Request for Proposals Workflow Automation for National ICT RD

W
Document Sample
scope of work template
							                                   


                        
    Tender No: ICTR&DF/AUTOMATION/2009/0022 

          Request for Proposals 
                        
       Workflow Automation for  
        National ICT R&D Fund 




                        

 
Table of Contents 
                   

1.    Introduction ......................................................................................................................................... 1
2.    Overview of National ICT R&D Fund .................................................................................................... 1
3.    Goals of Workflow Automation ........................................................................................................... 2
4.    Current Processes................................................................................................................................. 2
5.    Scope of Implementation (Activities)................................................................................................... 4
6.    User Training ........................................................................................................................................ 7
7.    Post Implementation Services.............................................................................................................. 8
8.    Documentation .................................................................................................................................... 8
9.    Evaluation Criteria................................................................................................................................ 9
10.       Budget............................................................................................................................................ 10
11.       Standard Instructions..................................................................................................................... 11
12.       Additional Terms & Conditions...................................................................................................... 13
13.       Proposal Format and Contents ...................................................................................................... 13
14.       Annexure – I ................................................................................................................................... 15




                                                                               

 
National ICT R&D Fund 


1. Introduction 
National  ICT  R&D  Fund  (the  Company),  a  federally  governed  company  established  under  section  42  of 
the Companies Ordinance 1984, will select a registered firm, hereafter referred as the Consultant, duly 
recognized by the relevant regulatory bodies of Pakistan, after an open and transparent bidding process, 
in  accordance  with  quality‐and‐cost  based  selection  method,  acceptable  under  PPRA  Regulations  to 
provide complete workflow automation system to the Company. 


2. Overview of National ICT R&D Fund 
The  emerging  information  and  knowledge  age  and  the  accompanying  technological  revolution  are 
heralding  a  new  economic  and  social  order  characterized  by  the  development  and  exploitation  of 
information  and  communication  technologies  (ICT)  within  all  spheres  of  human  endeavor.  This  era  is 
giving rise to the emergence of information and knowledge based economies with traditional economic, 
industrial  and  commercial  activities  being  made  more  efficient  and  productive  by  incorporating 
knowledge driven processes.  

The knowledge and information economy has emerged as a new source for the creation of quality jobs, 
wealth  generation and redistribution,  rapid economic  development and prosperity as well as a means 
for  facilitating  competitiveness.  With  the  emerging  information  age,  information  and  communication 
technologies are seen by a number of countries as critical for achieving progress in economic and social 
development.  These  technologies  are  offering  developing  countries  like  Pakistan  a  window  of 
opportunity  to  leap‐frog  the  key  stages  of  industrialization  and  transform  their  agriculture  dominated 
economies  into  service‐sector  driven,  high  value‐added  information  and  knowledge  based  economies 
that can successfully compete in the global village. 

Pakistan has witnessed a phenomenal growth in its telecom industry.  The government of Pakistan has 
mandated  that  a  certain  percentage  of  gross  revenue  generated  by  all  telecom  service  providers  be 
allocated to development and research of information and communication technologies with the vision 
to transform Pakistan’s economy into a knowledge based economy by promoting efficient, sustainable 
and  effective  ICT  initiatives  through  synergic  development  of  industrial  and  academic  resources.   To 
achieve this vision National ICT R&D Fund has been created. This vision will be realized by pursuing the 
following goals: 

    •   Cultivate  industry‐academia  partnerships  by  funding  concrete  development  and  research 
        initiatives.  

    •   Enhance the national ICT related human resource development capacity manifold by facilitating 
        industrial  demand  focused  human  resource  capacity  building  and  R&D  capabilities  in  the 
        country and promoting ICT related educational programs and activities.  

    •   Make  Pakistan  an  attractive  destination  for  service  oriented  and  research  and  development 
        related jobs.  

                                                        1 

 
National ICT R&D Fund 


    •   Use ICT as a tool for wealth creation and upward mobility for economically challenged groups of 
        citizens.  

    •   Spread the ICT activities on a true national level.  


