Docstoc

Tender No - __ MAHATRANSCO - Maharashtra State Electricity

Document Sample
Tender No - __ MAHATRANSCO - Maharashtra State Electricity Powered By Docstoc
					                                                   -1-

 MAHARASHTRA STATE ELECTRICITY TRANSMISSION COMPANY LIMITED,
                 TRANS O & M CIRCLE, KARAD.

                     Administrative Building,                     Tel (O): 02164-255 116
                      st
                     1 Floor, Vijaynagar,                            (P): 02164-255 127
                     Karad – 415 114, Dist: Satara.               (Res): 02164-255 181
                     E-Mail: sekarad@mahatransco.in                        Fax (O): 02164-255 151
                     Website: www.mahatransco.in

Ref: SE/Trans O&M/C/KRD/T/822                                 Date:- 14/03/2008
To,
The Editor,
Daily Mid Day, Mumbai
Daily Sakal, Pune
Daily Aikya, Satara
Daily Pudhari, Kolhapur
Daily Lokmat, Aurangabad
Daily Sakal, Satara
Daily Pudhari, Sangli
Daily Punya Nagari, Solapur

       SUB: - Insertion of advertisement in your Daily News paper.
                                               *****
Dear Sir,
       Kindly insert the attached advertisement in your immediate next issue on or before
16-03-2008. The following points should be strictly followed, while publishing the advertisement.

   1)     The Company‟s Emblem, for which the blocks have already been supplied to you by our
          Head Office should invariably be published at the left hand corner at the top and it should
          be of the same size as supplied by us.

   2)     The vacant space on the right side of the emblem at the top should be utilized to display
          the headings such as tender notice.

   3)     The advertisement should not occupy more than one / two column space.

   4)     Office address of the authority, who have issued the advertisement, should not be given at
          the top/bottom, since the same is incorporated in the text matter. It should not appear at
          more than one place.

   5)     At the end of advertisement, only designation of the officer is to be printed and not his
          name & address and it should be same point of advertisement matter but bold type.

   6)     Spacing (leading) between two lines of the text matter of the advertisement should be
          kept minimum.

   7)     The text matter of the advertisement should preferably be in ten or twelve point and in no
          case should exceed.

   8)     The advertisement should be printed in your news paper language only as per enclosed
          Tender Notice.
                                                -2-

   9)     A copy of your daily paper must be sent to this office free of cost, as soon as the
          advertisement is published.

          While forwarding your bills, in triplicate, (along with two copies of advertisement matter)
          to this office, it may please be noted that the same should accompany a certificate to the
          effect that rates charged for this advertisement are the same as that being charged to State
          Govt.‟s advertisement and approved by MSETCL, H.O., Mumbai. The copy of letter vide
          the rates are approved may please be submitted along with bill.

          Thanking you,

                                                                   Yours faithfully,




ENCL: TENDER NOTICE                                        SUPERINTENDING ENGINEER,
                                                           TRANS O&M CIRCLE, KARAD

Copy s. w. rs. to :-
           The Chief Engineer, EHV C. C. O&M Zone, Karad / Aurangabad / Nagpur / Vashi /
           Nashik / Pune / Amaravati…for favour of information please.
Copy f.w.cs. to :-
            The S.E., Trans O&M Circle, Pune / Panvel / Kalwa / Nagpur / Amaravati / Chandrapur /
            Nashik / Aurangabad / Parli / Bhusawal.
Copy to :-
       1) The E.E., Trans O&M Division, Karad / Kolhapur / Solapur / Pune / TCD, Karad /
               400KV R.S. O&M Division, Karad / Talandage / Lamboti / Lonikand
       2) The Manager (F&A), Trans O&M Circle, Karad.
       3) P. & P. R. O. (KOPZ), Kolhapur.
            .. This has reference to this letter No. 1701 Dtd. 13-03-2008.
            Notice Board.

MF (T) / SF (AE)
                                             -3-

                                    TENDER NOTICE

EMBLEM OF
TRANS CO.

      Sealed and superscribed tenders are invited from the manufacturers / suppliers /
contractors for the works as detailed below: -

Sr.       Tender No.                       Particulars                   Estimated     E.M.D.
No.                                                                       Cost Rs.       Rs.
 1    SE/TransC/KRD/T       Overhauling of 33/110/220KV BHEL Make        35/-        38,500/-
      /T-11 / 07-08         MOCBs.                                       Lakhs
 2    SE/TransC/KRD/T       Supply of SF-6 Gas.                          10/-        13,500/-
      /T-12 / 07-08                                                      Lakhs
 3    SE/TransC/KRD/T       Supply of Switchyard lighting material.      5/- Lakhs   8,500/-
      /T-13 / 07-08
 4    SE/TransC/KRD/        Supply of Stationary.                        5/- Lakhs   8,500/-
      GAD/T-14 / 07-08
 5    SE/TransC/KRD/T       Crimping to the cut points of various        210/-       2,13,500/-
      /T-15 / 07-08         transmission lines under Trans O&M           Lakhs
                            Circle, Karad by providing & fixing of
                            required compression type clamps &
                            connectors.
 6    SE/TransC/KRD/T       Strengthening of 220/132/110/ 33/22KV        205/-       2,08,500/-
      /T-16 / 07-08         Bus at various S/Stns. by replacing          Lakhs
                            existing single 0.2 / 0.4 ACSR conductor
                            by twin conductor at various S/Stns. under
                            Trans O&M Circle, Karad.
  The blank tender forms are available in the office of the Superintending Engineer,
MSETCL, Trans O&M Circle, Vijaynagar, Post. Supane, Tal. Karad at the rate of Rs.
1560/-         (1500 + 4% VAT) per No. by cash or Rs. 1660/- by post (M. O. only). EMD
has to be paid by cash or D.D. drawn on any Schedule Bank payable at Karad while
submitting the tender form. For Sr. No. 5 & 6 bidder should submit the attested
experience certificate for crimping or equivalent work issued by the authority not below
the rank of Executive Engineer for the amount of Rs. 50/- Lakhs in single order and
attested documents of average turnover during last 2 years more than 60% of the
estimated amount and test certificate of required clamps & connectors tested as per I.S.
5561 – 1970 from the recognized institute alongwith application form. If the said
documents are not enclosed with application form the blank tender form for Sr. No. 5 & 6
will not be issued by this office This office will not be responsible for any delay in postal
transit. The undersigned reserves the right to reject any or all tenders without assigning
any reason thereof.
1) The date and time for issue of blank tenders – 15.03.2008 to 24.03.2008 between
11.00 Hrs to 16.00 Hrs. only on working days. (2) Date & time for acceptance of
tenders: - 25.03.2008 upto 13.00 Hrs. (3) Date & timeforopening of tenders:- 25.03.2008
at 14.30 Hrs. In case the above date declared as public holiday, the receipt /opening will
stand postponed to the next working day at the same time as above. For more details visit
our website www.mahatransco.com

                                                         SUPERINTENDING ENGINEER
   MAHARASHTRA STATE ELECTRICITY TRANSMISSION CO. LTD.
               TRANS O&M CIRCLE, KARAD


  1) Tender No.            : SE/TRANS C/KRD/Tech/T-11/07-08

  2) Name of work          : Overhauling / Repairs of 33/110/132/220KV
                            BHEL Make MOCBs.

  3) Estimated cost        : Rs. 35.00 Lakhs.

  4) Date of submission    : 25/03/2008 upto 13.00 Hrs.

  5) Opening of Tender     : 25/03/2008 at 14.30 Hrs.

  6) E.M.D.                : Rs. 38,500/-

  7) Cost of Tender Form   : Rs. 1560/- (1500.00 + 4% VAT)
                             by Cash & Rs. 1660/- by Post.
                             (M. O. only)




  Receipt No.                 Issued to: -




     Manager (F&A)                    Superintending Engineer,
Trans O&M Circle, Karad               Trans O&M Circle, Karad
                                                    1

          MAHARASHTRA STATE ELECTRICITY TRANSMISSION CO. LTD.
                        TRANS O&M CIRCLE, KARAD
                 Tender No. : SE/TRANS C/KRD/Tech/T-11/07-08

                Overhauling / Repairs of 33/110/132/220KV BHEL Make MOCBs.

SPECIAL CONDITIONS:
     Your offer should be submitted in two separate envelopes –“A” & “B”

   (A)    Envelope (1) (Part-I)- This should contain following documents certificate/as a proof of
          qualifying pre-requisites, broachers, attested certificates etc.

REQUISITES:

          1.     Proof regarding payment of E. M. D.
          2.     Proof regarding payment of Income Tax to Income Tax Department in SARAL
                 FORM for the year 2006-07.
          3.     Certificate of performance of the same work executed for an amount of Rs. 30/-
                 Lakhs in single order from an authority not below the rank of Executive Engineer
                 during last two years.
          4.     Electrical Contract License.
          5.     Solvency Certificate of Rs. 10/- Lakhs
          6.     Sales Tax, C. S. T. Registration Certificate.
          7.     Proof regarding Registration under Service Tax.
          8.     The agency should have its own timer circuit & should be capable for recording
                 operational timing after successful completion of work of each beaker. The
                 undertaking should be submitted regarding this with details of Timer circuit
                 alongwith documentary evidence.
          9.     The contractor should quote the rates for all types of breakers such as
                 33/110/132/220KV BHEL Make MOCBs and undertaking for execution of the
                 said work should be submitted.

   (B)    ENVELOPE No. 2 (Part-II) – This should contain only price bid i.e. all tender
          documents.

          After verifying the full documents/certificate, pre-qualifications as above in Envelope No.
          1, fulfilling the desired pre-requisites, the Envelope No. 2 will be considered/opened. If
          the same is not found to be meeting the pre-requisites envelope No. 2 shall be kept
          without opening.

          Tender with incomplete details or submitted without sealing or superscribing, not
          submitted on prescribed tender form etc. are liable for rejection. Offer on FAX will not be
          accepted. This office will not be responsible for delay in postal transit.

