Over the past years, Nour Communications has entered into various
contracts in major telecommunications projects with well-known
industry players such as Lucent Technologies, Ericsson, Motorola,
Nokia, Harris Farinon, and the Saudi Telecommunications Company
(STC).

The general overview of the scopes of work of these contracts and
their brief descriptions are presented hereon. This manifestation
fortifies NOUR Communications position as an experienced and
dependable contracting company in telecommunications industry for
both commercial and government endeavors. This string of projects is
brought about by the cohesive teamwork of Nour’s innovative
management and skilled work force as its most important resources.

                                                                 2
       NOUR COMMUNICATIONS


COMPANIES THAT ENGAGED AND CONTRACTED
NOUR IN VARIOUS TELECOMMUNICATIONS
PROJECTS IN SAUDI ARABIA:

       Company                 Project
A.   Lucent Technologies   :   TEP 6 Project
B.   L.M. Ericsson         :   GSM E4, E5 and E6 Projects
C.   NOKIA                 :   GSM E5 and E6 Projects
D.   Saudi Telecom (STC)   :   GSM E5 and C&I Projects
E.   Motorola              :   PSD Project
F.   Harris Farinon        :   GID and PSD Projects

                                                            3
        NOUR COMMUNICATIONS
   SOPHISTICATED TEST EQUIPMENTS
   Nour Communications has always utilized the state-of-the-art tools
   and test equipments to ensure optimum system performance. From
   survey to integration, the wide range of equipments assists in
   improvement of work quality:
a) Differential GPS Unit: with accuracy of 3m horizontally and less
   than 1m vertically in resolution of coordinates and elevation.
b) SDH Analyzer Set : for STM-1 systems.
c) 2 Mb/s BER Tester : for E1 and T1 interface stability and
   performance assessment.



                                                                  4
        NOUR COMMUNICATIONS
   SOPHISTICATED TEST EQUIPMENTS continued…

d) TEMS Pocket: for GSM Base Station testing and detection of
   cross feeders.
e) Site Master : for locating fault in feeders and VSWR testing.
f) MW Test Set (MTS) : for checking of MW O/P power, received
   signal level and frequency measurement.
g) IFR : for FM and VHF / UHF systems testing.
h) Set of Spectrum Analyzers and Oscilloscopes as well as set of
   tools enough for use of 20 qualified installation teams for rapid
   deployment around the Kingdom.

                                                                   5
       NOUR COMMUNICATIONS
A) Lucent Technologies International, Inc. / AT&T Int’l.
TEP6 Project: From June 1996 to September 2000. Project
   managed by Lucent Technologies; Norconsult was project
   consultant. Contracts for:

1. SITE SURVEY:
   Nour was the only survey contractor of Lucent on its
   Kingdom wide GSM 200K, 300K and 500K projects.
   Total Number of Surveyed Sites in TEP6 = 1, 183 Sites

 Provided with Microwave line of sight (LOS) data between
   prospective GSM locations; recorded any path obstructions
   and measured site elevation (AMSL) using Altimeter and
   Differential GPS.                                      6
       NOUR COMMUNICATIONS
Lucent Technologies continued (TEP6 Site Survey)…
 Ensured that site location was suitable, both demographic
  and geographic, for effective GSM propagation and
  coverage.
 Using state-of-the-art GPS set, recorded the site geographical
  coordinates. Special software and compass to get site
  magnetic bearings and other required path data.
 Using the Spectrum Analyzer set, ensured there was no
  possible interference or signal propagation to affect the
  designated GSM and MW frequency bands.
 GSM survey was based on the mobile coverage RF and MW
  objectives taking up to 3 candidate locations per site.
                                                             7
       NOUR COMMUNICATIONS
   Lucent Technologies continued (TEP6)…

2. SKILLED MANPOWER SUPPLY:
 Supplied Lucent with 21 Teams of Transmission Engineers for
   Testing & Commissioning of GSM transmission network using
   different PDH and SDH equipment such as AT&T Pcom,
   Harris MicroStar, and NERA STM 1 microwave radio sets.