3. Goals of Workflow Automation 
The following goals should be achieved through workflow process automation at National ICT R&D Fund: 

    3.1. Senior Management should know status of each file at any given time 
    3.2. Executive  Summary/Dashboard  style  reports  should  be  available  to  each  department  head  & 
          senior management. 
    3.3. All  processes  implemented  within  the  organization  must  be  fair,  effective,  efficient  & 
          transparent (FEET). To achieve this goal, the following must be made available: 
         3.3.1. Checklist of all processing done by any position for any functionality should be available 
                  for information to all stakeholders. 
         3.3.2. Mechanism  for  dynamically  updating  checklist  should  be  defined  and  available  to  all 
                  stakeholders. 
    3.4. Internal Audit should be facilitated by these automated processes based on FEET. 
    3.5. Identify  bottlenecks  and  areas  of  improvement  in  the  organization  &  its  processes  in  a  timely 
          manner. 
    3.6. Productivity evaluation & enhancement of employees of the organization. 

4. Current Processes 
Current processes in use at National ICT R&D Fund are summarized below. Details about processes are 
available  in  operations  manual.  The  operations  manual  is  available  at  Company’s  official  web  site 
(www.ictrdf.org.pk).    Consultants  are  required  to  refer  to  the  “Scope  of  Implementation  (Activities)” 
section of this document regarding Company’s workflow processes. 

    4.1. Overall Process Flow (From Proposal Submission to Project Completion)/Noting & Document 
         Management: 
         This  is  the  mainstream  process  (nervous  system)  of  the  Company  that  starts  from  the  time  a 
         proposal  is  officially  submitted  and  ends  when  project  is  completed.  The  following 
         departments/entities are engaged in this process: 
             • Coordination 
             • Monitoring 
             • Solicitation & Evaluation 
             • Finance/Accounts 
             • Legal 
             • Administration 
             • Publication 
             • CEO/ PAC/Board 
                                                         2 

 
National ICT R&D Fund 


     4.2. Issues and Receipts (Administration) 
          Any document or postal  mail sent from office or received in office is routed through a proper 
          channel.  All  departments  take  part  in  this  process  but  one  department,  i.e.,  Administration  is 
          responsible for routing. 
     4.3. Procurement (Administration) 
          Procurement  is  the  acquisition  of  goods  and  services  for  the  Company.  All  procurements  are 
          done  in  conformity  with  Public  Procurement  Rules  2004  and  in  compliance  with  notifications 
          issued by Public Procurement Regulatory Authority. Currently, the Administration department is 
          responsible for all procurements for the Company. 
     4.4. Inventory Control (Administration) 
          Inventory  includes  any  kind  of  physical  asset:  merchandise,  consumables,  fixed  assets, 
          circulating  tools,  books,  or  capital  equipment,  etc.  Currently  the  Administration  department  is 
          responsible for managing & controlling the inventory of the Company.  
     4.5. Payroll (Accounts, Finance & HR) 
          Calculation & processing of payroll in terms of compensation & wages paid to employees of the 
          Company. This system is handled mutually by Accounts, Finance & HR departments. 
     4.6. HR 
          There are many HR processes currently in use. Some of them are listed below:  
          4.6.1. Performance appraisal 
          4.6.2. Recruitment 
          4.6.3. Training & training needs assessment 
          4.6.4. Attendance system & Work time table 
          4.6.5. Leave records 
    4.7. Accounts 
          Proper recording and reporting of financial transactions made by the Company are managed by 
          the Accounts department 
     4.8. Finance 
          Planning of financial resources of the Company is carried out by Finance department. 
     4.9. Publication 
          In  order  to  ensure  smooth  flow  of  information  to  all  internal  &  external  stakeholders  of  the 
          Company,  Publication  department  is  responsible  to  keep  updated  information  about  all  news 
          and events of the Company.  




                                                          3 

 
National ICT R&D Fund 




5. Scope of Implementation (Activities) 
The Consultant shall be responsible to duly complete all the following activities during implementation 
stage: 