          This office reserves the right to reject any or all tenders without assigning any reason
          thereof.


                                                            SUPERINTENDING ENGINEER,
                                                            TRANS O&M CIRCLE, KARAD.
                                                2

       MAHARASHTRA STATE ELECTRICITY TRANSMISSION CO. LTD.
                     TRANS O&M CIRCLE, KARAD
              Tender No. : SE/TRANS C/KRD/Tech/T-11/07-08
           INSTRUCTIONS TO TENDERER- GENERAL CONDITIONS.


(1)    Items rate tenders complete with all Annexure duly filled wherever necessary are invited
       in sealed covers for attending the work as per the items specified in Schedule “A”
       attached herewith .The tender should be submitted to this office.

       Address:

       Office of the Superintending Engineer,
       Maharashtra State Electricity Transmission Co. Ltd. ,
       Trans O&M Circle, Karad Admn. Bldg., At Vijaynagar, Post.Supane,
       Tal. Karad Dist. Satara - 415114

Tender should be filled in ink or typewritten. While quoting the rates shall be given both in
figures and words. There should not be any overwriting and errors. In case any changes are to be
made they should be done by crossing the original writing, duly signed by the Tenderer. In case
of difference in rates between figures and words, the rates most favorable to the Board shall be
considered.

(2)    The envelope containing the tender should be properly sealed and superscribed as below.

       (a)    Overhauling / Repairs of 33/110/132/220KV BHEL Make MOCBs, Tender
              specification No. SE/TRANSC/KRD/Tech/T-11/07-08.
       (b)    Due date: 25.03.2008 upto 13.00 hrs.
       (c)    Name & address of the firm & Telephone No./Fax No./E-Mail address.
       (d)    Earnest Money paid by D. D. / Receipt No. & date.

(3)    While submitting the tender, the Schedule “A” should be filled in and signed. The
       Tenderer is also required to sign all the documents in his offer. The Tenderer will be
       deemed to be fully aware of MSETCL‟s General Condition of Contract for supply /
       repairs of plant, equipments material particularly in respect of Security Deposit, Terms of
       Payment and Penalty for the late delivery etc. and any ignorance of these conditions will
       not exempt him from his liability to abide by the same. Copies of these are available in
       the MSETCL‟s office.

(4)    INTERPRETATION:

       If the tenderer has any doubt about the meaning of any portion of this tender he should at
       once seek clarification from the Superintending Engineer, Trans O&M Circle, Karad in
       writing in any case at least three days before due date. Additions or alternations in
       Tender Form/Conditions etc., by the Tenderer without the consent of Superintending
       Engineer Trans O&M Circle, Karad are not permissible. Tenderer should either quote his
       item rates for the works described in Schedule “A” or write the words “RATES NOT
       QUOTED” against concerned items.
                                                3

(5)    VALIDITY OF TENDER:-

The rates quoted in the tender should be open for acceptance for a minimum period of 120 days
from the date of actual opening of the tender. The tenderer will be bound to execute the work on
such acceptance by the Company. The tenders received against this work will be deemed to
comply with this condition, unless otherwise agreed by MSETCL.

(6)    ACCEPTANCE OF TENDER:

The Maharashtra State Electricity Transmission Company Ltd. has reserved the right to reject
any or all the Tenders without assigning any reason thereof & also reserve the right to place
orders for any of the items of work. There is no binding on MSETCL to accept the lowest or any
other tenderer. There is also no binding on the MSETCL to disclose any analysis or report or
notes to the tenderer. The tenderer on part bind himself to carry out the work at rate quoted by
him for different items or repairs works. The MSETCL reserves the right to reject any tender
which not confirm to any of the conditions. The decision regarding acceptance of tender shall be
intimated by the MSETCL within a period of 120 days from the date of opening of Tender and
the tenderer shall be bound to complete the work when the acceptance is intimated at Tenderer‟s
address.

(7)    QUOTATIONS:
The tenderer should quote his rate on basis of labour charges for Overhauling / Repairs of
33/110/132/220KV BHEL Make MOCBs and price list for spares required for completing the
work of overhauling of circuit breaker. No variation or deviation in the rates quoted are allowed.
        (A)        The rates furnished for spare parts should be quoted exclusive of all taxes,
                   octroi or any such payment to Govt., Semi-Govt. or statutory body as per
                   rules and regulations involved in this work. The taxes, duties should be
                   quoted separately mentioning form such as „E‟ for S.T. and „C‟ form for E.D.
                   etc. Your rate will be deemed to be for the details of work given in the tender.
                   No addition or alteration or changes in description of work will be
                   entertained.
        (B)        Price list for spare parts required for overhauling may be attached with the
                   offer.

(8)    DETAILED WORK ORDER:

The repairing, overhauling work should be carried out in presence of MSETCL‟s representative
nominated by this office.

          During the execution of overhauling if any spares are required the same shall be
       supplied by you as per price list quoted by you.

       i.      Replaced old spare must be handed over to Engineer-In-Charge so as to enable
               him to credit the same to the Stores. Acknowledgement of old spares should be
               taken and copy should be submitted alongwith the bill.
       ii.     Spare parts required for overhauling should be got approved from Executive
               Engineer/Engineer-In-Charge before replacement.
       iii.    Joint inspection should be carried out before replacement of spares and joint
               inspection report should be submitted while submitting the bill.
                                                 4

(9)    EARNEST MONEY DEPOSIT:

A sum of Rs. 38,500/- should be deposited by tenderer as earnest money deposit in cash before
due date or by Demand Draft on any Scheduled Bank in Karad in favour of Superintending
Engineer, M.S.E.T.C.L. Trans O&M Circle, Karad alongwith tender. A reference to the tender
number should invariably be given in case E.M.D. is paid in cash before the due date of tender
and relevant receipt number should be mentioned in the tender and on the sealed cover. No
interest will be allowed on E.M.D. amount. The earnest money deposit paid by unsuccessful
tenderers will be returned as soon as possible after the finalization of tender only.

       E.M.D. is liable for forfeiture (a) if the offer is withdrawn by the Tenderer before the
       finalisation of Tender. (b) If the tenderer fails to sign/execute the contract documents and
       agreement to execute the contracted work.

       All payments in cash in favour of the Board shall be made only to the authorized
       person(s) and an official stamped receipt obtained immediately. IF E.M.D.IS NOT PAID
       TENDER WILL NOT BE CONSIDERED.

(10)   TAXES & DUTIES.:

       Break-up of rates should be mentioned in detail and distinctly as far as possible viz.(I)
       Basic Price (ii) S.T./Work Contract Tax (iii) C.S.T. (iv) Service Tax (v) Excise Duty (vi)
       Octroi Duty (vii) Other taxes (vii) Other duties. If the break-up of rates is not given as
       above for one reason or other the prices quoted will be interpreted at the discretion of the
       Superintending Engineer, Trans O&M Circle, Karad and the same will be binding on the
       tenderer.

(11)   SECURITY DEPOSIT:

       Security deposit at the rate of 5% (Five percent) of the value of the order is to be paid
       within 15 days from the date of receipt of order. The Security Deposit may be paid in
       cash or in the form of D. D. drawn in favour of Superintending Engineer, M.S.E.T.C.L.,
       Trans O&M Circle, Karad or in the form of Bank Guarantee of any Nationalized Bank.
       The Security Deposit will be refunded after completion of work & N.O.C. thereof from
       operating officer.

(12)   DUE DATE OF TENDER.:

All the tenders received upto the due date and time will be opened as far as possible on the
specified date and time in the presence of the tenderer or their authorized representatives present
at that time.

(13)   WORK COMPLETION PERIOD:

The entire work should be completed within one year from the date of acceptance of order or till
completion of work which ever is earlier. The work should be completed as per the schedule
given by concerned Executive Engineer who will give you intimation minimum 10 days in
advance and you should be in a position to attend the work on that day within the stipulated
outage period.
                                                 5

(14)   SPARES:

The spares used for repairs should confirm to relevant standard and best quality. Any defect
observed due to interior quality of spares used during guarantee period will be on account of
tenderer and has to be replaced free of cost.

(15)   QUANTITY UNDER TENDER:

The quantities are tentative and are liable for changes on either side suitably during the course of
works. Tenderer should not taken any additional work beyond the scope of Contract Value unless
until written order is given by the competent authority for doing so.

(16)   EXTENSION ORDER:

The offer should be open for extension order for further 1 year if 50% extension order placed in
future after completion of tender order. The successful tenderer have to repair/overhaul breakers
on the same rate with same terms and conditions.:

(17)   TESTING INSPECTION & COMMISSIONING:

The work carried out by the contractor will be inspected at every stage by our Engineer     In-
charge. The contractor will have to carry out the overhauling/repair works of breaker and same
should be re-commissioned after obtained necessary satisfactory tests. Contractor will issue
necessary test certificate after successful completion of work.

(18)   GUARANTEE:

The successful tenderer have to give guarantee for 12 months for your workmanship, spares from
the date of repairing / overhauling or commissioning. If any defect occurs within the guarantee
period, the tenderer will have to carry out repairs free of charge for works/ spares including to
and fro transportation etc.

(19)   TERMS OF PAYMENT:
        (A)   R. A. Bill can be submitted by the contractor for passing, auditing and for
              payment after completion of overhauling/repairing of circuit breakers in each
              sub-station.
        (B)   Bill covering the charges for the work executed as per contract shall be
              submitted by you in triplicate on completion of each peace work at the sub-
              station to the Engineer In-Charge who intern forward the same to this office
              duly recorded and certified. The payment of the same will be made as per
              availability of funds at this office.
        (C)   The payment shall be effected to the contractor at the rate accepted in the rate
              schedule „A‟ based on actual measurement and as per approved price list of
              spares.
        (D)   Whenever any recovery towards damage/shortages etc. is applicable, the
              same will be recovered as assessed.
        (E)   The payment of 100% against each R. A. bill will be made based on actual
              measurement and duly recorded bill.
                                                 6

(20)   S.T. REGISTRATION: WORK CONTRACT TAX.

