Support Organizations Reporting to the Director’s Office
W
Shared by: variablepitch339
Categories
Tags
-
Stats
- views:
- 2
- posted:
- 1/7/2010
- language:
- English
- pages:
- 44
Document Sample


Support Organizations Reporting to the Director’s Office ISO14001 Environmental Management System & OHSAS 18001 Occupational Heath and Safety System Management Review Managed for the U.S. Department of Energy by Brookhaven Science Associates 12/04/08 Support Organizations Reporting to the Director’s Office ISO14001 Environmental Management System SORD EMS Management Review EMS Rep: Anna Bou Managed for the U.S. Department of Energy by Brookhaven Science Associates 12/04/08 Agenda Scope Recent changes to EMS program Significant Environmental Aspects Results of Audits Status of Objectives and Targets (Follow-up from FY07 MR) Noteworthy E-practices and Improvements Status of Corrective/Preventative Actions Stakeholder Issues FY09 Suggested Objectives (Improvements) Request for feedback 3 Recent Changes Description of ESHD EMS Program: Located at ESH EMS Web Site: http://intranet.bnl.gov/eshq/ems/ The scope of ESH's EMS includes all activities internal to the ESH Directorate, as well as all activities internal to the Director's Office (DO), Community, Education, Government & Public Affairs (CEGPA) and Finance Directorate (DI). Activities conducted by the above to support institutional systems are not included in the scope of this EMS, but instead covered under BNL's Institutional-Level EMS. Recommendations for change: Decision A: Combine the ESH Directorate + BOP (SORD) OHSAS into one program Decision B: Combine the ESH Directorate + BOP OSH Rep + EMS Rep to one person (Suggestion: A. Bou or N. Bernholc) 4 Significant Environmental Aspects Information Technology Division (ITD) Storage or use of hazardous material (battery banks) Spills (potential) Hazardous waste (cleaners, light bulbs, aerosol cans, etc…) Human Resources: Occupational Medicine Clinic (OMC) Industrial & Hazardous waste (Photo Processor) Spill Potential (Photo Processor) Medical waste (Clinical) 5 Significant Environmental Aspects CEGPA: Office of Educational Programs (OEP) & Production Services Educational Demonstrations: • Hazardous waste • Spill Potential Production Services: • Industrial waste (Press Ink) • Liquid Discharges (Press cleaning) • Atmospheric Discharges (Press Ink) Emissions Unit of Title V Permit, and use of filtration. 6 Significant Environmental Aspects Other groups don’t have significant aspects; however, they are still covered by the EMS. These organizations can and do contribute to continual improvement initiatives. 7 Results of Evaluations of Compliance Compliance Audits: Tier I All findings closed New York State RCRA Audit (Sitewide)– One Notice of Violation, none applicable to SORD organizations EPD Multi-Topic Assessment No non-conformance or non-compliance issues identified. 8 Results of EMS Assessments Systems Audits: EMS Internal Assessment (February 2008) • One minor nonconformance: An obsolete version of an OMC waste procedure (dated 2002) was not removed from circulation • One Observation: The Correspondence and Commitment Tracking Subject Area is unclear as to whether external environmental inquiries received informally are required to be entered into CCTS. Not clear that the system is being routinely used. NSF Recertification Assessment (June 2008) • OFI – CEGPA – Consider capturing quality improvement and community involvement goals with positive ESH impacts when setting future objectives and target (Educational Program’s Open Space Stewardship Program). 9 FY 08 Objectives and Targets SORD Objective: Train purchasers and specifiers on the requirements of the Environmentally Preferable Purchasing (EPP) Program by participating in EPP awareness training for all credit card holders. Results: EPP awareness training was provided to credit card holders in April 2008. Training was also provided at the institutional level. **First objective written that applies to SORD as a whole – Improvement! HR, Diversity Office, OMC, and CDC Objective: Improve Electronics Stewardship - Enable ENERGY STAR features on computer monitors 10 Noteworthy Practices CEGPA – Office of Educational Programs (OEP) “Computers for Learning” Program Results: Donated 20 computers and monitors and 4 printers valued at $22K to LI schools. 11 Other Improvements CEGPA – Production Services Added 100% recycled, Forest Stewardship Council (FSC) certified paper where possible. Used 100% biodegradable foam boards for displays. Soy inks reviewed for replacement due to metal content and discharge concerns. No substitute available. Graphic Arts – bicycle used as delivery option. 