									PORT BONYTHON PLANT – INTEGRITY MANAGEMENT PLAN
CLIENT: Santos

Santos’ Port Bonython operation, located near Whyalla in South     IONIK CONSULTING INVOLVEMENT (2006)
Australia, commenced production in 1984. The facility accepts
liquid hydrocarbons from Moomba. The feed is processed in          As part of a global effort within Santos to identify and manage all
distillation towers and molecular sieves to produce various        integrity risks across its operations, IONIK was requested to
products, namely Butane, Ethane, Propane, Crude, and Light         develop a management plan for the highest identified integrity
and Heavy Naphtha. The facility incorporates a 2.4km load out      risk at the Port Bonython liquids plant (corrosion under
jetty.                                                             insulation) and provide additional input into the management of
                                                                   other risks at the facility.
Due to the age, location, and original coating selections, the
process equipment including; piping, process vessels, storage      This management plan was developed and implemented on the
tanks and bullets, and export facilities identified the primary    facility, identifying critical plant areas and issues, appropriate
integrity risk on the plant is Corrosion Under Insulation (CUI).   management and mitigation activities, failure history and
                                                                   responsibility for management of issues at Port Bonython.