The tenderer must quote their Sales Tax / VAT / C.S.T. Registration No. Also Work Contract Act
Registration No. must be quoted. Work Contract Tax & Income Tax at the prevailing rate will be
deducted from the bill.


(21)   INCOME TAX CLEARANCE:

Non tender will be considered unless it is accompanied by upto date Income Tax Clearance
Certificate issued by Competent Authority & the solvency certificate in favour of the tenderer
from the Collector of the District where he resides or from the Bankers to the extent of Rs. 10.00
Lakhs.

(22)   DEDUCTIONS:

       Any losses or damages due to handling or theft or any other reasons during the period
       would be on repair‟s account. The amount of damages if any will be recovered from
       repair‟s bill or any other payment due to repairer from the Board.

(23)   LOSS/DAMAGES/THEFT:

       The material is to be provided by the tenderer. Hence stacking, storing, transport etc. will
       have to be ensured by the tenderer and for any loss, damage, theft pilferage, during
       transit, stores or execution of work; it will be at the cost and risk of tenderer.

(24)   ACCIDENT AND COMPENSATION:

If any accident occurs to any of the worker/supervisor/In-charge of the work at site, the same will
be at the risk and cost of tenderer. Compensation if any as per the Workmen‟s Compensation
Act., under various clauses there under has to be paid by the contractor and provision of the act
shall be observed by the tenderer under any circumstances. Board will not be responsible for any
such accident and payment of compensation.

(25)   INSURANCE:

The Tenderer will have to arrange for insurance at his cost for the men and material associated
with the contract till the work are satisfactorily completed. The MSETCL will not be responsible
for any accident, or loss, damages, theft, mis-hap. The Tenderer will have to lodge, pursue and
settle any or all such claims through Insurance Co..

(26)   SKILL LABOUR/WORKMANSHIP/EXPERTS:

The tendered work involve engaging of skill labour and good workmanship and quality material.
The tenderer should have group of skill labourer/supervisor in support of his experience he may
attach such experience certificate or order placed by MSETCL.
                                                   7

  (27)   FAILURE TO EXECUTE ORDER:

  In case of failure on the part of the repairer to cope up with the work within the specified period,
  the same will be got executed through some other agency at repairer risk and cost even at higher
  rate and the difference in amount if any will be recovered from the repair en addition to 15%
  supervision charges.

  (28)   PENALTY FOR LATE DELIVERY/SERVICES:

  In case the work is not completed in the specified time, the contractor shall be liable to pay
  penalty @ 1% per delayed day subject to maximum of 10% of the value of the order.

  (29)   MISCELLANEOUS:
            i)    No modification of any kind such as rebates etc. in the tender value will be
                  accepted after due date and time after receipt of tender. No deviation from
                  technical specifications will be allowed. The MSETCL will be free to
                  negotiate any particular item with any tenderer through a committee duly
                  authorized in that behalf.
            ii)   The tenderer should furnish full details about himself and about the work of
                  repairs/overhauling of breakers carried out by him for M.S.E.T.C.L. and other
                  Government or Semi Govt. organization on the page provided for this
                  purpose and submit true copies of certificates in proof thereof (which will
                  not be returned.)
            iii)  Right to place the item wise work order item wise for any of the item is
                  reserved.
            iv)   The tenderer will be presumed to be aware of the Board‟s General Conditions
                  of Contract and General Condition of work contract which are also binding so
                  far as they are applicable in respect of this contract
            v)    The decision of the Superintending Engineer, Trans O&M Circle, Karad
                  about the interpretation of any items and conditions of this tender
                  specification including Annexure and booklets of general terms and
                  conditions and orders placed under this tender shall be final and binding on
                  the tenderers/repairers.
            vi)   This complete tender document shall be deemed to form part of the item rate
                  contract and work orders if any when placed and shall be binding on the
                  tenderer/repairers.
            vii)  The successful tenderers will have to execute agreement of Rs. 100/- stamp
                  paper at his cost.
            viii) Conditional Tenders are liable for rejection.




                                                           SUPERINTENDING ENGINEER,
                                                           TRANS O&M CIRCLE, KARAD.

SIGNATURE OF TENDERER
RUBBER STAMP.
                                                        8

              MAHARASHTRA STATE ELECTRICITY TRANSMISSION CO. LTD.
                            TRANS O&M CIRCLE, KARAD
                     Tender No. : SE/TRANS C/KRD/Tech/T-11/07-08
                                     SCHEDULE ‘A’

           Overhauling/Repairs of 33/110/132/220KV BHEL Make Oil Circuit Breakers.

Sr. No. Particulars.                            Rate per breaker for                   Remarks.
                                                Overhauling in S/S
                                                (Rs.)
1        2                                       3                                     4
1.       33 KV Circuit Breaker
         type HLC 36/1000

2.       33 KV Circuit Breaker
         type HLC 36/1250

3.       33 KV Circuit Breaker
         type HLC 72.5/1600

4.       110/132KV Circuit Breaker
         type HLD 145/1200

5.       110/132 KV Circuit Breaker
         type HLD 145/1250 B.

6.       110/132 KV Circuit Breaker
         type HLR 145/2501 E.

7.       110/132 KV Circuit Breaker
         type HLR 145/2502 B.

8.       220 KV Circuit Breaker
         type HLR 245/2502 E.

9.       220KV Circuit Breaker
         type HLR245/2503 B.

Note:
        (1) The original copy of the price list for spares should be submitted with the tender.
        (2) Spares used by the tenderer for replacement shall be genuine as per original equipments.
        (3) All lubricant material such as grease, lubricating oil, transformer oil for replacement, cloth
            cotton waste, duster etc. required for overhauling will be provided by M.S.E.T.C.L. at our
            cost.
        (4) Old deteriorated spare parts should be handed over to operating officer.
        (5) Rate should be exclusive of all taxes, duties etc.


Signature of the tenderer                                      SUPERINTENDING ENGINEER,
                                                               TRANS O&M CIRCLE KARAD.
 MAHARASHTRA STATE ELECTRICITY TRANSMISSION CO. LTD.
             TRANS O&M CIRCLE, KARAD


  1) Tender No.            : SE/TRANS C/KRD/Tech/T-12/07-08

  2) Name of work          : Supply of SF-6 Gas.

  3) Estimated cost        : Rs. 10.00 Lakhs.

  4) Date of submission    : 25/03/2008 upto 13.00 Hrs.

  5) Opening of Tender     : 25/03/2008 at 14.30 Hrs.

  6) E.M.D.                : Rs. 13,500/-

  7) Cost of Tender Form   : Rs. 1560/- (1500.00 + 4% VAT)
                             by Cash & Rs. 1660/- by Post.
                             (M. O. only)




  Receipt No.                 Issued to: -




     Manager (F&A)                    Superintending Engineer,
Trans O&M Circle, Karad               Trans O&M Circle, Karad
                                              1
MAHARASHTRA STATE ELECTRICITY TRANSMISSION COMPANY LTD.
            TRANS O&M CIRCLE, KAARD
INSTRUCTIONS TO THE TENDERERS: -

      The tenderer is requested to carefully go through the following instructions and in
case of any doubts get them clarified by writing or in person from the Office of the
Superintending Engineer, Trans O&M Circle, Karad, Post- Supane, Tal. Karad, Dist. Satara.

   1. The tender documents should be Submitted in two separate envelopes superscribed
      with, Tender No. SE/Trans O&M C/KRD/T/T-12/07-08. Due Date: 25.03.2008 Up to
      13.00 Hrs as detailed below:-

                                 ENVELOPE NO.1
                                  Qualifying Bid
      A)   E.M.D. Proof
      B)   Solvency Certificate from your Bankers for Rs. 3/- Lakhs.
      C)   Photocopy of Permanent Account No.(PAN) of your Firm
      D)   Photocopy of Maharashtra Sales Tax / VAT Registration
      E)   Photocopy of Central Sales Tax Registration
      F)   Photocopy of TIN if allotted.

                            ENVELOPE NO.2
                               Price Bid
      After verifying the documents in Envelope No.1, Envelope No.2 will be
      considered for opening.

   2. Tender should be complete with all particulars, each page must be signed by the
      tenderer and pages should be numbered.
   3. Any variation / deviation from the specification in respect of description / technical
      particulars must be specifically brought out. If it is not done, it should be deemed
      that, the tenderer is in accordance with the specifications and shall be accordingly
      binding on the tenderer.
   4. E.M.D.:- Each tenderer will be required to pay Earnest Money Deposit of
      Rs. 13,500/- ( Rs. Thirteen Thousand Five Hundred only ) by cash or D.D. drawn in
      favour of Superintending Engineer, MSETCL Trans O&M Circle Karad, on any
      Schedule Bank situated at Karad before submission of tender. Tenders without
      E.M.D. will not be considered. Tenderers having SSI registration for manufacturing
      processing activities for the above item are eligible for exemption for paying E.M.D.
   5. Validity: - The tenders shall be valid for acceptance for a period of 90 days from the
      date of opening of the tender.
   6. Sales / C.S.T.: - The tenderer should state the Sales Tax/ VAT / C.S.T. registration
      No.
   7. Experience: - The Tenderer should furnish a list of orders executed for similar
      material giving order No. and date and name of the office.
   8. Tender Form: - The tender form enclosed with the specification must be signed and
      attached to the tender.
   9. Security Deposit: - In case the tender is decided in your favour, you will have to pay
      the Security Deposit at the rate of 10% of the order value within 15 days from the
      date of receipt of the order. The Security Deposit may be paid in cash or in the form
      of D.D. drawn in favour of MSETCL on any Schedule Bank situated in Karad or in
      the form of Bank Guarantee of any Nationalized Bank.
                                          2