    5.1. Duration of the project 
           This project should be completed within six (6) months from the date of signing of the contract 
           agreement. Extension in project duration will be possible only at the discretion of the Company. 
    5.2. Flexibility in System Architecture 
         The  system  should  be  architected  in  such  a  way  that  future  modifications  &  enhancement  of 
         processes as well as process automation of other departments should be seamless.  The system 
         should be flexible enough to accept any changes in workflow preferably with minimal changes 
         to the code. 
    5.3. Identification and Analysis of Workflow Processes 
         5.3.1. Functionalities and processes for each department are given in the operations manual.  
                  This  document  contains  a  further  explanation  and  partial  list  of  functions  &  processes 
                  for each department. Consultant must provide a complete list of functions & processes 
                  as  given  in  the  operations  manual  as  a  part  of  their  services.  Please  note  that  this 
                  complete  list  of  processes  is  not  expected  at  the  time  of  proposal  submission.  The 
                  Consultant  is  also  required  to  conduct  a  survey  during  the  requirement  elicitation 
                  process in order to identify any process or critical function not stated in this document. 
                  These  processes  or  functions  can  be  recommended  for  automation  after  consent  & 
                  recommendation of the responsible staff of the Company. 
         5.3.2. Proposals  based  upon  open  source  technology  will  be  given  preference.  As  a  general 
                  practice,  use  of  open  source  technology  decreases  the  cost  of  implementation  since 
                  expensive licenses for technology used are not required. 
         5.3.3. The    Consultant  must  conduct  a  study  of  the  existing  processes  stated  in  operations 
                  manual  as  well  as  in  this  document  and  suggest  re‐engineering  of  processes  so  that 
                  processes can be automated. 
         5.3.4. During the automation of processes, the Consultant is required to enforce the logic that 
                  governs  relationships  between  tasks  in  a  process  and  bringing  together  the  human  & 
                  information  resources  needed  to  effectively  &  efficiently  complete  each  task  in  a 
                  process. 
         5.3.5. During the requirement elicitation process, the Consultant is required to incorporate the 
                  specific responsibilities in a process from person to person and task to task based on the 
                  rules as mentioned in operations manual. 
         5.3.6. Based  upon  the  study  conducted  by  Consultant,  a  statement  along  with  solutions  & 
                  suggestions of weaknesses in the current systems is also required. 
         5.3.7. The Consultant is also required to conduct & submit detailed analysis of processes from 
                  the perspective of implementing the FEET criteria described above. 
          
                                                         4 

 
National ICT R&D Fund 


    5.4. Automation of Processes 
         The automation of processes must be web enabled & user friendly with following features: 
         5.4.1. Forms 
                In  order  to  perform  activity  on  tasks,  user  friendly  forms  are  required  in  web  based 
                environment. 
         5.4.2. Identifications of Parameters 
                The Consultant is required to identify necessary parameters (fields) to be incorporated 
                in forms. 
         5.4.3. User’s Authentication 
                A  strong  and  highly  trusted  of  authentication  method  is  required  to  be  imposed  on 
                workflow  automation  system.  Strong  authentication  includes  a  combination  of  user 
                name & password, digital certificates & security tokens. 
         5.4.4. Checklist of Tasks 
                This is a list of mandatory tasks that a user is required to perform. All assigned tasks 
                given in checklist are required to be completed before the user regains access to pass 
                on the assignment to the subsequent user. 
         5.4.5. Data Validation 
                In  order  to  ensure  correct,  meaningful  and  secure  data  input,  there  must  be  standard 
                data validation rules based on associated data dictionary. The validation methods must 
                contain the followings: 
                        i. Data Type Check 
                       ii. Range Check 
                     iii. Limit Check 
                      iv. Presence Check 
                       v. Check Digits 
                      vi. Batch Totals 
                     vii. Hash Totals 
                    viii. Spell Check 
                      ix. Consistency Check 
                       x. File Extension Check 
                      xi. Logic Check 
                     xii. Uniqueness Check 
                    xiii. Others as proposed 
         5.4.6. Fault Tolerance 
                The  system  should  have  standard  fault  tolerance  features  in  order  to  facilitate  the 
                revocation of certain activities while still maintaining a log  
         5.4.7. Attachments 
                Users must be able to attach multiple documents at once while performing activity on 
                assigned tasks. There must be a limit on size of attached document and administrator 
                must have the privilege to change the attachment size limitation. 
                 