 Supplied Lucent with 33 Teams of Antenna Installers /
   Riggers, under Lucent’s disposal and direct supervision, to
   install GSM antennas and MW dishes of different sizes,
   including varied sizes of feeders, transmission cables, wave
   guides, jumpers, clamps, and related antenna accessories.

                                                           8
       NOUR COMMUNICATIONS
   Lucent Technologies continued (TEP6)…

3. JUNCTION NETWORK:
   Transmission Contract (April 1998 – Nov. 2000). Direct
   contract with Lucent Technologies.
   Completed Sites = 146 Sites
   The Contract called for implementation of:
 Site survey of 146 MW sites; Line-of-site (LOS) survey of
   64 MW hops.
 Complete        design and optimization of MW hops;
   documentation of design and Method of Procedures (MOP)
   prior to site installation.
                                                              9
       NOUR COMMUNICATIONS
   Lucent Technologies continued (TEP6 Junction Network)…

 Indoor installation on 146 sites using NERA SDH STM1 MW
   Radio with Frequency Diversity; 16 hops with Space Diversity.
 Outdoor Installation on 146 sites: different sizes of cross-
   polarized MW dishes and wave guides.
 Hop alignment, equipment testing and commissioning prior to
   site integration into the long-haul MW network.




                                                           10
        NOUR COMMUNICATIONS
B) L.M. Ericsson
   GSM E4 : From March 2000 to December 2001. Direct contract to
   Ericsson; project managed by Ericsson; project consultant was
   Norconsult. Contracts for implementation of:
1. SITE SURVEY / RADIO SITE INVESTIGATION :
   Total Number of Surveyed Sites = 755 Sites
 Site Search/Acquisition Survey.     Survey of up to 3 candidate
  locations of a prospective new GSM Cell Site giving emphasis on
  RF and LOS considerations.
 Change-out Site Survey. To determine the required transmission
  installation and Civil Works for a change out of GSM radio
  equipment, according to on-site Ericsson instructions, prioritizing
  the re-use of existing equipment for transmission, DC power and
  battery back up.
                                                                11
        NOUR COMMUNICATIONS
   L.M. Ericsson continued (GSM E4 Site Survey)…

 Radio Site Investigation.
   Documentation of both existing and planned radio facilities based on
   RSI checklist, floor plan, cable tray, and site lay out drawings, and
   detailed photographs of site and equipments.

 Transmission Survey.
   Comprehensive transmission equipment survey conducted on MSC
   and existing Microwave Sites that were serving as Node Sites in the
   GSM mobile communications network.




                                                                  12
        NOUR COMMUNICATIONS
   L.M. Ericsson continued (GSM E4) …
2. RADIO INSTALLATION: RBS and Transmission.
   Total Number of Completed Sites = 241 Sites
   Contract entailed the following scope of work:
 Change out of Lucent BTS 2000 equipment with Ericsson RBS 2202
   cabinets with TRX radio units and associated elements.
 Replacements and cut over of GSM antennas to effectively provide
   cellular communications in the 900 and 1800 MHz bands.
 Replacements of LDF series feeders, jumpers, cable clamps, and
   other related antenna accessories.



                                                             13
         NOUR COMMUNICATIONS
    L.M. Ericsson continued (GSM E4 Radio Installation)…

 Installation of Transmission Microwave Equipment cabinet
    including cablings.
 Installation of Mini-Link TMR 9202 both indoor and outdoor units.
 Installation of microwave antenna dish and coaxial cable RG-8.
 Alignment of MW hop and 24-hour BER burn test to ensure
    optimum signal gain.
 Installation of batteries and rectifier units (Battery Back Up).
 Cable connections and terminations both outside and inside shelter.