10. Delivery Period: - Material should be delivered in two lots, First lot within 30 days
    from the date of the receipt of order and Second lot after 90 days from the date of
    receipt of first lot at MSETCL Stores Centre, Ogalewadi, Karad. The condition for
    delivery should be mentioned specifically otherwise, it will be presumed that you will
    supply the material within stipulated time.
11. Risk Purchase: - In case of failure to execute the order, the same will be purchased
    from other agency at our description and difference in cost will be recovered from the
    tenderer in addition to forfeiture of E.M.D. / S.D.
12. Submission of Tender: - The tenderer should quote his rates in figures as well as in
    words. All charges such as freight, Insurance, Taxes, Duties etc. should be made
    clear in the offer. The offer and remarks must be either in Ink or typewritten.
13. Income Tax Clearance Certificate: - The tenderer should enclose recent Income
    Tax Clearance Certificate or proof from Income Tax Department for the same,
    alongwith his offer.
14. Quality of Supply: - The material should be supplied as per specifications
    mentioned in Schedule ‘A’.
15. Terms of Payment: - The bills should be submitted in triplicate to Superintending
    Engineer, Trans O&M Circle, Karad. 100% payment will be made on production of
    following document -
        a) Invoice b) M.R.I. ( Material Receipt Intimation from Stores)
        b) Inspection report d) Excise duty Gate pass if any.
16. The material should be supplied to Stores Centre, Karad (Ogalewadi) within delivery
    period mentioned above (10).
17. Condition of the tender and the contract - The tenderer is deemed to be fully
    aware of Company’s general condition of contract and ignorance thereof shall not
    exempt him from his liability to abide by this conditions.
18. Disputes: - In case of any disputes or difference of opinion, the decision of the
    Superintending Engineer, Trans. O & M Circle, Karad will be final and binding on the
    contactor.
19. Penalty for late delivery: - In case, material is not delivered in stipulated time the
    contractor shall be liable to pay penalty at ½% per week subject to maximum 10% of
    the order value.
20. Acceptance of the Tender: - The Company does not bind itself to accept the lowest
    or any tender, it is also not binding on the Company to disclose any analysis report
    on the tender.
21. Schedules:- The following Schedules and Annexures are enclosed herewith.
        a) Schedule ‘A’ (Price / Rate)
        b) Schedule ‘B’ (Deviation)
        c) Schedule ‘C’ (Experience) and
        d) Annexure ‘A’ (Questionarie)


   Above Schedules are part of tender documents.




                                                          Superintending Engineer
                                                          Trans O&M Circle, Karad.
                                                3

MAHARASHTRA STATE ELECTRICITY TRANSMISSION COMPANY LTD.
          TRANS O&M CIRCLE, KAARD
                                        Schedule ‘A’

                      Tender No. SE/Trans.O&M C/KRD/T-12/07-08

                            Supply of SF6 Gas with Cylinders


                                                                            Amount
             Particulars                 Unit       Qty.    Rate(Rs)         (Rs)

Supply of SF-6 Gas in 40-50 Ltrs.
Cylinders.                              Kg.      600 Kg    ---------
Total No. of Cylinders- 12 Nos.                            Per Kg
SF6 Purity 99.9%, Gas content per
cylinder 50 Kg.
Conformity :- IS-13072-1991 which
is identical with norms of IEC 376
Suitable for circuit breakers.
CF4> = 0.05 Wt.%, Acidity as
HF>-0.3 Wt. ppm, Air > - 0.05 Wt.%,
Moisture (Water) > = 8 Wt. ppm.
Cylinder price inclusive in the price




                                                                       Superintending
Engineer
                                                                       Trans O&M
Circle,Karad.
Consignee :-
The Dy.Executive Engineer
M.S.E.T.C.L; Stores Centre ,KARAD. (O’wadi)




Signature of the tenderer
 MAHARASHTRA STATE ELECTRICITY TRANSMISSION CO. LTD.
             TRANS O&M CIRCLE, KARAD


  1) Tender No.            : SE/TRANS C/KRD/Tech/T-13/07-08

  2) Name of work          : Supply of Switchyard Lighting
Material.
  3) Estimated cost        : Rs. 5.00 Lakhs.

  4) Date of submission    : 25/03/2008 upto 13.00 Hrs.

  5) Opening of Tender     : 25/03/2008 at 14.30 Hrs.

  6) E.M.D.                : Rs. 8,500/-

  7) Cost of Tender Form   : Rs. 1560/- (1500.00 + 4% VAT)
                             by Cash & Rs. 1660/- by Post.
                             (M. O. only)




  Receipt No.                 Issued to: -




     Manager (F&A)                    Superintending Engineer,
Trans O&M Circle, Karad               Trans O&M Circle, Karad
                          1
MAHARASHTRA STATE ELECTRICITY TRANSMISSION COMPANY LTD.
            TRANS O&M CIRCLE, KARAD
INSTRUCTIONS TO THE TENDERERS: -

      The tenderer is requested to carefully go through the following instructions and in
case of any doubts get them clarified by writing or in person from the Office of the
Superintending Engineer, Trans O&M Circle, Karad, Post - Supane, Tal. Karad, Dist.
Satara.

   1. The tender documents should be Submitted in two separate envelopes superscribed
      with, Tender No. SE/Trans O&M C/KRD/T/T-13/2007-2008. Due Date: 25.03.2008
      Up to 13.00 Hrs as detailed below:-

                                 ENVELOPE NO. 1
                                  Qualifying Bid
        A) E.M.D. Proof
        B) Solvency Certificate from your Bankers for Rs. Three Lakhs valid for year 07-08.
        C) Photocopy of Permanent Account No. (PAN) of your Firm & I.T. Return submitted
            for the year 2006-07.
        D) Photocopy of Maharashtra VAT Registration / C.S.T. TIN No.
        E) If manufacturer, submit S.S.I. Registration / NSIC Certificate.
        F) If trader, submit authorization letter of principal.
        G) List of orders executed.
                                    ENVELOPE NO.2
                                      Price Bid
        After verifying the documents in Envelope No.1, Envelope No.2 will be
        considered for opening.
   2.   Tender should be complete with all particulars, each page must be signed by the
        tenderer and pages should be numbered.
   3.   Any variation / deviation from the specification in respect of description / technical
        particulars must be specifically brought out. If it is not done, it should be deemed
        that, the tenderer is in accordance with the specifications and shall be accordingly
        binding on the tenderer.
   4.   E.M.D.:- Each tenderer will be required pay Earnest Money Deposit of Rs. 8,500/-
        (Rs. Eight Thousand Five Hundred only) by cash or D.D. drawn on any Schedule
        Bank situated at Karad before submission of tender. Tenders without E.M.D. will not
        be considered. Tenderers having SSI registration for manufacturing processing
        activities for the above item are eligible for exemption for paying E.M.D.
   5.   Validity: - The tenders shall be valid for acceptance for a period of 90 days from the
        date of opening of the tender.
   6.   Sales / C.S.T.: - The tenderer should state the VAT / C.S.T. registration No.
   7.   Experience: - The Tenderer should furnish a list of orders executed for similar
        material giving order No. and date and name of the office.
   8.   Tender Form: - The tender form enclosed with the specification must be signed and
        attached to the tender.
   9.   Security Deposit: - In case the tender is decided in your favour, you will have to pay
        the Security Deposit at the rate of 10% of the order value within 15 days from the
        date of receipt of the order. The Security Deposit may be paid in cash or in the form
        of D.D. drawn in favour of MSETCL on any Schedule Bank situated in Karad or in
        the form of Bank Guarantee of any Nationalized Bank.
                                           2

10. Delivery Period: - Material should be delivered within 30 days from the date of the
    receipt of order. The condition for delivery should be mentioned specifically
    otherwise, it will be presumed that you will supply the material within stipulated time.
11. Risk Purchase: - In case of failure to execute the order, the same will be purchased
    from other agency at our description and difference in cost will be recovered from the
    tenderer in addition to forfeiture of E.M.D. / S.D.
12. Submission of Tender: - The tenderer should quote his rates in figures as well as in
    words. All charges such as freight, Insurance, Taxes, Duites etc. should be made
    clear in the offer. The offer and remarks must be either in Ink or typewritten.
13. Income Tax Clearance Certificate: - The tenderer should enclose recent Income
    Tax Clearance Certificate or proof from Income-Tax Department for the same,
    alongwith his offer.
14. Quality of Supply: - The material should be supplied as per specifications
    mentioned in Schedule ‘A’.
15. Terms of Payment: - The bills should be submitted in triplicate to Superintending
    Engineer, Trans O&M Circle, Karad. 100% payment will be made on production of
    following document -
        a. Invoice b) M.R.I. ( Material Receipt Intimation from Stores)
        b. Inspection report d) Excise duty Gatepass if any.
16. The material should be supplied to Stores Centre, Karad (Ogalewadi) within delivery
    period mentioned above (10). The inspection and testing of the CTs will be carried
    out at suppliers / manufacturers works before dispatch to Stores Centre.
17. Condition of the tender and the contract - The tenderer is deemed to be fully
    aware of Company’s general condition of contract and ignorance thereof shall not
    exempt him from his liability to abide by this conditions.
18. Disputes: - In case of any disputes or difference of opinion, the decision of the
    Superintending Engineer, Trans. O & M Circle, Karad will be final and binding on the
    contactor.
19. Penalty for late delivery: - In case, material is not delivered in stipulated time the
    contractor shall be liable to pay penalty at ½% per week subject to maximum 10% of
    the order value.
20. Acceptance of the Tender: - The Company does not bind itself to accept the lowest
    or any tender, it is also not binding on the Company to disclose any analysis report
    on the tender.
21. Schedules:- The following Schedules and Annexures are enclosed herewith.
        a. Schedule ‘A’ (Price / Rate)
        b. Schedule ‘B’ (Deviation)
        c. Schedule ‘C’ (Experience) and
        d. Annexure ‘A’ (Questionarie)


   Above Schedules are part of tender documents.