                                                        5 

 
National ICT R&D Fund 


        5.4.8. Change in workflow 
                A change in workflow in any automated process should be customizable in the system 
                preferably with minimal changes in the code. 
        5.4.9. History of comments 
                Users must be able to type their comments in forms in a memo field. These comments 
                must  be  forwarded  to  next  user  along  with  the  assigned  task.  A  history  of  comments 
                must be maintained in descending order (latest date/time stamp on the top) and should 
                be  generated  automatically  till  the  completion  of  a  workflow,  project  or  proposal.  All 
                relevant  users  must  be  able  to  view  detailed  history  of  comments  for  each  specific 
                workflow/proposal or project. 
        5.4.10. Alerts 
                Alerts in the form of an email or pop‐up window should be generated automatically by 
                the  system  whenever  a  user  is  assigned  a  task.  The  contents  of  this  alert  must  be 
                comprised of reasonable (minimal) information about task & its priority level.  
        5.4.11. SMS Alerts 
                The  Consultant  is  also  required  to  incorporate  the  Alerts  system  in  the  form  of  SMS 
                Alerts as mentioned in 5.4.10.  
        5.4.12. Reminders/Tickler 
                A tickler system must be incorporated in the system as a reminder to perform activities 
                on assigned tasks within time. An SMS reminder may also be integrated in the system. 
        5.4.13. Digital Signatures 
                Before forwarding a task to next level, a task is required to be digitally signed by each 
                user. The digital signatures must include the following information: 
                     xiv. Name 
                      xv. Department 
                     xvi. Designation 
                    xvii. Email 
                   xviii. IP Address of the client machine 
                     xix. MAC Address 
                      xx. Date & time stamp 
        5.4.14. Help 
                In  order  to  facilitate  the  user  to  effectively  perform  activities  on  assigned  tasks,  user 
                level help must be integrated in system. 
        5.4.15. Save option during performing activities 
                Users must be facilitated to save activities so that before a session is terminated, users 
                can save their work. Later on, users may restart working on the same saved activity.  
        5.4.16. Session 
                 If  the  user  does  not  perform  any  activity,  the  session  must  be  terminated  after  a 
                specific time‐out period of inactivity and should also clear any variables associated with 
                that session. The administrator must be able to change session time out period. 
                 
                                                           6 

 
National ICT R&D Fund 


         5.4.17. Control Panel 
                  A  user  friendly  control  panel  or  administration  area  is  also  required  to  be  a  part  of 
                  workflow  automation.  All  activities  that  are  related  to  administrator  should  be 
                  incorporated in control panel or administration area. 
    5.5. Customized Dashboard & Reports 
         A customizable dashboard containing summarized data of each department within the Company 
         is required. The dashboard must be customizable based upon user/departmental privileges. 
         Customized reports are also required. The system must be capable to generate customized as 
         well as predefined reports. Data in reports must be in such a form so that it can be sorted, 
         filtered and exported.  
    5.6. Exception Handling 
         The concept of exception handling is to be incorporated in the system to deal with conditions 
         where  an  assigned  task  cannot  be  completed  due  to  certain  reasons.  This  would  include 
         provision of temporary official transfer of charge during the absence of a user.  
    5.7. Database Integrity 
         5.7.1. Ideally, all the modules (of processes) should be installed on single integrated platform 
                  accessible to all authenticated users. 
         5.7.2. The files must be stored in a compressed form. 
         5.7.3. Automatic backup system must be integrated in the system to provide data backup. 
    5.8. Workflow Diagrams/Process Maps 
         In  order  to  make  the  analysis  of  workflow  processes  easy  to  understand,  the  Consultant  is 
         required to represent all the workflows in graphical  format i.e.,  Workflow diagrams & Process 
         maps, etc.  
    5.9. Performance Measurement 
         The system must be capable to track all the activities by users. A tracking system will perform 
         following actions to measure performance level of the user: 
         5.9.1. List of tasks that are pending 
         5.9.2. Deadline of the assigned tasks 
         5.9.3. Actual completion date of the assigned tasks 
         5.9.4. No. of overall tasks assigned to a user 
         5.9.5. No. of specific category of tasks assigned to a user 


6. User Training 
After  the  automation  of  processes  is  deployed,  the  Consultant  should  provide  in‐house  training  & 
educate  all  the  relevant  staff  of  the  Company.  The  duration  &  timings  of  the  training  will  be  decided 
later after consent of the responsible staff of the Company. 




                                                          7 

 
National ICT R&D Fund 


7. Post Implementation Services 
It is mandatory that the Consultant has at least 5 week days support structure for post implementation 
services  initially  for  the  period  of  one  year.  If  support  structure  is  not  local,  the  Consultant  will  be 
required to describe other methods of support structure in detail.  A Service Level Agreement (SLA) will 
be developed between National ICT R&D Fund and Consultant to ensure standards in the resolution of 
problems  and  enhancement  requests  in  automation  of  processes.  The  Consultant  will  be  required  to 
provide  a  minimum  of  one  expert  for  a  period  of  at  least  four  (4)  months  who  will  manage  the 
automation software and concurrently train the responsible personnel as designated by Company who 
will later on administer the whole system. 


