Docstoc

JOB 175 EE1501.exl

Document Sample
JOB 175 EE1501.exl Powered By Docstoc
					State of California - Department of Transportation EXTRA WORK BILL (SHORT FORM) Date Performed :d: 05/07/07 WORK PERFORMED BY : Elijah Electric DESCRIPTION OF WORK: STOOD POLES EQUIPMENT Equip No. TK-07 EQUIPMENT CLASS/MAKE TRUCK Code Hours/ Units 4 Hrly/Dly Rate $19.09 Delay Factor Extended Amount $76.36 P.R. No. LBR ISMAEL AVILA LABOR LABORERS, FOREMANS, etc. Hours Reg 4 O.T. Hourly Rate Reg $44.00 O.T. Extended Amount $176.00 Date of Report : 05/22/07 Cont. Job No.: Contract No. Cont. RPT NO. EE1501 CCO NO.

Equipment Sub-Total
MATERIAL and/or WORK done by specialists Description Units Unt Cst Total

$76.36
Labor Surcharge Subsistence Reg. 17%

Sub-Total
O.T. 16%

$176.00
$29.92

Travel Expense Other Total Cost of Labor Total Cost of Equipment Total Cost of Material Markup on Labor Cost (28%) Markup on Equipment (15%) $57.66 $11.45 $205.92 $76.36

Material & Specialist Sub-Total

Markup on Material (15%)

Total This Report

$351.39

838401b3-0f54-465a-bf94-14bf99a3487b.xlsForce Account Analysis

11/9/20082:09 PM

Sheet1

DATE LAB DRILLER HELPER LABORER DRIL. RIG. TRUCK TRUCK WATER TANK PIPE $35.95 $30.83 $30.83 $100.00 $6.67 $11.61 $2.82 $0.75

10/18/1996 10/21/1996 10/22/1996 10/23/1996 10/24/1996 10/25/1996 10/26/1996 11/2/1996 11/5/1996 11/6/1996 11/7/1996 11/12/1996 10 11 3 3 3 3 3 3 0 8 8 8 8 8 8 6 6 6 6 3 3 3 3 3 3 300 7 7 9.5 9.5 6.5 6.5 10 10

TOTAL 85 86 6 85 11 85 67 6000

EQUIPMENT

10 11 10

8 8

8 8 8 0

8 8 8 0

6 6 6 450

6 6 6 1500

7 7 7 600

9.5 9.5 9.5 0

6.5 6.5 6.5 600

10 10 10 1800

MATERIAL

250

500

Page 2


				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:4
posted:11/9/2008
language:
pages:2