APEX Schedule March 22 2006
Document Sample


APEX Schedule March 22 2006
Store
Store injection injection 6x6
2/3
Sextupole resonance
10 Hz orbit Polarity correction DA with
Feedback Optics Check Luo + team AC dipole Back
Montag Stoch. Bai Luo Bai 2
Michnoff Cooling Michnoff Satogata Pilat
Schultheiss Bengtsson
Physics
kicker
Brennan Ptitsyn, Luo
Blaskiewicz
BBQ sensitivity
Cameron
8am 10am 11am 12pm 3pm 5pm 7pm 8pm
Kicker aligned now
Low intensity bunch demonstrated Confirmed sensitivity
Feed-back not to losses at BBQ location
ready (DSP)
Development
continues
• horizontal ac dipole wasn’t firing
due to technical glitches
• vertically, the maximum coherent
we Got without lossing beam is 0.2mm
in the middle of arcs and 1mm at Q3
• The preliminary measurement shows
the vertical beta* at IP8 is about
30% larger than IP6
Mei Bai
Machine-Experiments Meeting, 12/10/2003
Sextupole polarity
Luo, Satogata, Cameron
2/3 correction at injection
Detailed plan for
next time formulated
Excitation with
AC dipole
APEX Schedule March 28-29 2006
End of
store or Store
6x6 injection 6x6
2/3 Sextupole
resonance DA with Polarity BBQ Skew Long range
Optics correction AC dipole Check sensitivity chromaticity Beam beam
Bai Bengtsson Bai Luo Tepikian Fischer
Michnoff Luo Pilat Satogata Cameron
Calaga Bengtsson
Satogata
Bai
BBQ
sensitivity
Cameron
8pm 9pm 12am 1am 2am 3am 5am 8am
•Scheduled APEX canceled this week
•Studies after maintenance if intensity/polarization too low
for physics
•Make-up some hours for APEX next week