8. Documentation 
Right  after  the  implementation  of  workflow  automation  as  mentioned  in  project  plan  submitted  by 
Consultant,  the  Consultant  is  required  to  furnish  the  complete  manual  of  automation,  user’s  manual, 
release  notes,  requirement  specifications,  design  documents  and  other  information  pertaining  to  the 
performance of the software. The documentation must be furnished in both hard & soft copy formats. 
However, Unified Modeling Language (UML) is recommended for technical documentation. 




                                                           8 

 
National ICT R&D Fund 




9. Evaluation Criteria 
The evaluation of response of RFP will strictly be made on evaluation criteria provided in Annexure‐I.  

    9.1. Evaluation Process 
         9.1.1. The  Company  will  formulate  an  evaluation  committee  to  review  in  detail  all  the 
                 proposals received. 
         9.1.2. The  selection  of  the  successful  Consultant  with  highest  marks  in  evaluation  criteria 
                 provided in Annexure ‐ I will be the Company’s final decision. Therefore the bidders are 
                 required to provide as much details as considered necessary for evaluation. 
         9.1.3. Any proposal that does not meet the RFP documents requirements may be rejected. 
         9.1.4. Proposals  containing  false  or  misleading  statements  regarding  requirements  of  RFP 
                 documents may be rejected. 
         9.1.5. Financial/Bid Price will be evaluated only for proposals that achieve at least 75 % score 
                 in  technical  evaluation.  Sealed  financial  bids  will  be  returned  to  all  the  bidders  who 
                 achieve below 75% score in technical evaluation. 

The maximum number of points that can be scored is 100. Ratio of technical to financial score is 70:30. 
The evaluation criteria form is attached in Annexure – I. 

    9.2. Formula to Convert Cost to Points 

        In order to determine the final bid score following may be considered:   

        STEP 1 

         List all proposal prices:  

        Bidder #1 – Rs. 1,000,000 Bidder #2 – Rs. 2,000,000 Bidder #3 – Rs. 3,000,000 

        STEP 2 

        Convert cost to points using this formula. 

         (Price of Lowest Financial Proposal) x (Maximum Points for Financial Evaluation)  

        ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐=   POINTS 
         (Value of each bidder’s Financial Proposal)  

        The RFP allotted 30% (30 points) of the total of 100 points for financial evaluation. 

        Being the lowest, bidder #1 receives 30 points. 

        Bidder # 2 receives 15 points Rs. 1,000,000/Rs. 2,000,000 x 30 = 15  

        Bidder # 3 receives 10 points Rs. 1,000,000/Rs. 3,000,000 x 30 = 10 
                                                                9 

 
National ICT R&D Fund 


        The scores of financial bid will be added to technical scores and final award of contract 
        decision will be based on total of technical score plus financial score. 


10.     Budget 
At  present,  the  maximum  approved  budget  is  Rs.  5  million.  It  is  highly  recommended  that  the  project 
plan should have phase wise implementation schedule.  

    10.1. The project deliverables must include (but not limited) to the following: 
        10.1.1. Complete requirement documents including documentation of all processes 
        10.1.2. High level architecture & design documents 
        10.1.3. Selection of tools & technologies to be used 
        10.1.4. Hardware requirements 
        10.1.5.  Testing methodology 
        10.1.6.  Project plan 
        10.1.7.  Implementation & deployment of most critical processes 
        10.1.8. Project plan to provide services for data entry of all the existing records in newly 
                deployed system.   
    10.2. At a minimum, the following budget heads must be provided: 
        10.2.1. Comprehensive license fee for any proprietary software/technology deployed 
        10.2.2. Cost of hardware 
        10.2.3. System development cost 
        10.2.4. Management/Consulting fee 
        10.2.5. Travel including boarding & lodging 
        10.2.6. Cost of other support activities 




                                                        10 

 
National ICT R&D Fund 




11.     Standard Instructions 
Return Mailing Address, Contact Person, Telephone, Fax Number and deadline for receipt of Proposals. 

