History of Improvement Districts in Mohave County

W
Shared by: historyman
-
Stats
views:
7
posted:
10/29/2008
language:
English
pages:
2
Document Sample
scope of work template
							         History of Improvement Districts in Mohave County
         Bond     Project Name &
Year                                                      Improvement Description
         Status         Type
1990 -   Bonds Project 1 & 2 Water       The Golden Valley County Improvement District #1
1991      Paid                           formation. The District covers 40 square miles which
                                         includes over 5,000 parcels of land. The project involved the
                                         construction of two major wells and two large storage tanks.
1991     Bonds   Zone C1 Waterlines      The Golden Valley Zone C1 water line project. This project
          Paid                           included the installation of waterlines on the one mile section
                                         lines within Zone C1.
1992     Bonds   Eloy & Stewart          The Eloy Road and Stewart Mountain Road Waterline
          Paid   Mountain Waterlines     Project. This project involved the installation of waterlines on
                                         Eloy Road and Stewart Mountain Road between Chino
                                         Drive and Burro Drive.
1992     Bonds   Butler ID #1            The Butler Improvement District #1 Paving Project.
          Paid   Paving                  Approximately 22.3 miles of roads were paved in this project.
1993     Bonds   Egar & Estrella         The Egar Road and Estrella Road Improvement District. This
          Paid   Paving                  project included the paving of Egar Road and Estrella Road
                                         from State Highway 68 to Shinarump Drive. Approximately
                                         9.5 miles of roadway was paved.
1993     Bonds   Cerbat Ranch            The Cerbat Ranch Road Improvement District. This project
          Paid   Paving                  involved the paving of Cactus Wren Road from Stockton Hill
                                         Road to Cherum Drive.
1994     Bonds   Butler ID #2            The Butler Road Improvement District #2. Approximately 10
          Paid   Paving                  miles of streets were paved in this project.
1994     Bonds   Zone B & D Waterlines   The Golden Valley Zone B and Zone D Waterline Extension
          Paid                           Projects. Waterlines were installed on each one mile section
                                         line in Zone B and Zone D along with seventeen, half mile
                                         waterlines.
1994     Bonds   Rancho Verde            The Rancho Verde Road Improvement District. This project
          Paid   Paving                  involved the paving of roads in Rancho Verde.
1995     Bonds   Phase II                The Golden Valley Phase II Waterline Project. Waterlines
          Paid   Waterlines              were installed on twenty one, half mile streets.
1996     Bonds   Rainbow Acres Paving    The Rainbow Acres Road Improvement District. This project
          Paid                           involved the paving of roads within Rainbow Acres.
1997     Bonds   Phase III               The Golden Valley Phase III Waterline Project. Waterlines
          Paid   Waterlines              were installed on sixteen, half mile streets.
2000             Horizon 6               The Horizon 6 Road Improvement District. This paving
                 Paving                  project included paving of roads within Horizon 6, which is
                                         located south of Lake Havasu City.
2001             Phase IV                The Golden Valley Phase IV Waterline Project. Waterlines
                 Waterlines              were installed on twelve, half mile streets.
001              Scenic ID               The Scenic Improvement District Road and Bridge Project,
                 Paving & Bridge         located in the upper Arizona Strip area. This project included
                                         a 485 foot bridge across the Virgin River and paved
                                         approximately 10.5 miles of road.
                                           Page 1 of 2
         History of Improvement Districts in Mohave County

Notices and Scheduled Improvements
The Golden Valley Improvement District's Consumer Confidence Report for 2006, required by
Federal Regulations, is available to the public at the Mohave County Board of Supervisor's office,
Supervisor Buster Johnson's Office, GVID #1 District office, the Mohave County Public Works office
and on the following webpage http://www.co.mohave.az.us/ContentPage.aspx?id=128&cid=205. This
report shows the testing results of the water in GVID #1 for 2006.

New Phase V Waterline Project will be starting in the Golden Valley Improvement District. It will
consist of approximately 37 miles of new waterlines. The project should start sometime in 2008 and
be completed in 2010.

There are usually several petitions being circulated by property owners for paving, water and
sanitary project. For information on the status of these petitions contact:

Zelda Wright, Improvement District Supervisor
(928) 757-0914
3675 E Andy Devine Ave Kingman AZ 86401
P O Box 7000 Kingman AZ 86402-7000
zelda.wright@co.mohave.az.us




                                              Page 2 of 2

						
Related docs