                                                                     14
        NOUR COMMUNICATIONS
    L.M. Ericsson continued (GSM E4) …
3. SITE CIVIL WORK CONSTRUCTION.
   Total Number of Completed Sites = 243 Sites
 MSC / Indoor Room: Site survey for civil engineering; site design;
  construction and installation of raised floor system, FM200 gas
  flooding system, coded security access system, cable tray system,
  other civil, electrical and mechanical works including HVAC; fire
  alarm and detection control, and lighting fixtures; structural steel
  materials and electrical conduits.
 New Green Field Site : Surveys for site acquisition and civil
  engineering; complete site design; excavation & backfill; supply and
  installation of equipment and generator shelters; self-support steel
  tower erection and painting; supply and install gantry between tower
  and shelter; chain link fence; ship and install power generator; other
  civil, electrical and mechanical works like HVAC, lightings, etc.15
        NOUR COMMUNICATIONS
   L.M. Ericsson continued (GSM E4 Civil Work ) …

 New Roof Top Site: Site survey for civil engineering; site design;
   civil construction and installation of equipment shelter (3m x 3m)
   with foundation, cable tray system, antenna support, structural steel
   works including mast, electrical circuits and lighting fixtures; and
   site cleaning and preparation.
 Change Out / TRU Expansion Site: Detailed site surveys; site
   design; existing building analysis; dismantling of Lucent BTS
   equipment; installation of new antenna mounts, shelter erection with
   foundation; and other civil and electromechanical requirements.




                                                                  16
       NOUR COMMUNICATIONS
   L.M. Ericsson

   GSM E5 : From August 2001 up to present. Direct contract to
   STC; Project supervised by Ericsson;        project consultant is
   Norconsult Telematics. Contracts for implementation of:
1. SITE SURVEY

   Total Number of Surveyed GSME5 Sites = 530 Sites
 Site Search/Acquisition Survey.    Survey of up to 3 candidate
   locations of a prospective new GSM Cell Site giving emphasis on
   RF and LOS considerations.



                                                               17
        NOUR COMMUNICATIONS
    L.M. Ericsson continued ( GSM E5 Survey)…


 Change-out Site Survey.
   To determine the required transmission installation and Civil Works
   for a change out of GSM radio equipment, according to on-site
   Ericsson instructions, prioritizing the re-use of existing equipment
   for transmission, DC power and battery back up.
 Site Survey for Civil Engineering.
   Detailed survey of existing sites for equipment upgrade; building or
   tower analysis (comparative study) for loading capacity; survey
   includes electromechanical considerations of increased load capacity
   due to planned additional equipment.


                                                                  18
        NOUR COMMUNICATIONS
    L.M. Ericsson continued (GSM E5) …
2. SITE CIVIL WORK CONSTRUCTION.
   Total Number of Completed Sites = 286 Sites
 MSC / Indoor Room: Site survey for civil engineering; civil design
  FDED preparation; construction and installation of raised floor
  system, FM200 gas flooding system, coded security access system,
  cable tray & trunk system, other civil, electrical and mechanical
  works including HVAC; fire alarm and detection control, and
  lighting fixtures; structural steel materials and electrical conduits.
 New Green Field Site : Surveys for site acquisition and civil
  engineering; civil design FDED preparation; excavation & backfill;
  supply and installation of equipment and generator shelters; self-
  support steel tower erection and painting; supply and install gantry
  between tower and shelter; chain link fence; install power generator;
  other civil, and electromechanical works like HVAC, lightings, etc. 19
        NOUR COMMUNICATIONS
   L.M. Ericsson continued (GSM E5 Civil Work ) …

 New Roof Top Site: Site survey for civil engineering; civil design
   FDED preparation; civil construction and installation of equipment
   shelter (3m x 3m) with foundation, cable tray system, antenna
   support, structural steel works including mast, electrical circuits and
   lighting fixtures; and site cleaning and preparation.
 Change Out / TRU Expansion Site:               Site survey for civil
   engineering; civil design FDED preparation; existing building
   analysis; dismantling of Lucent BTS equipment; installation of new
   antenna mounts and cable ladder, shelter erection with foundation;
   and other civil and electromechanical requirements.