Address: 
National ICT R&D Fund 
HR & Administration Office 
Attention: Ms. Nelofar Arshad 
Project Name: Workflow Automation for National ICT R&D Fund 
6th Floor, HBL Tower 
Jinnah Avenue, Blue Area 
Islamabad 

Contact Details: 
Manager HR & Administration 
Ms. Nelofar Arshad 
Phone: +92  51 921 5360 – 64, Ext.: 104 
Fax: +92 51 921 5366 
Email: nelofar.arshad@ictrdf.org.pk 

For technical queries only, contact the following no later than 5:00 P.M. PST on 8th January, 2010 
Ihsan Elahi 
Deputy Manager Coordination 
Phone: +92  51 921 5360 – 64, Ext.: 112 
Fax: +92 51 921 5366 
Email: ihsan.elahi@ictrdf.org.pk 
 

Proposals must be received no later than 10:30 A.M. PST on 19th January, 2010. Proposals via courier, 
postal mail or by hand are acceptable. A softcopy (word document) must be submitted with the actual 
proposal. 

A  bidder’s  failure  to  submit  its  proposal  prior  to  the  deadline  will  cause  the  proposal  to  be 
disqualified. Late proposals or amendments will not be accepted for evaluation. 

    11.1. Contract Term and Work Schedule 

         The contract term and work schedule set out herein represent the Company’s best estimate of 
         the schedule that will be followed. If a component of this schedule, such as the opening date, is 
         delayed, the rest of the schedule will be shifted by the same number of days. The approximate 
         contract schedule is as follows: 



                                                     11 

 
National ICT R&D Fund 


           S. No.    Activity                                                            Dates 

           1         TOR Issue Date                                                      21st December 2009 

           2         Proposal Submission Deadline                                        19th  January 2010 at 
                                                                                         10:30 AM 

           3         Opening of Technical Proposals                                      19th January 2010 at 
                     (In front of applicants at 6th Floor, HBL Tower, Jinnah             11:00 AM  
                     Avenue, Blue Area, Islamabad) 

           4         Completion of Evaluation of the Technical Proposal                  26th January 2010 

           5         Opening of Financial Proposals at 6th Floor, HBL Tower,             27th January 2010 at 
                     Jinnah Avenue, Blue Area, Islamabad)                                11:00 AM 

           6         Notice of Intent to Award                                           29th January 2010 

           7         Negotiation                                                         3rd February 2010 

           8         Contract Agreement Date                                             10th February 2010 

 

    11.2. Bidding Procedure 
          The  bidding  procedure  for  this  assignment  is  in  line  with  clause  36(b)  of  the  PPRA  Rules  i.e. 
          Single  Stage‐two  envelope  procedure,  single  package  containing  two  separate  envelopes. 
          Accordingly  both  the  envelopes  should  be  clearly  marked  ‘Technical  Proposal’  and  ‘Financial 
          Proposal’.  
    11.3. Required Review 
          Questions  and  concerns  regarding  this  RFP  must  be  made  in  writing  and  received  by  the 
          concerned officer mentioned above at least ten working days before the proposal submission 
          deadline 
    11.4. Amendments 
          If an amendment is issued, it will be inculcated at all locations where the RFP was originally 
          placed. 
    11.5. Modified Proposals 
          Bidders  may  only  submit  one  proposal  for  evaluation.  Any  alternate  or  modified  proposal 
          submitted after due date will not be acceptable. 
    11.6. Right of Rejection 
          The Company reserves full right to refrain from making an award if it determines that to be in 
          its best interest. 



                                                         12 

 
National ICT R&D Fund 


12.     Additional Terms & Conditions 
The Company reserves the right to add terms & conditions during contract negotiation. 

    12.1. Contract Payment 
          All costs associated with the contract must be stated in Pak Rupees. Under no condition will 
          the R&D Company be liable for any payment over or above the agreed contract price.  


13.     Proposal Format and Contents 
The  bidders  are  required  to  submit  their  proposals  according  to  the  format  and  contents  summarized 
below. 

