U.S. Grant Bridge Replacement Project

over the Ohio River @ Portsmouth, Ohio









HNTB Engineer of Record

Dr. Sena Kumarasena, Ph.D., P.E.



ODOT Engineer in Charge

Daniel E. Beasley, P.E.

Existing U.S. Grant Bridge over the

Ohio River @ Portsmouth, Ohio

Type: Steel Suspension Cables Supporting Steel

Framing and Reinforced Concrete Deck on

Reinforced Concrete Substructure



Spans: 350’ – 700’ – 350’



Roadway: 22’ Toe-to-Toe of Curb



Wearing Surface: Asphalt



Year Built: 1927

Proposed U.S. Grant Bridge over the

Ohio River @ Portsmouth, Ohio

Type: Steel Cable Stays Supporting Steel

Girders and Floorbeams and (Post Tensioned)

Concrete Deck



Spans: 350’ – 875’ – 460’



Roadway: 61’ Toe-to-Toe of Parapet; 70’ Overall



Wearing Surface: 1 1/4” High Performance

Concrete

Proposed U.S. Grant Bridge over the

Ohio River @ Portsmouth, Ohio



Two (2) Single Shaft Towers



Asymmetrical Span Configuration



Superstructure fixed at the towers



Two (2) planes of stays anchored to each single

tower head

Proposed U.S. Grant Bridge over the

Ohio River @ Portsmouth, Ohio



KY Abutment to Midspan



16S

1S









350' 437.5'







SOUTH HALF

Proposed U.S. Grant Bridge over the

Ohio River @ Portsmouth, Ohio

Midspan to OH Abutment

G









5N

16N

4N









| PARK

T

STREET



T









437.5' 460'



NORTH HALF

Proposed U.S. Grant Bridge over the

Ohio River @ Portsmouth, Ohio

Four (4) each 10 ‘ diameter drilled shafts below

each tower



Height (river to bridge deck) ~ 95 feet



Height (bridge deck to top of tower) ~ 195 feet

(equivalent to a 19 story tall building)



Bridge Deck Area ~ 133,610 SF (equivalent to

32 basketball courts or 4 football fields)

Proposed U.S. Grant Bridge over the

Ohio River @ Portsmouth, Ohio



ODOT Project 178-01



Letting Date: April 18, 2001



Engineers Estimate: $27,235,000.00



Number of Bidders: 5 each

Proposed U.S. Grant Bridge over the

Ohio River @ Portsmouth, Ohio



Awarded Contractor: CJ Mahan Construction



Awarded Amount: $28,434,495.93



First Day of Work: June 25, 2001



Opened to Traffic: October 16, 2006

Major Construction Changes



Pre-fabricated Structural Steel Tower Head Unit

in lieu of formwork and cast-in-place concrete



9 foot Median Curb with Impact Attenuators in

lieu of Type 5 guardrail



Stainless Steel Tower Head Shell Wall in lieu of

cast-in-place concrete

Structural Steel Tower Head Unit

Structural Steel Tower Head Unit

Structural Steel Tower Head Unit

Median Curb

Median Curb

Stainless Steel Shell Wall

Construction

KY Tower Footer

KY Tower Lower & Upper Segments

KY Tower Table Top

OH & KY Towers

1ST Cable Stay: 8N

First Superstructure Erection Segment

Typical Closure Joint

Connecting to KY

Connecting to OH

Remaining Superstructure Segments

Last Superstructure Erection Segment

First person to walk across:

John F. Hagen, P.E.

Project Engineer

Area Engineer

District Deputy Director

Tower Head w/o SS Shell Wall

Tower Head w/SS Shell Wall

Welcome to Ohio

Grand Opening, October 16, 2006

Grand Opening, October 16, 2006

U S GRANT BRIDGE

1927 2006

U.S. Grant Bridge

over the Ohio River @ Portsmouth, Ohio

ODOT Engineer in Charge

Daniel E. Beasley, P.E.









HNTB Engineer of Record

Dr. Sena Kumarasena, Ph.D., P.E.


Share This Document


Related docs
Other docs by tdelight
interviews
Views: 68  |  Downloads: 2
family law attorneys lake county
Views: 182  |  Downloads: 0
colorado family law
Views: 65  |  Downloads: 0
wisconsin tax refund status
Views: 142  |  Downloads: 0
master budget
Views: 503  |  Downloads: 10
list of ways to save money
Views: 74  |  Downloads: 7
joint custody right in arizona
Views: 68  |  Downloads: 0
immigration law schools
Views: 159  |  Downloads: 1
increasing diesel fuel economy
Views: 83  |  Downloads: 7
top interview questions
Views: 311  |  Downloads: 18
by registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!