									OVERALL SCOPE OF WORK

    The Contractor is responsible for retrofit & alternation an area of approximately 200m2
    of the existing cleanroom which is situated on G/F, Wireless Centre at Hong Kong
    Science Park. Details of work shall include the design, supply, delivery, installation,
    testing and commissioning of a cleanroom and its associated M&E services as shown on
    the attached drawings.

    The work shall include items of work as described below and/or as shown on the
    drawings:
    1.1    Equip with proprietary or off-the-shelf cleanroom wall/partition and ceiling
           system as well as a raised floor system as shown on the attached design intent
           drawings.

    1.2    Equip with related electrical and mechanical services and the associated piping,
           fittings and outlets. These include the supply and installation of MCB boards,
           isolators, 13A twin socket outlets, compressed air, drainage, exhaust, DI water and
           process gases.

    1.3    DELETED

    1.4    Hook-up with all listed process equipment including all necessary utilities
           connections.

    1.5    Modify the existing air conditioning system, fire services installations and extract
           air fan for the air-conditioning and ventilation system for the cleanroom.

    1.6    Supply and install intercom system for the cleanroom.

    1.7    Supply and install Safety shower and eye wash at the plant room.

    1.8    Supply and install a deionized water system, waste collection system, chemical
           neutralization system, vacuum system, process exhaust system including water
           scrubber, and associated safety monitoring & alarm systems.

    1.9    Supply and install a manifold system of Process Gas supply.

    1.10   Modify the existing Compressed Dry-Air (CDA) system to the requirement of the
           specification.

    1.11   Supply & install 2 sets of Wet Processing Benches and 2 sets of Fume Cupboards.

    1.12   Equip with related electrical and mechanical services and the associated piping,
           fittings for Plating line.

    1.13   Supply & install an energy meter at main chilled water supply termination.

    1.14   Submit details calculation before work commencement.