12 Other EMS Information Stakeholder Concerns – No issues with external stakeholders. No formal “e”-related corrective and preventive actions. 13 FY09 Objectives - Suggestions Suggested EMS Objectives: Improve Environmentally Preferable Purchasing Program (PEMP EO13423) • Evaluate available biobased products as replacements for currently used materials. • Refresher training to purchasers and credit card holders. Reduce paper consumption – promote a policy addressing the use of duplex printing and copying Ensure Electronic Product Environmental Assessment Tool (EPEAT) products are being purchased (ensure ENERGY STAR functions are enabled) 14 FY 09 Objectives - Suggestions Assign personnel to turn off lights at the end of the day in remote facilities or install sensors Identify and implement at least one opportunity to use electronic signatures that will reduce printed copies and traveling time. 15 FY09 Suggestions Any additional objectives or other suggestions? 16 Support Organizations Reporting to the Director’s Office - “SORD” OSH Management Review 12/04/08 OSH Rep: N. Bernholc Managed for the U.S. Department of Energy by Brookhaven Science Associates Management Review Scope – Topics (per OHSAS 18001) 1. Overview of Management System 2. Resource Assessment /Financial Investment 3. Evaluation of Completeness of Hazard evaluations 4. Review of OSH Performance – • • • Audits and Assessments Leading and Trailing Indicators Review of Performance on FY08 OSH Objectives 5. 6. 7. 8. 9. Communication, participation and consultation Changing Circumstances Stakeholder concerns Objectives for FY09 Management Review Questions 18 Overview of the OSH Management System For SORD Written OSH Program: Centralized at Site level • Site OHSAS Web Site • Site Objectives and suggested objectives for line organizations to adopt • Internal Audit • OHSAS 18001 Subject Area Written Program: Maintained at Division/Office Level Division OSH Web Sites will only contain the following. • DISCUSS: Will no longer have their own OSH Management. Should we be In process of removing it from the websites ? • Objectives • Hazard List & Risk Assessments (JRA and FRA) – Should we reduce the individual JRA/FRA’s and use the site wide? • Records and Document Control Management • OSH Program Descriptions 19 ESSH Policy The SORD organizations have posted copies of the Policy in their buildings. The Policy is also accessible from multiple BNL Web Sites No issues were raised in the Internal Audit or NSF Audits regarding BNL staff understanding or accessing the policy. Output: Decision & Action Related to Possible Change Record of Decision: No new action or changes needed in Policy 20 Resource Assessment SORD OHSAS 18001- OSH Representative Division/Office CEGPA Computational Science Center Northeast Regional Counterintelligence Office Director’s Office (including Legal and Office of Strategic Planning ) Nicole Bernholc OSH Point of Contact Scott Bronson, Richard Backofen Mary Lynn Heinrich Nicole Bernholc Nicole Bernholc Diversity, HR/OMC Finance Directorate (Fiscal/Business Systems/Budget) Information Services Information Technology Division Internal Assessment & Oversight Office Quality Management Office Terry Maugeri Toni Hoffmann Patricia Flood Mary Lynn Heinrich Margaret Sparrow Steven Stein 21 Financial Investments OHSAS 18001 Program Resources/Cost OHSAS 18001 Program Persons in this role Personhours /year in FY08 300 Estimated Cost SORD Line Organization OSH Representatives POCs SORD Line Organization OSH POCs Total 1 8 -- 3,000 -- 22 Financial Investments OHSAS 18001 & EMS 14001 Programs Person-hours /year Estimated Cost ESH Directorate & BOP EMS Representative (A. Bou) 80 $ 8000 ESH Directorate OHSAS Representative (R. Selvey) BOP (SORD) OHSAS Representative (N. Bernholc) B BOP EMS ESHD EMS BOP OHSAS 40 60 A ESHD OHSAS $ $ 4000 6000 Recommendations for change: Decision A: Combine the ESH Directorate + BOP (SORD) OHSAS into one program Decision B: Combine the ESH Directorate + BOP OSH Rep + EMS Rep to one person (Suggestion: A. Bou or N. Bernholc) 23 Hazard Assessment Common Hazards Ergonomics High voltage Noise Travel * Indoor Air Egress Driving *, Bicycling * Driving; Bicycling Travel Existing JRA *(Manual material handling; Moving;* Office work) Hazards limited to CEGPA, ITD, OMC and Child Development Center • Non-ionizing Radiation (e.g. RF, microwaves) • Confined Space • Chemicals/toxic hazards • Flammable gasses/liquids/materials • Blood-borne Pathogens 24 Review of OSH Performance Results of OHSAS 18001 Audits Internal Audit Conducted by SHSD - February- April 2008 Corrective action on findings and OFIs are covered in ATS 4244 Only minor or opportunities for improvement for SORD All corrected by the time of the NSF audit External Audit - Site registration by NSF June 2008 Corrective Action Plan developed and tracked in ATS 4226 No findings for SORD organizations. 