Storm Water Management Development Permit Checklist Requirements

Document Sample
Storm Water Management Development Permit Checklist Requirements Powered By Docstoc
					Storm Water Management
Development Permit Checklist Requirements

For each permit (case) type below, the checklists identified under the permit type should
be annotated with the location on the plans or in the report where the particular comment
has been addressed. Write the location where the comment has been addressed at the end
of the comment. The description of the location should give page number and quadrant
on the page at a minimum. If the comment does not apply, put “NA” at the end of the
comment. DO NOT JUST CHECK THE BOX AT THE BEGINNING OF THE
COMMENT. THIS IS NOT SUFFICIENT TO MEET MINIMUM CRITERIA. Turn in
the required annotated checklists with the submittal.

CPL – Concept Plan
      1) Concept Plan

SDP, CDP, or MDP – Preliminary Plan or Site Plan
      1) Preliminary Plat or Site Plan
      2) Storm Water Management Report
      3) Water Quality Performance Review
      4) One of the BMP Checklists
      5) Dam Break (If applicable)
      6) Dam Design (If applicable)
      7) Flood Study (If applicable)

Additional Checklist for CDP or MDP – Commercial; Site Plan
       1) Maintenance Agreement

LDP Only – Preliminary Plan
     1) Preliminary Plat or Site Plan
     2) Storm Water Management Report

FPL - Final Plat
       1) Final Plat
       2) Maintenance Agreement
       3) One of the As-built BMP checklists