                                                           Superintending Engineer
                                                           Trans. O & M Circle, Karad.
                                                      3

       MAHARASHTRA STATE ELECTRICITY TRANSMISSION COMPANY LTD.
                       TRANS O&M CIRCLE, KAARD
                                Schedule ‘A’
                Tender No. SE/Trans. O&M C/KRD/T-13/07-08

                           Supply of Switchyard Lighting Material.

Sr.                    Particulars                        Unit   Qty.     Rate / Unit   Amount
No.                                                                          (Rs)
 1    Supply of High Pressure Sodium Vapour Lamps
      of Philips / Crompton Make only
      (Elliptical Type).

      A) 150 W, Screw Type                                No.    95

      B) 250 W, Screw Type                                No.    90

      C) 400 W, Screw Type                                No.    30

 2    Supply of High Pressure Mercury Vapour Lamps
      of Philips / Crompton Make Only.

      A) 125 W, Screw Type                                No.    110

      B) 125 W, Pin Type                                  No.    80

      C) 250 W, Screw Type                                No.    80

      D) 400 W, Screw Type                                No.    30

 3    Supply of Chokes for High Pressure Sodium
      Vapour Lamps of Philips / Crompton Make Only.

      A) 150 W                                            No.    50

      B) 250 W                                            No.    65

      C) 400 W                                            No.    35

 4    Supply of Chokes for High Pressure Mercury
      Vapour Lamps of Philips / Crompton Make Only.

      A) 125 W                                            No.    65

      B) 250 W                                            No.    65

      C) 400 W                                            No.    35




Consignee: -
The Dy. Executive Engineer,                                            Superintending Engineer,
Stores Centre, KARAD. ( O’wadi )                                       Trans O&M Circle, Karad.




Singnature of the tenderer.
 MAHARASHTRA STATE ELECTRICITY TRANSMISSION CO. LTD.
             TRANS O&M CIRCLE, KARAD


  1) Tender No.            : SE/TRANS C/KRD/GAD/T-14/07-08

  2) Name of work          : Supply of Office Stationary.

  3) Estimated cost        : Rs. 5.00 Lakhs.

  4) Date of submission    : 25/03/2008 upto 13.00 Hrs.

  5) Opening of Tender     : 25/03/2008 at 14.30 Hrs.

  6) E.M.D.                : Rs. 8,500/-

  7) Cost of Tender Form   : Rs. 1560/- (1500.00 + 4% VAT)
                             by Cash & Rs. 1660/- by Post.
                             (M. O. only)




  Receipt No.                 Issued to: -




     Manager (F&A)                    Superintending Engineer,
Trans O&M Circle, Karad               Trans O&M Circle, Karad
MAHARASHTRA STATE ELECTRICITY TRANSMISSION CO. LTD.
            TRANS O&M CIRCLE, KARAD


 1) Tender No.             : SE/TRANS C/KRD/Tech/T-15/07-08

 2) Name of work           : Crimping to the cut points of various
                             transmission lines under Trans O&M
                             Circle, Karad by providing & fixing
                             of required compression type clamps
                             & connectors.

 3) Estimated cost         : Rs. 210.00 Lakhs.

 4) Date of submission     : 25/03/2008 upto 13.00 Hrs.

 5) Opening of Tender      : 25/03/2008 at 14.30 Hrs.

 6) E.M.D.                 : Rs. 2,13,500/-

 7) Cost of Tender Form    : Rs. 1560/- (1500.00 + 4% VAT)
                             by Cash & Rs. 1660/- by Post.
                             (M. O. only)




 Receipt No.                  Issued to: -




    Manager (F&A)                     Superintending Engineer,
 Trans O&M Circle, Karad              Trans O&M Circle, Karad
                                                   1

       MAHARASHTRA STATE ELECTRICITY TRANSMISSION COMPANY LTD.
                      TRANS O&M CIRCLE, KARAD

                         Tender No: SE/TRANSC./KRD/Tech/T-15/07-08.

Crimping to the cut points of various transmission lines under Trans O&M Circle, Karad by
providing & fixing of required compression type clamps & connectors.
SPECIAL CONDITIONS:
       Your offer should be submitted in two separate envelopes –“A” & “B”
   (A) Envelope (1) (Part-I) - This should contain following documents certificate/as a proof of
       qualifying pre-requisites, broachers, attested certificates etc.
REQUISITES:
 a. Proof regarding payment of E.M.D.
 b. Proof regarding payment of Income Tax to Income Tax Department in SARAL FORM for the
    year 2006-07.
 c. Electrical Contract License.
 d. Insurance of Labour.
 e. Solvency Certificate of Rs. 50/- Lakhs
 f. Sales Tax / VAT / C. S. T. Registration Certificate.
 g. Proof regarding Registration under Work Contract Tax act and Service Tax.
 h. Proof of having last two years average turnover not less than 60% of the estimated amount.
 i. Certificate of performance of sub-station / line crimping / bus strengthening work executed for
    an amount of Rs. 50/- Lakhs in single order from an authority not below the rank of Executive
    Engineer.
 j. Partnership deed or copy Resolution of BOD if applicable.
 k. List of works currently in hand along with order reference, authority who have placed the
    order, amount of the order & percent of work completed till date.
 l. List of technical persons, machinery & T&P, which will be used for tender works in question.
 m. Certificate of performance, completion of similar work in Govt. Departments & MSEB /
    MSETCL / MSEDCL during the last three years only issued by authorities not below the rank
    of Executive Engineer.
 n. Test Certificate of required clamps & connectors as per I. S. 5561 – 1970 from the recognized
    institute.

   (B) ENVELOPE No. 2 (Part-II) – This should contain only price bid i.e. all tender documents.

         After verifying the full documents/certificate, pre-qualifications as above in Envelope No.1,
fulfilling the desired pre-requisites, the Envelope No.2 will be considered / opened. If the same is not
found to be meeting the pre-requisites, the envelope No. 2 shall be kept without opening.

        Tender with incomplete details or submitted without sealing or superscribing, not submitted
on prescribed tender form etc. are liable for rejection. Offer on FAX will not be accepted. This office
will not be responsible for delay in postal transit.

       This office reserves the right to reject any or all tenders without assigning any reason thereof.


                                                             SUPERINTENDING ENGINEER,
                                                             TRANS O&M CIRCLE, KARAD.
                                                  2
Special Instructions to the Tenderers.

1. Name of the work: -
        This tender is for Crimping to the cut points of various transmission lines under Trans
O&M Circle, Karad by providing & fixing of required compression type clamps & connectors,
as per Schedule for the Maharashtra State Electricity Transmission Company Ltd; (herein after
referred as the Company) tendered for by the Contractor and accepted by the Competent Authority,
duly authorized in that behalf by the Company at the rates and deliveries to the place at or within the
time specified and without any extra charges or expenses to the Company whatsoever other than
those mentioned in the accepted tender.

2. Validity of Tender: -
        All tenders shall be open for acceptance by the Company for a period of 90 days from the
date of opening of the tender and the tenderer shall be bound to so carry out the work on such
acceptance within, this validity period dispatched on tenderer‟s address. All quotations submitted
against this tender shall be deemed to comply with the conditions unless otherwise agreed to by the
Company.

3. Submission of Tender: -
       The tenderer must quote his rates specified in the Schedule in figures as well as in words.
Any variation, revision in the rates etc., will not be allowed on any grounds, such as mistake,
misunderstanding, etc., after the tender has been submitted. The tender rates must includes all
charges such as labour charges and material cost for Crimping to the cut points of various
transmission lines under Trans O&M Circle, Karad by providing & fixing of required
compression type clamps & connectors., as per Schedule „A‟ enclosed.
       a) All charges necessary to effect, as per schedule.
       b) All charges such as Tax insurance, and town duties and other imposts or similar nature.

        Tenderers are prohibited from making any additions or alterations, in the description of
articles mentioned in the Schedule. They should quote the rate for the work, described either in the
schedule or write „No rate‟ against item. If they wish to quote for similar item, they may do so by
adding such items at the end of the Schedules.

        All the tenders must be submitted in this form and must be clearly filled in. Quotations and
remarks must be either in ink or Typewritten. Tenderers are requested to sign the form of the tender
and Schedule of rates and if not so signed, the tender shall be rejected. No tender will be considered
unless it is accompanied by an Income Tax clearance in SARAL Form for the year 2006-07,
prescribed by the Income Tax Department. Every scratching / Overwriting must be initialed by the
tenderer.

4. Earnest Money Deposit:-
        Each Tenderer unless he is registered with the M.S.E.T.C.L., as Class „A‟ contractor, will be
required to pay the earnest money deposit of Rs. 2,13,500/- (Rs. Two Lakhs Thirteen Thousand Five
Hundred Only) before the due time of closing. Request for exemption from earnest money deposit
shall not be considered on any grounds.

       Also the tenders from the contractor‟s not registered with the Company as above and who do
not pay earnest money deposit before due time of closing shall be rejected, and shall not be
considered. They should pay earnest money deposit of Rs. 2,13,500/- (Rs. Two Lakhs Thirteen
Thousand Five Hundred Only). Request for payment of earnest money deposit after closing of tender
and consideration of the tender shall not be entertained.
                                                   3

       The earnest money deposit is liable to be forfeited under the following conditions: -

a)   In case the tender is withdrawn after the specified time/date of tender opening, but before
     expiry of the validity period.
b)   In case of the tenderer refuses to accept the order placed during the validity period.
c)   In case tenderer fails to pay the prescribed Security deposit against an order placed within the
     prescribed period.

       The earnest money deposit should be paid by cash or Demand Draft drawn in favour of
Superintending Engineer, M. S. E. T. C. L. TRANS O&M Circle, Karad., on any Nationalized /
Scheduled Bank in Karad. No interest shall be allowed on the earnest money deposit in respect of
unsuccessful tenderers. The earnest money, will be returned as soon as the tender has been finalized
and upon the tenderer returning to the Company the receipt thereof duly discharged in favour of the
Company. In case of successful tenderers, the earnest money deposit will be adjusted against the
Security Deposit on a specified request by the tenderer.