                                                                    20
        NOUR COMMUNICATIONS
   L.M. Ericsson continued (GSM E5) …
3. SUPPLY OF COMPLETE EQUIPMENT SHELTER.
   Total Number of Shelters Delivered = 187 Shelters
 Inside shelter installation of required equipments and accessories
  meeting the approved standards set by STC for GSM environment.
 Completed shelters are being shipped from Nour Warehouse to the
  assigned GSM Cell Site.
 Inside shelter installation includes the following:
  HVAC units, MDB panel, Halon / Fire Alarm Panel set, Security
  Access Control Panel set, battery rack and rectifier units, Tower
  Obstruction Light Control (TOLCO), cable and trunk ladder, door
  closer, required cablings, and inside / outside lighting fixtures.


                                                               21
        NOUR COMMUNICATIONS
   L.M. Ericsson continued (GSM E5) …
4. SUPPLY OF CONTAINERIZED DUAL DIESEL
   GENERATOR
   Total Number of GSM Sites Installed with D. Generators = 89 Sites
 Nour is the sole agent in Saudi Arabia of Germany’s SAB
  containerized dual generator. To date, 100 sets have been sold and 89
  sets installed on GSM Sites not serviced by commercial power.
  Deutz is engine make of the 3-phase, 32.5KVA, 26 KW generator.
 As STC approved power generator for GSM sites, it is installed
  together with accessories within a 30-foot box container providing a
  noise level of 65dB at 10 meter distance.
 Accessories provided with the generators: control panel, starter
  batteries, FM200 fire extinguishing system, 220V and 24VDC
  lights, ventilation, fuel day tank and buried fuel bulk tank.
                                                                  22
        NOUR COMMUNICATIONS
C) NOKIA
   GSM E5 Project : From September 2001 up to present. Direct
   contract to Nokia; project managed by Nokia; project consultant is
   Norconsult Telematics. Contract for implementation of:
   GSM AND TRANSMISSION RADIO INSTALLATION
   Total Number of Completed GSME5 Sites = 204 Sites
 Implementation planning based on site specific and network
   configurations; radio site investigation survey.
 Change out of Lucent BTS equipment with new Nokia Macro
   UltraSite or Micro MetroSite GSM 900/1800 MHz radio including
   antennas, feeders and jumpers; and battery back up unit.


                                                                23
        NOUR COMMUNICATIONS
   NOKIA continued (GSME5 Radio Installation)…

 Installation, testing and commissioning of transmission radio Nokia
   FlexiHopper or MetroHopper, and associated MW antenna.
 Testing, commissioning and integration of all installed equipments.

   GSM E6 Project : Project has just started January 2003 calling for
   approximately 130 sites allocated to Nour for complete radio
   installation.

   Contract entails the same scope of work as that of GSME5 Project.



                                                                 24
        NOUR COMMUNICATIONS
D) Saudi Telecommunications Company (STC)
   GSM R&V / C&I Project (Ph I & Ph II) : From July 2001 up to
   present. Direct contract to STC; Norconsult Telematics is project
   consultant.
   SITE CONSTRUCTION (Civil Work and Telecom)
   Total Number of Completed C&I GSM Sites = 73 Sites
   Contract is for Nour to construct and deliver to STC brand new
   GSM Cell sites, located along roads and villages in the Western
   Region, on a turn-key basis. Complete site construction requires
   both telecom and civil works scope of work as briefly described
   below:
  Civil Work Implementation:
 Site acquisition survey of up to 3 candidates per site;
 Civil engineering survey and site design (FDED) documentation.
                                                               25
         NOUR COMMUNICATIONS
    Saudi Telecom (STC) continued (C&I Project)…
 Site acquisition survey of up to 3 candidates per site.
 Civil engineering survey and site design (FDED) documentation.
 Site preparation, excavation and backfill, foundation preparation.
 Erection of steel tower and equipment shelter.
 Supply, delivery and installation of Dual Generators and fuel tanks.
 Complete civil and electromechanical works such as gantry and
    cable tray system, antenna mounts, HVAC system, cable trenches,
    chain link fence, lighting fixtures, tower painting, concreting, and
    other works.