25 Review of OSH Performance OSH Compliance- Internal Assessments Industrial Hygiene Multiple Topic Self Assessment Site written program and line implementation (Corrective actions are to be tracked in ATS.) Organizations selected those programs that were applicable to their line. Asbestos, Blood-borne Pathogens, Chemicals (Laboratory Standard and HazCom), Indoor Air Quality, Noise and Hearing Conservation, Personal Protective Equipment, 10 CFR 851 Compliance Corrections are mostly program corrections to Site-wide concerns. e.g. Site written program and line implementation (Corrective actions are to be tracked in ATS.) OSH Major Non-conformances: 1 Many locations do not have the asbestos content labeled on building material (29CFR1926.1101(k)(8)(vii).) Chemicals: BNL program’s policies were not modified to reflect NFPA requirements. 26 There is a gap between the Fire Safety Subject Area and WWC Review of OSH Performance Nationally Recognized Testing Lab (NRTL) Electrical Equipment Inspections (EEI) Issues: Inadequate Resources for: 1. Organizing and program oversight (Database) • Reputable manufacturer program allows credit for acceptable equipment. • EEI database will provide BNL-wide sharing of “Reputable manufacturer” inspections 2. Completion of inspections • 30,000+ pieces of equipment need Authority Having Jurisdiction (AHJ) approval • SHSD has committed to inspection all “Balance of Plant” equipment • Inventory of Facilities & Operations, NSLS, CAD still unknown (or only estimated). 3. Addressing growing number of items found not in compliance In SORD only one investigation has been made. ITD investigation was NRTL approved. 27 Review of OSH Performance Performance on Objectives for FY08 CEGPA Computational Science Center Director’s Office (including Legal, AND Office of Strategic Planning, Northeast Regional Counterintelligence Office) HR OMC Finance Directorate (Fiscal/Business Systems/Budget) Information Services Information Technology Division Internal Assessment & Oversight Office Quality Office 28 Completed Completed Completed 3/5 completed 4/5 completed (one to be carried over. Completed Completed Mary Lynn Heinrich Completed 5 of 6 OSH completed. Review of OSH Performance Leading and Trailing Indicators No injuries in : Production Services (10 yrs) Computational Science Center Internal Audit and Oversight Information Services In the remaining SORD organizations: • 2 First Aid Cases • 5 DART/Total Recordable Cases 29 Injury Cases By Department Fiscal Year 2008 Comm. Involve. Gvt. & Pub Aff Case # Injury Date General Activity Injury Cause Fall on same level First Aid DOE Recordable X DART Lost Days 48 Restricted Days 99 X Director's Office Case # Injury Date 09/25/2008 General Activity Food Preparation Injury Cause Sharp Edge Contact with First Aid X DOE Recordable DART Lost Days Restricted Days Fiscal Division Case # Injury Date 12/11/2007 General Activity Office Work Injury Cause Fall on same level First Aid X DOE Recordable DART Lost Days Restricted Days Human Resources Case # Injury Date 08/06/2008 General Activity Material Handling Injury Cause Falling Object First Aid DOE Recordable DART Lost Days Restricted Days X 30 X 31 11 Injury Cases By Department Fiscal Year 2008 Information Technology Division Case # Injury Date 11/06/2007 11/19/2007 11/09/2007 General Activity Walking Walking Office work Injury Cause Slip/Trip Fall on same level Bodily Reaction First Aid DOE Recordable X X X DART X Lost Days 47 0 0 Restricted Days 0 0 0 31 Tier I’s Tier I’s were done in all departments except 1 whose facilities are under construction. A review of the data was done in several meetings held by S. Kane. Most items were closed out within a reasonable time period. Questions? • Are the Tier I’s effective for your organizations? • What help do you need? 32 Site-wide Communication OSH communications from external and internal interested parties (stakeholders) Initiatives in communication Safety webinars (ASSE, NSC) All hands meetings Healthfest Take 5 video safety minute ESSH Monthly Newsletter Radiological News SHSD webpage BNL Bulletin / Monday Memo ESH Coordinator Meetings Director’s Supervisor Meetings 33 Additional SORD Department Communications Department(s) All-hands meetings Distribution of objective implementation process