    13.1. Complete Consultant Profile 
          This section must include the following contents: 
             13.1.1.     Complete name and address of the Consultant 
             13.1.2.     Name and mailing address of the person, the Company should contact regarding 
                         the proposal. 
             13.1.3.     Core business with area of expertise 
             13.1.4.     Office locations with complete addresses 
             13.1.5.     Team composition and task assignments of proposed professional staff 
             13.1.6.     Detailed CVs of proposed professional staff 
             13.1.7.     Attachments: 
                         The bidder must submit a certified copy of certificate of incorporation or charter 
                         or an equivalent document for proof of registration of the bidding entity  
             13.1.8.     Proposal must duly be signed and stamped by an authorized Consultant officer 
    13.2. Technical & Professional Services 
          This  section  must  include  the  details  of  technical  &  professional  services  the  Consultant  is 
          currently engaged in.  
    13.3. Implementation methodology & experience 
          The  Consultant  is  required  is  to  provide  complete  details  of  experience  along  with 
          implementation  methodology  of  developing  ERP,  Groupware,  Office  automation  or  similar 
          systems.  
    13.4. References 
          The Consultant is required to provide complete list of references of deploying similar systems 
          to pubic, private, donor agencies, NGOs & Government sector organizations.  
    13.5. Tools & Technologies 
          This section includes the recommended tools & technologies for workflow automation of the 
          Company. Preference will be given to those bidders opting to use Open Source technology for 
          automation of processes at National ICT R&D Fund. 




                                                        13 

 
National ICT R&D Fund 


           
    13.6. Understanding of User Requirements & Processes 
          The  bidders  are  required  to  provide  their  understanding  of  the  project  (i.e.,  User 
          Requirements  for  Automation  and  Processes)  in  narrative  form  along  with  any  proposed 
          recommendations.  These  processes  are  partially  stated  in  this  document  and  Operations 
          Manual. 
    13.7. Number of Processes to be automated 
          Bidders  are  required  to  propose  number  of  processes  to  be  automated  within  budget  as 
          referred  in  section  10.  All  the  bidders  are  required  to  automate  the  key  process  of  the 
          Company as referred in section 10.  
    13.8. Post Implementation Services 
          The  bidders  are  required  to  accept  the  requirements  mentioned  in  Post‐Implementation 
          Services section of this RFP document.  Bidders are also required to submit a project plan  to 
          provide their services for data entry of all the existing records in newly deployed processes. 
    13.9. Project Plan 
          Bidders are required to submit a complete project plan along with following contents: 
            13.9.1.       Work breakdown structure (WBS) 
            13.9.2.       Risk assessment & management 
            13.9.3.       Comprehensive project plan 
    13.10. Detailed and Itemized Pricing 
          Bidders  are  required  to  provide  a  detailed  and  itemized  pricing  for  automation  of  processes 
          within the budget as referred in section 10.2 

 

 

 

 

 

 

 

 

 




                                                       14 

 
National ICT R&D Fund 




14.       Annexure – I 
 
Evaluation Form 
 
S. No.    Criteria                                          Marks  Marks     Remarks  
                                                                   Obtained 

Technical Evaluation 

1         Understanding of user requirements and            6                 
          processes needed to be automated; these 
          processes are partially stated in this 
          document and operations manual. 

2         Consultant profile                                6                 

3         Qualifications & experience of core team          6                 
          members in implementing similar systems 

4         Implemented system’s flexibility to               7                 
          accommodate modification of existing 
          processes & additions of new processes 

5         Proven technical & professional services of       6                 
          the Consultant 

6         Use of Open Source technology                     7                 

7         Proven implementation methodology &               7                 
          experience of development ERP, Groupware, 
          Office automation or similar systems 

8         References in the public, private, donor          5                 
          agencies, NGOs & Government sector 
          organizations 

9         Project plan                                      6                 
          i. Work breakdown structure (WBS) 
          ii. Risk assessment & management 
          iii. Detailed phase wise project plan 

10        No. of processes to be automated within the       7                 


                                                      15 

 
National ICT R&D Fund 


         budget 


11       Post implementation services          7           

         Sub Total                             70          

Financial Evaluation 

12       Bid Price                             30          

         Grand Total                           100         

 

 

 

 

 

 




                                         16 

 

						
Related docs
Other docs by icl10546
Driving Directions copy
Views: 3  |  Downloads: 0
Copy of cost of driving thru 2007.xlsx
Views: 3  |  Downloads: 0
80036-1 MajorsMatrix_10x13Jan08 copy
Views: 2  |  Downloads: 0
Production Change Promotion Proposal
Views: 5  |  Downloads: 0
20 WW SSB Results Aug09 copy
Views: 276  |  Downloads: 0
Tips on Developing Strong Proposals
Views: 1  |  Downloads: 0
Reed ExhibitionsRevised website copy1st draft
Views: 1  |  Downloads: 0
EP Rapporteur proposal
Views: 7  |  Downloads: 0