5. Acceptance of Tenders:
       The Company does not bind itself to accept the lowest or any tender neither with any reason
by assigned for the rejection of any tender. It is also not binding on the Company to disclose any
analysis report on tender.

6. Discarded to Tender conditions:
       The Company reserves to itself the right to reject tender which does not confirm to any of the
conditions..

7. Security Deposit:
        Every tenderer whose tender is accepted either in whole or in part must deposit money within
10 days from the date of receipt of information, by way of Security for the due and proper fulfillment
of his contract by D.D. or Cash payable to the M.S.E.T.C.L. TRANS O&M Circle, Karad. The Bank
Guarantee of any nationalized Bank will be accepted against Security Deposit.

       Security Deposit Payable at 5% of the amount of the order.

       In the event of Contractor, failing to deposit such Security within the stipulated time limit, the
Company shall have full discretion to cancel the acceptance communicated to the said tender subject
to deductions, if any as per the terms of the contract the Security deposit will be returned after the
expiry of the Guarantee Period of the work. No interest will be allowed on this deposit.

8. Execution of work:
        In the event of tender being accepted in the whole, the successful tenderer, hereafter referred
to as the contractor shall execute order immediately as per Schedule „A‟ enclosed within 120 days
from the date of handing over of site / receipt of the Company‟s firm order whichever is later. The
completion period specified shall be strictly adhered to the time being, the essence of the contract.

9. Penalty for late execution of work: -
         In case, the work not completed as per Schedule in the specified time, the Contractor shall be
liable to pay penalty at 1% per day subject to a maximum 10% of the value of order.
                                                   4

10. Failure of Execution of the work: -
        For failure to execute the work as per Schedule against the order in full, within the stipulated
period, the Company shall be at liberty, without further notice or reminder to the Contract to get the
same work done on account of and at the risk of the contractor and the prefer a claim for the
difference in price and for all expense whatsoever incurred in getting the said work done and the
same shall be recovered from any payment due to the Contractor from bills or deposit or on any
account such expenses will also include 15% Supervision charges.

11. Acceptances of contract work: -
        The work against this contract will be subject to the approval of the Officer-In-charge or any
other officer deputed for the purpose. He is at liberty to reject any or the whole without assigning any
reason and his decision in respect of such rejection will be final.

12. Submission of bills /Payment of bills: -
       The bills for the work as per Schedule „A‟ should be submitted in triplicate, to the
Superintending Engineer, TRANS O&M Circle, Karad. (Vijaynagar) through concerned Executive
Engineer duly recorded in M.B. alongwith Joint inspection & Transmission Line wise work
completion report after completion of the work of minimum Rs. 20/- Lakhs satisfactorily. The
contractor will be paid 100% payment of the bills, subject to any deductions against the contract after
duly so certified by the Company‟s Officer deputed /nominated in this behalf and within the
reasonable period from the date of receipt of the satisfactory work completion report, through
concerned Engineer-in-charge.

      In case of Contractor‟s registered with the Company as Class-„A‟ /Contractor, the terms of
payment will be as per the conditions of their registration with the Company.

13. Conditions of tender and contractor:-
       The tenders and orders/contract placed against this specification shall be governed by the
Company‟s General Conditions of contract, the tenderer is deemed to be fully aware of these
conditions and ignorance thereof shall not exempt him from his liability to abide by these conditions.

        The enclosed schedule, tender notice, tender form and instructions to tenderers also form a
part of this specification.

14.     In case of any dispute whatsoever, regarding interpretation of the terms and conditions, or
quality, the decision of the Superintending Engineer, TRANS. O&M Circle, Karad will be final and
binding on the contractor.

15.     The list of such work executed so far with Central Govt. State Govt. and other State
Electricity Board‟s to be enclosed with Tender.

16.     Any accidents occurred during the period of to any of your workers or to any outsider will be
entirely on Contractor‟s account and Company is not responsible for the same in any way.

17.    Any special permission required will have to be obtained by the contractor from Sub/Station
In-charge / Consignee before the starting the work.
                                                  5
18.    The work should be executed as per instructions from the Engineer-In-Charge or concerned
Executive Engineer who will supervise the work. The work carried out without supervision will not
be recorded and payment will not be released for such works which may please be noted.

19. Loss of material:
        You will have to keep your material in safe custody at your end. The Company will not be
responsible for the loss of the material kept at Company‟s site. The accommodation for your staff
will not be provided by the Company.

20. Tools and Plants:-
       All kinds of Tools, plants, Tackles and machines etc., are to be arranged by you at your cost.
Company will not spare any thing on this account..

21. Compensation:
      If any accident occurs to any of your worker/your Supervisor/or outsiders in carrying of the
work will be on your account. The Company will not be responsible for such accident/ compensation
payment etc.

22. Idle Labour hours:
        In case of suspension of work, or delay in work due to any reason or stay order of the Court
of Law no compensation will be paid by the Company for idle labours /idle machinery etc., during
the period.

23. Prices:-
       The rates quoted should be firm and inclusive of all taxes such as town duty Octroi, Sales
Tax, Labour charges etc., .

24. Income Tax & Work contract Tax :-
       Income tax & Work contract tax as per rules will be deducted from the contractor‟s bill.

25.     In case the work is not executed partly or fully the balance work will be got carried out from
some other agency even at higher rate and difference in cost will be recovered from your pending
bill with the Company or Security Deposit will be forfeited in addition to above.

26.   All other Standard Terms and conditions prescribed by M.S.E.T.C.L., regarding supply and
work which are not stated here are also applicable to this contract.

27.    All works subject to Karad jurisdiction.

28. Quality of work:
      Quality of work to be carried out should be strictly confirmed to our specification, otherwise
same will be rejected and contractor has to redone the same at his cost and risk only.

29.    The work carried out by the contractor if found defective due to bad workmanship, that
should be redone by contractor free of cost, if reported to him within guarantee period.

30. The said work is to be carried out for the Transmission lines under Trans O&M Circle, Karad
under the supervision of Executive Engineer, concerned or his representative not below the rank of
Dy. E. E. deputed for this job. The work is to be carried out as per approved procedure and as per I.S.
The outages will be arranged by the concerned Executive Engineer.
                                                 6

31.     The prior permission from the concerned Ex. Engineer is to be taken by the Contractor before
starting the work.

32.    The work should be executed as per Schedules enclosed and as per instructions of the
concerned Engineer-In-Charge deputed for this work.

33.     The time period for completion of work will be depending on outages available within 4
months only. The period shall be counted from the date of handing over of site. Hence the Contractor
shall have to keep the record of the dates of handing over of site countersigned by site in-charge or
authorized representative of the Company.

34.    The entire work should be guaranteed for One year from the date of work completion.



                                                           SUPERINTENDING ENGINEER,
                                                           TRANS O&M CIRCLE, KARAD.
                                               7
      MAHARASHTRA STATE ELECTRICITY TRANSMISSION COMPANY LTD.
                             TRANS O&M CIRCLE, KARAD
                     Tender No: SE/TRANSC./KRD/Tech/T-15/07-08.
                                       SCHEDULE ‘A’
SUB:- Crimping to the cut points of various transmission lines under Trans O&M Circle,
      Karad by providing & fixing of required compression type clamps & connectors.

                                                                                     Rate in    Amount in
Sr. No.                            Particulars                            Unit
                                                                                      Rs.         Rs.
   A        Replacement of old nut bolt type jumpers by
            Providing and fixing of compression type clamps &
            connectors at various cut point locations in various
            220/132/110KV EHV Transmission Lines under
            Trans O&M Circle, Karad.
            The clamps and connectors should be as per I.S.
            5561 of 1970 of standard make.
   1        Providing and fixing of compression type 'T'
            Connectors suitable for

                a) 0.3/0.4 ACSR conductor.                                No.

                b) 0.2 ACSR conductor.                                    No.

                c) 0.15 ACSR conductor.                                   No.

                d) 0.1 ACSR conductor                                     No.

   2        Providing and fixing of compression Pad type clamps
            suitable for

                a) 0.3/0.4 ACSR conductor.                                No.

                b) 0.2 ACSR conductor.                                    No.

                c) 0.15 ACSR conductor.                                   No.

                d) 0.1 ACSR conductor                                     No.

   3        Providing and Fixing of Stainless steel Nut bolts (Non        No.
            Magnetic) with double washer & check nut.
   4        Transportation and cutting of conductor of various
            sizes according to various length.

                a) 0.3/0.4 ACSR conductor.                                No.

                b) 0.2 ACSR conductor.                                    No.

                c) 0.15 ACSR conductor.                                   No.

                d) 0.1 ACSR conductor                                     No.

   5        Head loading charges for un-approachable locations.           No.
Note: - 1. Required clamps & connectors should be tested as per I. S. 5561 of 1970 at recognized
            Institute and of any standard make.
        2. The order amount will be limited upto Rs. 210/- lakhs.
        3. The rates should be quoted including all charges, taxes, mobilization charges,
             transportation charges etc;. No extra charges will be considered on any account.
          4. The concerned Executive Engineer will handover the site for work execution.




Signature of the Tenderer                                       SUPERINTENDING ENGINEER,
                                                                TRANS O&M CIRCLE, KARAD.
                                             8

      MAHARASHTRA STATE ELECTRICITY TRANSMISSION COMPANY LTD.
                             TRANS O&M CIRCLE, KARAD
                     Tender No: SE/TRANSC./KRD/Tech/T-15/07-08.
                                       SCHEDULE ‘A’
SUB:- Crimping to the cut points of various transmission lines under Trans O&M Circle,
      Karad by providing & fixing of required compression type clamps & connectors.

      Above mentioned work is to be carried out for following transmission lines.

