DRAFT RECOMMENDATIONS ON PRIORITIZATION OF TARGET AREAS FOR

Document Sample
scope of work template
							DRAFT RECOMMENDATIONS ON PRIORITIZATION OF TARGET AREAS FOR PROGRAMMING
Note: Recommended sites are for budgeting and programming purposes only. Final site selection will be made by local jurisdiction after
environmental review and community input.

PRIORITY     TARGET AREA      JURISDICTION      Site Recommended    CAPITAL BUDGET (Land                 CAPITAL BUDGET (Construction of
             Number and                         For Programming     Acquisition up to 8 acres, Design,   remaining stalls up to projected 2020
             intersection                       & Budget Purposes   Construction of up to 250 stalls)    demand)
NEAR-
TERM
1            #30              MESA              #30.1               $3,205,000                           Site capacity reached in phase 1.
             US 60 near                         (Superstition                                            Phase 2 could be a structured
             Power Road                         Springs Mall)                                            facility or a second surface lot.
                                                                                                         Surface used for budgeting
                                                                                                         purposes; an estimate of
                                                                                                         $4,950,000 for a total of 800
                                                                                                         stalls is used.
2            #12/13           GLENDALE          #13.2               $5,905,000                           $4,950,000; total of 800 stalls
             Loop 101 near                      (Loop 101
             67th Avenue                        Frontage Rd and
                                                59th – SE)

3            #4               PHOENIX           #5.5                $4,130,000                           $1,539,000; total of 421 stalls
             I-10 near                          (50th Street, ¼
             Elliott Road                       mile n of
             OR                                 Chandler Blvd.)
             #5 – I-10 near
             Chandler Blvd.
4            #29              GILBERT           #29.4               $2,990,000                           Site capacity reached in phase 1.
             US 60 near                         (Page/Ash – SW)                                          Phase 2 could be a structured
             Val Vista                                                                                   facility or a second surface lot.
                                                                                                         Surface used for budgeting
                                                                                                         purposes; an estimate of
                                                                                                         $1,143,000 for a total of 377
                                                                                                         stalls is used.
PRIORITY     TARGET AREA      JURISDICTION   Site Recommended    CAPITAL BUDGET (Land                 CAPITAL BUDGET (Construction of
             Number and                      For Programming     Acquisition up to 8 acres, Design,   remaining stalls up to projected 2020
             intersection                    & Budget Purposes   Construction of up to 250 stalls)    demand)
5            #14/27           PHOENIX        #14.3               $4,330,000                           $3,150,000; total of 600 stalls;
             SR- 51 near                     (36th and Bell;                                          to maximum size of site
             Bell Road                       SW)



6            #15              SCOTTSDALE     #16.2               $4,905,000                           $1,260,000; total of 390 stalls
             Loop 101 near                   (Pima/Loop 101
             Scottsdale                      and Cactus Road
             Road                            – NE)
             OR
             #16 –Loop 101
             near Shea Blvd
7            #11              PEORIA         #11.3               $3,990,000                           $1,728,000; total of 442 stalls
             Loop 101 near                   (91st
             Grand Avenue                    Avenue/Olive –
                                             SE)
8            #7               PHOENIX        #7.1 (decked)       $9,300,000 (50%-50%                  $1,194,000; total of 283 stalls
             I-17 near                       (Metrocenter)       funding: $4,650,000 with
             Peoria Avenue                                       $4,650,000 LRT funding)
9            #23/24           MESA           #23.2               $3,290,000                           $1,647,000; total of 433 stalls
             Loop 202 near                   (Gilbert/
             Power/Gilbert                   McDowell –
                                             SW)
10           #2               AVONDALE/      #2.3                $3,780,000                           $1,071,000; total of 369 stalls
             I-10 near        GOODYEAR       (Central/Van
             Litchfield Rd.                  Buren – SE)
Sub-total – Near-term                                            $41,175,000                          $22,632,000

LONG-
TERM
11           #4               PHOENIX        #4.3                $4,130,000                           $1,143,000; total of 377 stalls
             I-10 near                       (Warner Road/I-
             Elliott Road                    10 – SE)
PRIORITY   TARGET AREA      JURISDICTION   Site Recommended    CAPITAL BUDGET (Land                 CAPITAL BUDGET (Construction of
           Number and                      For Programming     Acquisition up to 8 acres, Design,   remaining stalls up to projected 2020
           intersection                    & Budget Purposes   Construction of up to 250 stalls)    demand)
           OR
           #5 – I-10 near
           Chandler Blvd.
12         #15              SCOTTSDALE     #15.2               $4,760,000                           $2,250,000; total of 500 stalls
           Loop 101 near                   (Loop
           Scottsdale                      101/Scottsdale –
           Road                            NW)
           OR
           #16 –Loop 101
           near Shea Blvd



13         #18              TEMPE          #18.1               $3,075,000                           $1,368,000; total of 402 stalls
           Loop 101 in                     (Loop 101
           Tempe                           between
                                           Broadway and
                                           Apache – NE)
14         #28              MESA           #28.3               $3,900,000                           $3,150,000; total of 600 stalls
           US 60 near                      (Mesa
           Country Club                    Drive/Javelina –
           Road                            NE/SE)
15         #20/21           CHANDLER       #20.5               $3,430,000                           $1,332,000; total of 398 stalls
           Loop 202 near                   (Frye/Price
           Arizona                         Frontage Road –
           Avenue/Val                      SW)
           Vista
16         #10              COUNTY         #10.3               $3,555,000                           $2,295,000; total of 505 stalls
           Loop 101 near                   (Loop
           Camelback                       101/Camelback
                                           – SW)
17         #8               PHOENIX/       #8.1                $3,900,000                           $2,565,000; total of 535 stalls
           I-17 near Deer   COUNTY         (Happy Valley
           Valley Road                     Rd/I-17 – SW)
PRIORITY     TARGET AREA       JURISDICTION   Site Recommended    CAPITAL BUDGET (Land                 CAPITAL BUDGET (Construction of
             Number and                       For Programming     Acquisition up to 8 acres, Design,   remaining stalls up to projected 2020
             intersection                     & Budget Purposes   Construction of up to 250 stalls)    demand)
18           #22               GILBERT/       #22.5               $3,205,000                           0; demand less than 250 stalls; to
             Loop 202 near     COUNTY         (Val                                                     be re-evaluated as demand
             Power Road                       Vista/Germann –                                          warrants
                                              NW)


19           #31               SURPRISE       #31.4               $3,430,000                           0; demand less than 250 stalls; to
             Grand Avenue                     (Bell Rd/Dysart                                          be re-evaluated as demand
             near Litchfield                  – SW)                                                    warrants
20           #32               GLENDALE       To be determined    to be determined                     to be determined
             (PROPOSED)
Sub-total – Long-term                                             $33,385,000                          $14,103,000
TOTALS                                                            $74,560,000                          $36,735,000

						
Related docs