Summary of Changes

Reviews
Shared by: homers
Stats
views:
7
rating:
not rated
reviews:
0
posted:
10/31/2008
language:
pages:
0
RFP NAMA-03-R-0018 Amendment 0001; Summary of Changes Page Nr.; Paragraph B-3 – B-6; para B.3-B.6 Summary of change CLINs 0201AA through 0501AA updated to reflect inclusion of change management. Clarifies Government monitoring of EVMS in response to question from industry - Wording change to data rights usage to “ERA Program Mission (including Other agencies‟ ERA related use)” from Government Mission - revises Escrow Arrangement item to correct typographical error for „ERA System and related documentation Corrects measurement indicator from MB to GB. Corrects titling of Down Select criteria paragraphs for Factor 1, Technical and Factor 3, Cost/Price. Corrects reference of CLIN to CLIN #16 for re-pricing activity. Corrects coverage of updated cost to CLINs (01xx-06xx) Due date block will be changed to “TBD” to allow alignment with RFP due date G-7; Clause G-9 H-9, 10; Clause H-12 J1-7; Table ERA #13 J3-1; para 1.0 J3-2; para 1.3 J4-3; ID #16 J10-1; DD254 blk 2.c J11-1 thru 10; paras – var. Clarification to PWBS paragraphs addressing real estate, physical infrastructure, acceptance test infrastructure and Change Management are provided. J11-8; para 1.11.7 J13-all; replace section Incorrect reference to Increment 4 is corrected to reference Increment 5 J13 Cost Element Structure Data Dictionary is updated to correct erroneous references to CEs , change „TCO‟ to „LCC‟, and provided Government personnel cost factor instructions. Adjusted clause to indicate option of Government to award without discussion Changes MS Office 2000 to MS Office 2002 for version of Word to be used in submissions - Instructions on providing LCC estimate are clarified - Table revised to allow one additional page for Past Performance Questionnaire Revised to delete requirement for Schedule Quality Assessment of IS as part of proposal delivery content (the SQA is still required as a CDRL during contract). - Adds Organizational Structure Change History as part of early delivery of Past Performance Volume - Clarifies that Master Cross Reference for Volume III shall be provided independently as a separate attachment to Transmittal Letter. Threshold of $1,000, 000 is deleted and definition of „cost record‟ provided. L-1; Clause 52.215-1 L-9; para 2.2.9 L-10,11; Table 2-1 L-23; para 4.2.1.4.2 L- 28; para 5.0 L-34; para6.2 There were no changes to RFP Attachment J2, ERA Requirements Document.

Related docs
SUMMARY OF REGULATIONS/CHANGES
Views: 14  |  Downloads: 0
SUMMARY OF CHANGES
Views: 19  |  Downloads: 0
Summary of Changes
Views: 4  |  Downloads: 0
A Summary of the Changes to the
Views: 1  |  Downloads: 0
Summary of Changes
Views: 0  |  Downloads: 0
SUMMARY OF CHANGES
Views: 3  |  Downloads: 0
SUMMARY OF CHANGES
Views: 3  |  Downloads: 0
Summary of Changes
Views: 4  |  Downloads: 0
Summary of Changes
Views: 3  |  Downloads: 0
Summary of Changes
Views: 2  |  Downloads: 0
MetAM changes
Views: 1  |  Downloads: 0
Summary of Changes
Views: 4  |  Downloads: 0
SUMMARY OF CHANGES TO
Views: 6  |  Downloads: 0
premium docs
Other docs by homers
Non-Discrimination Policy
Views: 332  |  Downloads: 23
2007 Inst W-3 (PR) (PDF) Instructions
Views: 323  |  Downloads: 4
RSVP LIST
Views: 411  |  Downloads: 9
Disclosure statement
Views: 299  |  Downloads: 0
EMPLOYEE BONUS MEMO
Views: 1037  |  Downloads: 8
Receipt For Services in Exchange For_Stock
Views: 417  |  Downloads: 9
Sample Nondisclosure agreement
Views: 643  |  Downloads: 19
china paper1
Views: 253  |  Downloads: 2