            Sr. No.   Name of the Transmission Line
               1      110KV Mudshingi – Kothali – Radhanagari
               2      110KV Mudshingi – Dudhaganga
               3      110KV Mudshingi – Puikhadi – Kale
               4      110KV Mudshingi – Bapat Campt Ckt. No. I & II.
               5      110KV Bapat Camp – Shiroli
               6      110KV Shiroli – Wathar
               7      110KV Mudshingi – Ichalkaranji
               8      110KV Ichalkaranji – Jaysingpur
               9      110KV Miraj – Jaysingpur
              10      110KV Miraj – Kurundwad
              11      220KV Talandage – Mumewadi – Halkarni – Tillari – Ponda
              12      220KV Mudshingi – Ponda (Express Feeder)
              13      220KV Karad – Kolhapur III & IV
              14      220KV Karad – Kolhapur I & II
              15      220KV Lonand – Kandalgaon
              16      132KV Bhatghar – Shirwal
              17      220KV Karad – Solapur
              18      220KV Karad – Miraj
              19      220KV Vita Tap
              20      220KV Karad I
              21      220KV Karad II
              22      110KV Karad – Pandharpur
              23      110KV Karad – Mayani
              24      110KV Karad – Kolhapur
              25      110KV Karad – Satara Road
              26      110KV Karad – Satara MIDC
              27      110KV Atit Tap




                                                 SUPERINTENDING ENGINEER,
                                                 TRANS O&M CIRCLE, KARAD.
MAHARASHTRA STATE ELECTRICITY TRANSMISSION CO. LTD.
            TRANS O&M CIRCLE, KARAD


 1) Tender No.             : SE/TRANS C/KRD/Tech/T-16/07-08

 2) Name of work           : Strengthening of 220/132/110/33/22KV
                             Bus at various S/Stns. by replacing
                             existing single 0.2 / 0.4 ACSR
                             conductor by twin conductor at
                             various S/Stns. under Trans O&M
                             Circle, Karad.

 3) Estimated cost         : Rs. 205.00 Lakhs.

 4) Date of submission     : 25/03/2008 upto 13.00 Hrs.

 5) Opening of Tender      : 25/03/2008 at 14.30 Hrs.

 6) E.M.D.                 : Rs. 2,08,500/-

 7) Cost of Tender Form    : Rs. 1560/- (1500.00 + 4% VAT)
                             by Cash & Rs. 1660/- by Post.
                             (M. O. only)




 Receipt No.                  Issued to: -




    Manager (F&A)                     Superintending Engineer,
 Trans O&M Circle, Karad              Trans O&M Circle, Karad
                                                   1

       MAHARASHTRA STATE ELECTRICITY TRANSMISSION COMPANY LTD.
                      TRANS O&M CIRCLE, KARAD

                         Tender No: SE/TRANSC./KRD/Tech/T-16/07-08.

Strengthening of 220/132/110/ 33/22KV Bus at various S/Stns. by replacing existing single 0.2 /
0.4 ACSR conductor by twin conductor at various S/Stns. under Trans O&M Circle, Karad.
SPECIAL CONDITIONS:
       Your offer should be submitted in two separate envelopes –“A” & “B”
   (C) Envelope (1) (Part-I) - This should contain following documents certificate/as a proof of
       qualifying pre-requisites, broachers, attested certificates etc.
REQUISITES:
 a. Proof regarding payment of E.M.D.
 b. Proof regarding payment of Income Tax to Income Tax Department in SARAL FORM for the
    year 2006-07.
 c. Electrical Contract License.
 d. Insurance of Labour.
 e. Solvency Certificate of Rs. 50/- Lakhs
 f. Sales Tax / VAT / C. S. T. Registration Certificate.
 g. Proof regarding Registration under Work Contract Tax act and Service Tax.
 h. Proof of having last two years average turnover not less than 60% of the estimated amount.
 i. Certificate of performance of bus strengthening / crimping work at sub-stations executed for an
    amount of Rs. 50/- Lakhs in single order from an authority not below the rank of Executive
    Engineer.
 j. Partnership deed or copy Resolution of BOD if applicable.
 k. List of works currently in hand along with order reference, authority who have placed the
    order, amount of the order & percent of work completed till date.
 l. List of technical persons, machinery & T&P, which will be used for tender works in question.
 m. Certificate of performance, completion of similar work in Govt. Departments & MSEB /
    MSETCL / MSEDCL during the last three years only issued by authorities not below the rank
    of Executive Engineer.
 n. Test Certificate of required clamps & connectors as per I. S. 5561 – 1970 from the recognized
    institute.

   (D) ENVELOPE No. 2 (Part-II) – This should contain only price bid i.e. all tender documents.

         After verifying the full documents/certificate, pre-qualifications as above in Envelope No.1,
fulfilling the desired pre-requisites, the Envelope No.2 will be considered / opened. If the same is not
found to be meeting the pre-requisites, the envelope No. 2 shall be kept without opening.

        Tender with incomplete details or submitted without sealing or superscribing, not submitted
on prescribed tender form etc. are liable for rejection. Offer on FAX will not be accepted. This office
will not be responsible for delay in postal transit.

       This office reserves the right to reject any or all tenders without assigning any reason thereof.


                                                             SUPERINTENDING ENGINEER,
                                                             TRANS O&M CIRCLE, KARAD.
                                                  2
Special Instructions to the Tenderers.

1. Name of the work: -
        This tender is for Strengthening of 220/132/110/ 33/22KV Bus at various S/Stns. by
replacing existing single 0.2 / 0.4 ACSR conductor by twin conductor at various S/Stns. under
Trans O&M Circle, Karad, as per Schedule for the Maharashtra State Electricity Transmission
Company Ltd; (herein after referred as the Company) tendered for by the Contractor and accepted by
the Competent Authority, duly authorized in that behalf by the Company at the rates and deliveries to
the place at or within the time specified and without any extra charges or expenses to the Company
whatsoever other than those mentioned in the accepted tender.

2. Validity of Tender: -
        All tenders shall be open for acceptance by the Company for a period of 90 days from the
date of opening of the tender and the tenderer shall be bound to so carry out the work on such
acceptance within, this validity period dispatched on tenderer‟s address. All quotations submitted
against this tender shall be deemed to comply with the conditions unless otherwise agreed to by the
Company.

3. Submission of Tender: -
       The tenderer must quote his rates specified in the Schedule in figures as well as in words.
Any variation, revision in the rates etc., will not be allowed on any grounds, such as mistake,
misunderstanding, etc., after the tender has been submitted. The tender rates must includes all
charges such as labour charges and material cost for Strengthening of 220/132/110/ 33/22KV Bus
at various S/Stns. by replacing existing single 0.2 / 0.4 ACSR conductor by twin conductor at
various S/Stns. under Trans O&M Circle, Karad, as per Schedule „A‟ enclosed.
        c) All charges necessary to effect, as per schedule.
        d) All charges such as Tax insurance, and town duties and other imposts or similar nature.

        Tenderers are prohibited from making any additions or alterations, in the description of
articles mentioned in the Schedule. They should quote the rate for the work, described either in the
schedule or write „No rate‟ against item. If they wish to quote for similar item, they may do so by
adding such items at the end of the Schedules.

        All the tenders must be submitted in this form and must be clearly filled in. Quotations and
remarks must be either in ink or Typewritten. Tenderers are requested to sign the form of the tender
and Schedule of rates and if not so signed, the tender shall be rejected. No tender will be considered
unless it is accompanied by an Income Tax clearance in SARAL Form for the year 2006-07,
prescribed by the Income Tax Department. Every scratching / Overwriting must be initialed by the
tenderer.

4. Earnest Money Deposit:-
        Each Tenderer unless he is registered with the M.S.E.T.C.L., as Class „A‟ contractor, will be
required to pay the earnest money deposit of Rs. 2,08,500/- (Rs. Two Lakhs Eight Thousand Five
Hundred Only) before the due time of closing. Request for exemption from earnest money deposit
shall not be considered on any grounds.

       Also the tenders from the contractor‟s not registered with the Company as above and who do
not pay earnest money deposit before due time of closing shall be rejected, and shall not be
considered. They should pay earnest money deposit of Rs. 2,08,500/- (Rs. Two Lakhs Eight
Thousand Five Hundred Only). Request for payment of earnest money deposit after closing of tender
and consideration of the tender shall not be entertained.
                                                   3

       The earnest money deposit is liable to be forfeited under the following conditions: -

d)   In case the tender is withdrawn after the specified time/date of tender opening, but before
     expiry of the validity period.
e)   In case of the tenderer refuses to accept the order placed during the validity period.
f)   In case tenderer fails to pay the prescribed Security deposit against an order placed within the
     prescribed period.

       The earnest money deposit should be paid by cash or Demand Draft drawn in favour of
Superintending Engineer, M. S. E. T. C. L. TRANS O&M Circle, Karad., on any Nationalized /
Scheduled Bank in Karad. No interest shall be allowed on the earnest money deposit in respect of
unsuccessful tenderers. The earnest money, will be returned as soon as the tender has been finalized
and upon the tenderer returning to the Company the receipt thereof duly discharged in favour of the
Company. In case of successful tenderers, the earnest money deposit will be adjusted against the
Security Deposit on a specified request by the tenderer.

5. Acceptance of Tenders:
       The Company does not bind itself to accept the lowest or any tender neither with any reason
by assigned for the rejection of any tender. It is also not binding on the Company to disclose any
analysis report on tender.

6. Discarded to Tender conditions:
       The Company reserves to itself the right to reject tender which does not confirm to any of the
conditions..

7. Security Deposit:
        Every tenderer whose tender is accepted either in whole or in part must deposit money within
10 days from the date of receipt of information, by way of Security for the due and proper fulfillment
of his contract by D.D. or Cash payable to the M.S.E.T.C.L. TRANS O&M Circle, Karad. The Bank
Guarantee of any nationalized Bank will be accepted against Security Deposit.

       Security Deposit Payable at 5% of the amount of the order.

