Guidelines for the Appraisal and Management of Capital Expenditure
Document Sample


GUIDELINES FOR THE APPRAISAL AND MANAGEMENT OF
CAPITAL EXPENDITURE PROPOSALS IN THE PUBLIC
SECTOR
SIMPLE ASSESSMENT TEMPLATE
Projects costing below €0.5m
GENERAL
1. Background on the Institution to include details of:-
(a) Current Student Numbers F.T.E, P/T FTE (Day):
(b) Historic trends on student numbers + or –
Year 2010 2004/05 2003/04 2002/03 2001/02 2000/01
Full-time
Part-time
FTE (Day)
Total
SPECIFIC PROJECT
2. Proposed New Project
(a) Provide a clear statement of the needs/objectives of the proposed project (30
words max).
(b) Show how the proposed project will meet the needs/objectives identified
above (30 words max).
(c) Provide details of the impact of the proposed project on the campus as a
whole including its effect on the Institution’s current Masterplan and the
Institution’s space norms (30 words max and provide A4 outline campus plan
showing proposed projects in relation to existing facilities (space survey) ).
3. Costs
(a) Provide a preliminary assessment of the total estimated costs (i.e. construction
cost, design team fees, loose furniture, equipment and other costs).
(b) Detail any additional recurrent costs associated with this
project.
4. Programme
(a) Show the indicative programme for the design and construction of this project
(Complete template enclosed).
5. Risks
(a) Identify the risks associated with the proposed project, the potential impact on the
proposed project of adverse circumstances and outline a strategy for dealing
with risks (30 words max).
Signed: ____________________________ Date: _____________________