					                                          EASA EASADEK Wet Room Former
                                          FOR WOODEN FLOOR INSTALLATION
                                          IMPORTANT: Tray        heavy, be careful whilst handling. Protect shower base from
                                          damage by using cardboard packaging.

                                          All of the Easadek range of floor former trays can be cut to size using a conventional
                                          hacksaw or stone blade grinder. However it is important that any cut edges are
                                          placed to the wall. It is not possible to place any cut edge to the outside of the tray
                                          where it meets the floor.
                                                                              Method B
                                                                              At A
                                                                          Methodeach end of the tray add purlins (cross-bracing)
|1|                                                                                             Floor Boards
                                                                              between the joists. Then add additional purlins at
                                                                              400mm intervals underneath the tray.
                                                                                                  Floor Boards



                                                      Shower Trays/
                                                      Wet Room-Ea-                                  Platform

                                                      sadek                                          18mm
                                                                                                    Plywood
                                                                                                    Platform
                                                                                                     18mm
                                                                                                    Plywood
                                                                                                     Joists
|1|   Place the tray in position. Mark out the size of the tray
      on the flooring. Cut out floor sheeting or floorboards.
      Check that the tray fits into the opening. The tray                                              Joists
      should be rotated to ensure that the waste does not                |4|   It is important that the joists and purlins are level on all
      interfere with the joists.                                               sides. Any problems with the level must be corrected
                                                                         |4|
                                                                               atis importantfailure to joists and purlins are level to be
                                                                               It this stage; that the do so may cause the tray on all
      Decide on direction of
                                         200mm
                                                                               damaged. Expandingwith the level must bebe added
                                                                               sides. Any problems foam or silicone can corrected
|2|                                                                            at this stage; failure as necessary.
                                                                               underneath the tray to do so may cause the tray to be
      waste outlet and break
      out wall if required,                              Cover Plate
                                                                               damaged. Expanding foam or silicone can be added
                                                                         |5|   underneath the tray into position;
                                                                               Place the tray gentlyas necessary. do not drop the tray
      allowing the waste                                                       into position as this could cause damage. Check that
      pipe to connect to the                                                   the tray is tray gently into position; do not drop the tray
      out flow drain. Install                             Clamp Ring      |5|   Place the level on all 4 sides.
      the waste piping, it                                                     into position as this could cause damage. Check that
      should line up with the                            Grid
                                                                         |8|   the tray is level on all 4 sides.
      centre of the waste
      opening in the tray. It
                                                         Dip Tube
      is important that the
                                                         Waste
      included manufacturers                             Outlet
      waste instructions are                             Flanged
                                                         Flow
      followed.                                          Outlet


      Wastes to suit
      tiled floors can
      be supplied if                                     Rubber Washer   |6|   Connect the waste to the waste pipe-work. It is
      required.                                                                important that the included manufacturers waste
                                 90mm
                                                      50mm               |6|   Connect theare followed. waste pipe-work. It is
                                                                               instructions waste to the
                                                                               important that the included manufacturers waste
                                                         Trap
                                                                               instructions are followed. of the joists and drill holes
                                                                               Mark the position of each
                                                                         |7|
                                                                               on all 4 sides of the tray into the joists and purlins. The
|3|                                                                      |7|   Mark the position of each ofto accommodate the head
                                                                               holes must be countersunk the joists and drill holes
                                                                               onthe 4 sides of the tray into the joists and purlins. The
                                                                               of all screws.
                                                                               holes must be countersunk screw size of
                                                                               We recommend a minimum to accommodate the head
                                                                               of the screws. (#10 x 2½).
                                                                               4.2mm x 60mm
                                                                               We recommend a minimum screw size of
                                                                               4.2mm x 60mm (#10 x 2½). the floor and the tray
                                                                               The interface seam between
                                                                         |8|
                                                                               must be completely level. It is necessary to fill any gap
                                                                         |8|   The interface seam paste.
                                                                               with polyester filler between the floor and the tray
                                                                               must be completely level. It is necessary to fill any gap
                                                                               Remove the sheet paste.
                                                                               with polyester filler flooring clamping ring form the
|3|   Add support underneath the tray, there are two                     |9|
      methods for supporting the tray.                                         waste and then the sheet flooring can now be fitted
                                                                         |9|   Remove appropriate universal adhesive,
                                                                               using an the sheet flooring clamping ring form the
      Method A                                                                 waste and then the sheet flooring can the be fitted
                                                                               it is necessary to cut a 110mm hole in nowsheet
      At each end of the tray add purlins (cross-bracing)                      using an appropriate universal adhesive,
                                                                               flooring in line with the waste location. Apply an
      between the joists. Then add battens to the sides of                     it is necessary to cut a 110mm hole in the sheet
                                                                               appropriate sealant between the underside of the
      the joists and form a platform with 18mm plywood                         flooring in line with the waste location. Apply a
                                                                               sheet flooring and the waste flange to ensure an
      level with the top of the joists.                                        appropriate sealant between the underside of the
                                                                               watertight seal. Replace the sheet flooring clamping
      Method B
                                                                               sheet flooring and the
                                                                               ring when complete. waste flange to ensure a
                                                                               watertight seal. Replace the sheet flooring clamping
      At each end of the tray add purlins (cross-bracing)                      ring when complete.
      between the joists. Then add additional purlins at
      400mm intervals underneath the tray.


                                          Moira Industrial Estate, Old Kilmore Road, Moira, Co. Armagh BT67 0LZ
                                          Tel: +44 (0)28 9261 2500 Fax: +44 (0)28 9261 2326