RANCANGAN MENGAJAR SEMESTER (AMALI) MSK A. Introduction LAB

W
Shared by: qov12652
-
Stats
views:
41
posted:
2/8/2010
language:
Malay
pages:
2
Document Sample
scope of work template
							                              RANCANGAN MENGAJAR SEMESTER (AMALI) 

Nama Pensyarah  Modul:MOHAMAD AZUAN BIN MOHAMED ARSHAD                Sesi Pengajian :JULAI 2007 

Jabatan :  JKE 

Kursus: SIT 1B                            Kod & Nama Modul : F1020 – COMPUTER HARDWARE TECHNOLOGY 

                                                                                                   Catatan 
     Minggu                         Topik dan Sub Topik 
                                                                        Aktiviti Penilaian /    (Perlaksanaan/ 
   ( Tempoh ) 
                              Kuliah/ Makmal/Bengkel/Kerja Luar            Bahan dan             Penangguhan 
                                                                            Peralatan                 dll) 

        1                                  MSK                                                      NEW 
 (9­13/7/2007)                                                                                    STUDENT 
                                                                                                REGISTRATION 


                    A.    Introduction LAB 
       2            Introduction  terminology of Computer Hardware 
 (16­20/7/2007)     Technology 

       3            LAB 1 
 (23­27/7/2007)     COMPUTER’S EXTERNAL UNITS                            LAB SHEET 1 


        4           LAB 2                                                LAB SHEET 2 
                    COMPUTER’S INTERNAL CONNECTORS 
(30/7­ 3/8/2007) 


       5            LAB 3                                                LAB SHEET 3 
                    COMPUTER’S HARD DISK 
 (6­10/8/2007) 


       6                                                                                        SEM. BREAK 
 (13­26/8/2007)                   SEMESTER BREAK 


       8            LAB 4                                                                        MERDEKA 
                    MOTHERBOARD UNITS 
(27­ 31/8/2007)                                                          LAB SHEET 4            DAY 31 OGOS 
                                                                                                    2007 

        9           LAB 5 
                    DISASSEMBLING A COMPUTER 
 (3/9­7/9/2007)                                                          LAB SHEET 5 


       10           LAB 5                                                LAB SHEET 5 
                    DISASSEMBLING A COMPUTER 
 (10­14/9/2007) 



                    LAB  6 
       11         ASSEMBLING A COMPUTER                                  LAB SHEET 6
(17 – 21/9/2007) 
      12             LAB  6                                                                  LAB SHEET  6 
(24­ 28/9/2007)      ASSEMBLING A COMPUTER 



       13         LAB  7                                                                     LAB SHEET  7 
(1/10­5/10/2007)  FORMATTING HARD DISK 

      14 
(8­21/10/2007)                        SEMESTER BREAK                                                                SEM. BREAK 


      16             LAB  7 
(22­26/10/2007)      FORMATTING HARD DISK                                                    LAB SHEET 7 


      17             LAB 8 
    (29/10­           INSTALLING WINDOWS XP                                                  LAB SHEET 8 
  2/11/2007) 


       19         LAB 8 
(12­ 16/11/2007)  INSTALLING WINDOWS XP                                                      LAB SHEET 8 



      20 
(19­23/11/2007)      LAB 9                                                                   LAB SHEET 9 
                     INSTALLING A NEW HARDWARE 

      21             LAB 10 
(26­30/11/2007)      INSTALLING A NEW SOFTWARE                                               LAB SHEET 10 


       22                                 Revision 
 (3­7/12/2007) 

                                                                                                                      DEEPAVALI 
      18                        PROJECT PRESENTATION WEEK                                                             DAY 8 NOV 
(28/5­1/6/2007)                                                                                                         2007 

     23 & 24                                   FINAL EXAM 
(10­ 21/12/2007) 




   ­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­                       ­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­ 
   Tandatangan Pensyarah Modul                                      Tandatangan Pengarah / Timbalan Pengarah / 
   Tarikh :                                                         Ketua Jabatan / Ketua Kursus 
                                                                    Tarikh: 

   PPL­04 (1) (02­01­07)

						
Related docs