW




     3000




     2000




     1000




       0
            0%   10%        20%       30%       40%       50%       60%       70%          80%            90%         100%
                 Projected Flow on Tijuana - Miguel 230 kV line (generation scheduled to SCE and SDG&E)


     1200
                                                                          Tijuana-Miguel Jan.1, 2002 - Jan. 1, 2003
                                                                          Normal line rating (pslf)
                                                                          6100 MW @ Hassyampa
     1000                                                                 2340 MW @ Crystal
                                                                          1670 MW @ Imperial Valley and La Rosita
                                                                          All generation combined
      800



      600
MW




      400



      200



        0
            0%        10%       20%       30%       40%       50%       60%        70%          80%          90%      100%


     -200



     -400
                        Projected Flow West of River (generation scheduled to SCE and SDG&E)


     18000
                                                                           WOR Jan.1, 2002 - Jan. 1, 2003

     16000                                                                 Path rating

                                                                           6100 MW @ Hassyampa

     14000                                                                 2340 MW @ Crystal

                                                                           1670 MW @ Imperial Valley and La Rosita

                                                                           All generation combined
     12000



     10000
MW




     8000



     6000



     4000



     2000



        0
             0%   10%         20%       30%       40%      50%       60%         70%          80%           90%      100%