JOB 183 EE1385.exl

Document Sample
JOB 183 EE1385.exl Powered By Docstoc
					State of California - Department of Transportation EXTRA WORK BILL (SHORT FORM) Date Performed :d: 03/26/07 WORK PERFORMED BY : Elijah Electric Date of Report : 04/18/07 Cont. Job No.: Contract No. Cont. RPT NO. EE1385 CCO NO.

DESCRIPTION OF WORK: LOCATE BROKEN CONDUIT & BROKEN ELBOWS EQUIPMENT Equip No. TK-12 TR-01 TK-03 EQUIPMENT CLASS/MAKE TRUCK TRAILER TRUCK Code Hours/ Units 4 4 8 Hrly/Dly Rate $20.94 $4.42 $20.94 Delay Factor Extended Amount $83.76 $17.68 $167.52 P.R. No. OPR DAVID RANGEL LBR SALVADOR DEANDA DRIVERJUAN ZUNIGA LABOR

LABORERS, FOREMANS, etc. Hours Reg 8 8 4 O.T. Hourly Rate Reg $50.97 $42.00 $15.00 O.T. Extended Amount

Equipment Sub-Total
MATERIAL and/or WORK done by specialists Description 2" SCH 40 PVC ELBOWS 2"SCH 40 PVC COUPLINGS 2" SCH 40 PVC CONDUIT Units 6 0.12 0.4 Unt Cst 1.49 37.68 49.49

$268.96
Labor Surcharge Total Subsistence Reg. 17%

Sub-Total
O.T. 16%

$8.94 $4.52 $19.80
Travel Expense Other Total Cost of Labor Total Cost of Equipment Total Cost of Material Markup on Labor Cost (22%) Markup on Equipment (15%) $40.34 $4.99 $268.96 $33.26

Material & Specialist Sub-Total

$33.26

Markup on Material (15%)

Total This Report

$347.55

3671b755-6f20-4d5f-b173-dcb4fe17ca07.xlsForce Account Analysis

11/9/20082:10 PM

Sheet1

DATE LAB DRILLER HELPER LABORER DRIL. RIG. TRUCK TRUCK WATER TANK PIPE $35.95 $30.83 $30.83 $100.00 $6.67 $11.61 $2.82 $0.75

10/18/1996 10/21/1996 10/22/1996 10/23/1996 10/24/1996 10/25/1996 10/26/1996 11/2/1996 11/5/1996 11/6/1996 11/7/1996 11/12/1996 10 11 3 3 3 3 3 3 0 8 8 8 8 8 8 6 6 6 6 3 3 3 3 3 3 300 7 7 9.5 9.5 6.5 6.5 10 10

TOTAL 85 86 6 85 11 85 67 6000

EQUIPMENT

10 11 10

8 8

8 8 8 0

8 8 8 0

6 6 6 450

6 6 6 1500

7 7 7 600

9.5 9.5 9.5 0

6.5 6.5 6.5 600

10 10 10 1800

MATERIAL

250

500

Page 2


				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:2
posted:11/9/2008
language:
pages:2