to individuals Training coordinators/ESH coordinators follow-up with staff to receive required training Special Department Training for objectives 34 Effects of Foreseeable Changes to Legislation & Scope of Work OSH Program Areas Ergonomics Rules in 10 CFR 851: DOE audit in FY09. SHSD tracking. Recommendation: Verify that ergonomic hazards are identified in SORD and make sure a plan for resolving these items are in place. Record of Decision: ___No additional actions ___New Action: Develop Plan EEOICPA/ NIOSH may affect workload of OMC. Project reviews and Safety documentation such as Information Technology Division Sigma 7 area; new building 35 FY09 OSH Objectives 1. Objective: Human Performance Improvement (HPI): Initiate/increase Org human performance training for work planning, design, and/or reporting (such as participation in Fisher IT, Inc. or Shane Bush human performance training). Provide HPI training to 80% of line organizations involved in risksignificant activities and processes as identified by the Human Performance Steering Team. 36 FY09 OSH Objectives 1. Objective: Improve DART and TRC rate performance [PEMP 5.1.1.1, 5.1.1.2] 1.d.1 Initiate awareness presentations of injuries related to overexertion, slips, falls, bodily reaction and repetitive motion. – This was started for QA last year Review statistical data on injuries with each line organization Conduct All-hands meeting with discussion of past injuries in line organization and other organizations 1.d.2 Increase Webinar for ESH Professionals of Line Organizations Help prepare for 2009 Ergo Audit - Identify ergonomic hazards 1.e.3 Improve manual lifting and ergonomics training. 1.e.4 Target specific groups for proactive presentation/evaluation by the new Physical Therapist 1.e.5 Advertise the services of the new Physical Therapist for personal and work related injury therapy. 37 FY09 OSH Objectives 2. Objective: Reduce Traffic violations and accidents. [PEMP 5.1.1.1, 5.1.1.2] 2.A Institute an appropriate organization level initiative to raise employee awareness of vehicle safely (such as use of DVD class.) 2.b. Raise awareness of the requirement for disciplinary actions for repeated violations with supervisors. As per the Disciplinary Actions Subject area. 4. Objective: Improve Chemical Storage in Flammable Cabinets Improve storage to no violations of NFPA requirements for flammable cabinets. (Target = 0 non-compliant cabinets) 5. Use site JRA /Eliminate redundant documents Participate on working group when formed 38 2009 Objectives - Finalization Treat organizations with office functions as one. Not every small organization needs to do an objective. Decide which organization will work on a goal. Less is more. Don’t pick too many objectives. Do less but do it better. ITD, OMC and CEGPA have the most objectives because they have the most potential hazards. ITD and CEGPA should pick an additional chemical goal. 39 FY09 OSH Objectives Output: Decision & Actions Related to Possible Change: OSH Objectives: These Objectives and Improvement Initiatives were based on the proposed sitewide objectives. They may be change if the sitewide objectives are modified. They are adequate to address issues from Internal OSH Audits, NSF Audit, known weakness, and improvements. Record of Decision: ___Accept these Objectives ___Additional Objectives or changes: 40 Issues from FY07 SORD Management Review Issue Lack of ESH coordinator for Director’s Office Organizations Resolution Appointed N. Bernholc to the role Question: Does having an individual outside the organization serve the needs of the organizations? 41 Management Review Decisions 1. Is the OSH Management System effective in achieving policy commitment? Is the OSHMS effective in achieving the objectives, targets and performance measures? 2. 3. Is the OSHMS adequate in terms of: a) Resource allocation? b) Information systems? c) Organizational issues – staff expertise; procedural requirements 42 Management Review Decisions 4. Are the objectives, targets and performance measures suitable, taking into account the following factors: a) Injuries/illnesses? b) Current and future regulatory requirements? c) Business interests, technological capability? d) Internal organizational or process changes? 5. Should additional objectives, targets or performance measures be established? 43 Any Additional Comments or Concerns? Thank you for your participation This PowerPoint presentation will be posted on the Site OSH Web Page Minutes of this Meeting and a Record of Decision on Issues will be prepared and posted on the Site OSH Web Page 44
Related docs
Get documents about "