                                                                   26
        NOUR COMMUNICATIONS
    Saudi Telecom (STC) continued (C&I Project)…
    Telecommunications Implementation:
 Complete BTS 2000 equipment installation including RF accessories
    like TRX radio units, DDF, GSM 900 MHz antennas and feeders,
    internal and external cablings; reconditioning of indoor BTS units.
   Installation of MW transmission equipment using Harris MicroStar
    M7 or ATT Pcom radio units; installation of MW antenna dishes up
    to 2.4m diameter and IF cable RG-8; hop alignment and BER burn
    test to ensure link stability.
   Installation of battery back up DC supply, batteries and rectifier
    units.
   Testing and commissioning of all installed equipments.
   Power up and Integration of site into the GSM network.

                                                                  27
        NOUR COMMUNICATIONS
E) Motorola / NASCO
   Public Security Directorate (PSD) Transmission Project:
   From October 1998 to December 1999. Direct contract with
   Motorola and NASCO.
   Total Number of Completed Sites = 21 Sites
 Contract called for Installation of transmission equipment on
   21 PSD Sites located in Makkah, Jeddah and Taif.
 MW radio used was Alcatel PDH T1 American Standard
 Installation of PSD Monitoring System.
 Transmission documentation of the 21 completed sites.


                                                                  28
        NOUR COMMUNICATIONS
F) Harris Farinon
   GID Transmission Project:
   Direct contract with Harris Farinon for implementation of:
 Transmission network installation using SDH 4T1 “QuadraLink”
  MW radio in the Western Region
 Installation of Omniplex Multiplexer for PTT Line Combining on
  Hand Held and Mobile Radios
 Installation of complete Network Management System for the whole
  West District over RS-232 modems in Taif and Jeddah.
   PSD Transmission Project:
   Direct contract with Harris Farinon for implementation of:
 Setting up of Transmission Network and its Network Management
   System: five (5) sites in Riyadh and three (3) sites in Madinah.
                                                                      29
      NOUR COMMUNICATIONS
            SITE SURVEY & RADIO SITE INVESTIGATION


                       TEP6         GSME4       GSME5
Survey Type            Lucent       Ericsson   STC/Ericsson   Site Total
                     Technologies
Site Search / Site     1,183         100           210          310
   Acquisition

 Transmission             0            28           0            28
 (Microwave)

   Radio Site             0            31           0            31
  Investigation

  Change-out              0           596          320          916
 Site Total            1,183         755           530         2,468


                                                                           30
       NOUR COMMUNICATIONS
                   CIVIL WORK SITE IMPLEMENTATION

                     C&I       GSME4       GSME5
Site Category         STC      Ericsson   STC/Ericsson   Site Total

     MSC               0         15           24            39
 Indoor / Eqpt.        0           9          10            19
    Room
 Roof Top Site         0         138          28           166
New Greenfield        73          43          39            82
TRU Expansion          0          0           100          100
  Change Out           0          0           64            64
Site Dismantling       0         38           21            59
 Site Total           73         243          286          602
                                                                      31
NOUR COMMUNICATIONS
        RADIO INSTALLATION
 ERICSSON RBS & TRANSMISSION RADIO

                     GSME4
        Area/City    Ericsson

         RIYADH       183
         QASSIM         40
         HAFR AL        18
          BATEN

        Site Total    241




                                     32
    NOUR COMMUNICATIONS
               RADIO INSTALLATION
    STC BTS & NOKIA RBS AND TRANSMISSION RADIO


                 C&I          GSME5         GSME6
Western Region   STC           Nokia         Nokia

 Site Totals =     73           204              130




                                                       33
 NOUR COMMUNICATIONS
DUAL DIESEL GENERATORS INSTALLED ON GSM SITES:

            Sold To /       Number of
           Installed by      Gensets
           NOUR (C&I – 1)      11
           NOUR (C&I – 2)      21
              SABV-1           1
              SABV-2           24
              NATEL            4
              MADAF            11
             MOZOON            10
               ACES            5
              HICAP            2
              Total =          89
                                                 34
NOUR COMMUNICATIONS


    END