       In the event of Contractor, failing to deposit such Security within the stipulated time limit, the
Company shall have full discretion to cancel the acceptance communicated to the said tender subject
to deductions, if any as per the terms of the contract the Security deposit will be returned after the
expiry of the Guarantee Period of the work. No interest will be allowed on this deposit.

8. Execution of work:
        In the event of tender being accepted in the whole, the successful tenderer, hereafter referred
to as the contractor shall execute order immediately as per Schedule „A‟ enclosed within 120 days
from the date of handing over of site / receipt of the Company‟s firm order whichever is later. The
completion period specified shall be strictly adhered to the time being, the essence of the contract.

9. Penalty for late execution of work: -
         In case, the work not completed as per Schedule in the specified time, the Contractor shall be
liable to pay penalty at 1% per day subject to a maximum 10% of the value of order.
                                                   4

10. Failure of Execution of the work: -
        For failure to execute the work as per Schedule against the order in full, within the stipulated
period, the Company shall be at liberty, without further notice or reminder to the Contract to get the
same work done on account of and at the risk of the contractor and the prefer a claim for the
difference in price and for all expense whatsoever incurred in getting the said work done and the
same shall be recovered from any payment due to the Contractor from bills or deposit or on any
account such expenses will also include 15% Supervision charges.

11. Acceptances of contract work: -
        The work against this contract will be subject to the approval of the Officer-In-charge or any
other officer deputed for the purpose. He is at liberty to reject any or the whole without assigning any
reason and his decision in respect of such rejection will be final.

12. Submission of bills /Payment of bills: -
       The bills for the work as per Schedule „A‟ should be submitted in triplicate, to the
Superintending Engineer, TRANS O&M Circle, Karad (Vijaynagar) through concerned Executive
Engineer duly recorded in M.B. alongwith Joint inspection & Transmission Line wise work
completion report after completion of the work of minimum Rs. 20/- Lakhs satisfactorily. The
contractor will be paid 100% payment of the bills, subject to any deductions against the contract after
duly so certified by the Company‟s Officer deputed /nominated in this behalf and within the
reasonable period from the date of receipt of the satisfactory work completion report, through
concerned Engineer in-charge.

      In case of Contractor‟s registered with the Company as Class-„A‟ /Contractor, the terms of
payment will be as per the conditions of their registration with the Company.

13. Conditions of tender and contractor:-
       The tenders and orders/contract placed against this specification shall be governed by the
Company‟s General Conditions of contract, the tenderer is deemed to be fully aware of these
conditions and ignorance thereof shall not exempt him from his liability to abide by these conditions.

        The enclosed schedule, tender notice, tender form and instructions to tenderers also form a
part of this specification.

14.     In case of any dispute whatsoever, regarding interpretation of the terms and conditions, or
quality, the decision of the Superintending Engineer, TRANS. O&M Circle, Karad will be final and
binding on the contractor.

15.     The list of such work executed so far with Central Govt. State Govt. and other State
Electricity Board‟s to be enclosed with Tender.

16.     Any accidents occurred during the period of to any of your workers or to any outsider will be
entirely on Contractor‟s account and Company is not responsible for the same in any way.

17.    Any special permission required will have to be obtained by the contractor from Sub/Station
In-charge / Consignee before the starting the work.
                                                  5
18.    The work should be executed as per instructions from the Engineer-In-Charge or concerned
Executive Engineer who will supervise the work. The work carried out without supervision will not
be recorded and payment will not be released for such works which may please be noted.

19. Loss of material:
        You will have to keep your material in safe custody at your end. The Company will not be
responsible for the loss of the material kept at Company‟s site. The accommodation for your staff
will not be provided by the Company.

20. Tools and Plants:-
       All kinds of Tools, plants, Tackles and machines etc., are to be arranged by you at your cost.
Company will not spare any thing on this account..

21. Compensation:
      If any accident occurs to any of your worker/your Supervisor/or outsiders in carrying of the
work will be on your account. The Company will not be responsible for such accident/ compensation
payment etc.

22. Idle Labour hours:
        In case of suspension of work, or delay in work due to any reason or stay order of the Court
of Law no compensation will be paid by the Company for idle labours /idle machinery etc., during
the period.

23. Prices:-
       The rates quoted should be firm and inclusive of all taxes such as town duty Octroi, Sales
Tax, Labour charges etc., .

24. Income Tax & Work contract Tax :-
       Income tax & Work contract tax as per rules will be deducted from the contractor‟s bill.

25.     In case the work is not executed partly or fully the balance work will be got carried out from
some other agency even at higher rate and difference in cost will be recovered from your pending
bill with the Company or Security Deposit will be forfeited in addition to above.

26.   All other Standard Terms and conditions prescribed by M.S.E.T.C.L., regarding supply and
work which are not stated here are also applicable to this contract.

27.    All works subject to Karad jurisdiction.

28. Quality of work:
      Quality of work to be carried out should be strictly confirmed to our specification, otherwise
same will be rejected and contractor has to redone the same at his cost and risk only.

29.    The work carried out by the contractor if found defective due to bad workmanship, that
should be redone by contractor free of cost, if reported to him within guarantee period.

30. The said work is to be carried out for the Sub-Stations under Trans O&M Circle, Karad under
the supervision of Executive Engineer, concerned or his representative not below the rank of
Dy. E. E. deputed for this job. The work is to be carried out as per approved procedure and as per I.S.
The outages will be arranged by the concerned Executive Engineer.
                                                 6

31.     The prior permission from the concerned Ex. Engineer is to be taken by the Contractor before
starting the work.

32.    The work should be executed as per Schedules enclosed and as per instructions of the
concerned Engineer In-Charge deputed for this work.

33.     The time period for completion of work will be depending on outages available within 4
months only. The period shall be counted from the date of handing over of site. Hence the Contractor
shall have to keep the record of the dates of handing over of site countersigned by Sub-Station in-
charge or authorized representative of the Company.

34.    The entire work should be guaranteed for One year from the date of work completion.




                                                           SUPERINTENDING ENGINEER,
                                                           TRANS O&M CIRCLE, KARAD.
                                                7
        MAHARASHTRA STATE ELECTRICITY TRANSMISSION COMPANY LTD.
                                TRANS O&M CIRCLE, KARAD
                         Tender No: SE/TRANSC./KRD/Tech/T-16/07-08.
                                        SCHEDULE ‘A’
SUB: -Strengthening of 220/132/110/ 33/22KV Bus at various S/Stns. by replacing existing
      single 0.2 / 0.4 ACSR conductor by twin conductor at various S/Stns. under Trans
      O&M Circle, Karad.
Sr.                                                           Unit     Rate in   Amount in
                        Particulars
No.                                                                     Rs.        Rs.
 1  Dismantalling of Single / Twin 0.2/0.4 ACSR Bus           R.Mtr/
    Conductor.                                                 Per
                                                              Phase
 2   Restringing of 0.4 single ACSR Bus conductor.            R.Mtr/
                                                               Per
                                                              Phase
 3   Providing fixing & crimping of Single dead end            No.
     clamp to suit 0.4 ACSR
 4   Providing fixing & crimping of jumper cone to suit        No.
     0.4 ACSR
 5   Providing fixing & crimping of single 'T' connector to    No.
     suit 0.4 ACSR conductor.
 6   Providing fixing & crimping palm 0.4 ACSR
     connector of size.
     a) 80 x 80 mm                                             No.
     b) 100 x 100 mm                                           No.
 7   Providing fixing & crimping of Bimetallic C.T. clamp      No.
     to suit 0.4 ACSR.
 8   Providing & fixing of Bimetallic plate of size.
     a) 80 x 80 mm                                             No.
     b) 100 x 100 mm                                           No.
9    Providing & fixing of Stainless Steel nut bolts.          No.
10   Providing & fixing angular T/F bushing clamps.            No.
11   Providing fixing & crimping of Double tension
     hardware to suit 0.4 ACSR.
     a) 110 mm                                                 No.
     b) 220 mm                                                 No.
     c) 330 mm spacing                                         No.
12   Restringing of new bus twin 0.4 ACSR
     a) 22KV                                                  R.Mtr/
                                                               Per
                                                              Phase
     b) 132KV                                                 R.Mtr/
                                                               Per
                                                              Phase
     c) 220KV                                                 R.Mtr/
                                                               Per
                                                              Phase
13   Providing fixing & crimping of Twin 'T' connector to
     suit 0.4 ACSR conductor.
     a) 110 mm                                                 No.
     b) 220 mm                                                 No.
     c) 330 mm spacing                                         No.
14   Providing & fixing of double suspension H/W to suit
     0.4 twin ACSR.
     a) 110 mm                                                 No.
     b) 220 mm                                                 No.
     c) 330 mm                                                 No.
                                                        8


15    Providing fixing of spacers suitable for Twin 0.4 twin
      ACSR.
      a) 110 mm                                                    No.
      b) 220 mm                                                    No.
      c) 330 mm                                                    No.
16    Providing, fixing & crimping special breaker clamp
      to suit twin 0.4 ACSR.
17    Insulator string handling, testing & cleaning.                Per
                                                                   String
18    Jumper cutting, handling as per requirement for               Per
      jumper.                                                     Jumper
19    Providing & fixing alluminium 'L' type / straight flat to     No.
      accommodate twin conductor as per directives.


Note: - 1. All clamps and connectors should be tested as per I. S. 5561 of 1970 at recognized Institute
           and of any standard make.
        2. The order amount will be limited upto Rs. 205/- Lakhs.
        3. The rates should be quoted including all charges, taxes, mobilization charges,
           transportation charges etc;. No extra charges will be considered on any account.
        4. The work is to be executed for sub-stations under Trans O&M Dn., Karad / Kolhapur.
        5. The concerned Executive Engineer will handover the sub-station site.




Signature of the Tenderer                               SUPERINTENDING ENGINEER,
                                                        TRANS O&M CIRCLE, KARAD.

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:838
posted:2/2/2010
language:English
pages:39