Acrobat PDF

Setting Up Of Asset Integrity Management System For Offshore Oil & Gas Platform

You must be logged in to download this document
Description

IEM Talk

Reviews
Shared by: webworm
Categories
Tags
Stats
views:
112
rating:
not rated
reviews:
0
posted:
11/1/2008
language:
English
pages:
0
THE INSTITUTION OF ENGINEERS, MALAYSIA Bangunan Ingenieur, Lots 60 & 62, Jalan 52/4, P.O. Box 223, Jalan Sultan, 46720 Petaling Jaya Tel: 03-7968 4001/4002 Fax: 03-7957 7678 E-mail: sec@iem.org.my Homepage: http://www.iem.org.my TALK ON Setting Up Of Asset Integrity Management System For Offshore Oil & Gas Platform ” (Organised by Oil, Gas and Mining Technical Division, IEM) Date : Time : Venue : Speaker : SYNOPSIS 29 November 2008 (Saturday) 9.30 am to 11.00 am ( Refreshment will be served at 9.00 am.) 2nd Floor, IEM Conference Hall, Bangunan Ingenieur, Petaling Jaya Mr. Praba Karunakaran, IICOR Asia BEM Approved CPD/PDP HOURS: 2 Ref No: IEM 08//HQ/280 /T This talk encompasses steps, methods and project management employed in setting up an Inspection Management System for a typical offshore facility. The discussions include specification & design of corrosion monitoring system, baseline inspection of pressure systems and structures, organization of data and documentation for continued operations, and set up of computerized inspection management system (CIMS). Talisman Malaysia Limited’s Northern Field asset, which includes a Central Processing Offshore Platform (CPP) and 3 wellhead platforms, are used as a case study to demonstrate the application of proactive Asset Integrity Management System. BIODATA OF SPEAKERS Chartered Engineer with over 8 years of international work experience in the field of Oil and Gas Facilities Integrity Management. Attained Engineering Masters and Degree qualifications from UK (Scottish) Universities. Familiar with Integrity Management Systems applicable to onshore and subsea pipeline, topside and susbea structure, remote subsea equipment, pressure relieving devices, topside static mechanical equipment and piping, lifting and safety equipment. Experienced in delivering integrity services to numerous international O&G operator, in world class projects, namely BP-Azerbaijan Baku-Tbilisi-Ceyhan (BTC) Pipeline, Conoco Philips Indonesia Kerisi Project, Talisman Malaysia Northern Fields Development. Worked in various environment (offshore, office base & fabrication yard) and culture (Eastern Europe, Western Europe & Asia). Talisman Malaysia Limited Seconded to iicorr Asia KL from iicorr Ltd, Scotland in February 2005 to assist in the growth of regional integrity business is currently seconded to Talisman Malaysia, responsible for setting up an Inspection Management System for Northern Field Central Processing Platform (BOA), and 3 Wellhead Riser Platforms (BOB, BOC, & BOD). Directly responsible for updating inspection procedure, training inspector, coordinating yard baseline inspection, setting up Computerised Inspection Management System (CIMS), supervising corrosion circuit study and Department of Occupational Safety and Health (DOSH) documentation compilation. Prior to Northern Fields project, similar work was performed for Talisman’s BTA, SAA, BRE and various upgrade facilities. Aberdeen Based in the UK prior to February, 2005. Carried out numerous RBI project, corrosion study and inspection scheduling and workscoping for O&G operators in the North Sea, and Worldwide. The RBI projects carried out covered all offshore and onshore equipment subject to inspection. Notable experience during this period consisted of: execution of industrial research and integrity review, development of RBI methodology, project management, and support to North Sea operators in meeting inspection ‘Best Practices’ and compliance to UK HSE rules and regulations. ENGR. MUHAMAD APANDI OSMAN Chairman Oil, Gas and Mining Technical Division Announcement to note: 1. 2. 3. 4. 5. Talk is STRICTLY for IEM members only (walk in) Limited seats available on a "first come first served" basis. (maximum 110 participants) No telephone and/or fax reservation will be entertained. Latecomers will not be allowed entrance, if the lecture hall is full. Please bring along this flyer and membership card for confirmation of attendance (CPD purpose). Members who fail to show their For IEM members, membership cards MUST be presented for identification purpose. membership card will be charged a fee of RM20.00. FUNDS FOR IEM NEW BUILDING Kindly be informed that IEM will be charging participants RM10.00 administrative fee to evening talks organized by IEM. The fee would be used for overhead costs, building maintenance expenses as well as to support the purchase of the new building. Students are however exempted. Your understanding is greatly appreciated. CPD HOURS CONFIRMATION Name of Member: .......................................................................... M’ship No: ................................................ Signature: ………………………………. Date : ..........................................................

Related docs
History of the Offshore Oil and Gas wbr Industry
Views: 76  |  Downloads: 12
Perdasama Oil, Gas
Views: 292  |  Downloads: 1
SETTING UP A RELATIONAL DATABASE SYSTEM
Views: 4  |  Downloads: 0
Oil and Gas Production Handbook
Views: 851  |  Downloads: 88
Evolution of Oil & Gas Industry in India
Views: 61  |  Downloads: 8
technip offshore
Views: 248  |  Downloads: 7
The Big Picture Integrated Asset Management
Views: 0  |  Downloads: 0
Oil Gas (PDF)
Views: 104  |  Downloads: 19
Setting Up an Offshore Company: The Process
Views: 51  |  Downloads: 1
Offshore Minerals Management Strategic Plan
Views: 106  |  Downloads: 5
premium docs
Other docs by webworm
HSE in projects - focusing on design
Views: 265  |  Downloads: 1
Industrial Drying
Views: 458  |  Downloads: 4
Energy Aspect of Industrial Drying
Views: 565  |  Downloads: 3
MALAYSIAN Oil and Gas Deepwater Development
Views: 584  |  Downloads: 11
Flare Tip Selection Chart
Views: 1085  |  Downloads: 12
Role of Chemical Engineers in Biotech Sector
Views: 332  |  Downloads: 2
Technology and Global Warming
Views: 466  |  Downloads: 1
API Std 521 Addendum May 2008 - Comp
Views: 3129  |  Downloads: 95
Engineering Services Outsourcing Opportunities
Views: 427  |  Downloads: 0
IEM Position Paper on "Energy Efficiency"
Views: 71  |  Downloads: 0
The Basics of Earned Value Management
Views: 337  |  Downloads: 6