OWNER'S USE OF ARCHITECT/DESIGNER OR ENGINEER: In the event Owner retains (or has retained) an architect, or designer to provide or modify the plans and/or an engineer to seal or certify the plans, Contractor assumes no responsibility to assure that the plans are drawn or written by the architect, or as sealed or certified by the engineer (as applicable) in accordance with good industry standards, applicable laws, statutes or local building code requirements or regulations. Notwithstanding any terms or conditions of this Agreement to the contrary, Contractor shall not be liable for any costs, expenses or damages arising to Owner in the event such plans fail to comply with applicable laws, ordinances, codes or regulations. In the event of any such problem, Owner shall indemnify Contractor, and shall be wholly responsible to Contractor for any and all labor, expenses and costs plus ________ percent (___%) to correct any such problems.