					                                 Piping System Pneumatic Test Checklist
                                          NASA Glenn Research Center

                                                                  Weld Request No.#
                                                                                         (N/A for non PSO Related)


    Description                                                                Initial                Date

 1. System Index Number:

 2. Line Identification:

 3. Pneumatic Test Pressure, psig:

 4. Design Pressure, psig:

 5. Pneumatic Test Fluid:

 6. Test Fluid Temperature, F:

 7. System Metal Temperature, F:

 8. Verified Calibrated Gauges:

 9. Pneumatic Pressure Source Verified:

10. Pneumatic Test Start Date/Time:

11. Pneumatic Test Completion Date/Time:

12. Visual Exam at Operating Pressure:

13. Pneumatic Test Performed By:


    Organization:


 REMARKS:




 Inspector
                     Signature                             Date

 Witness
                     Signature                             Date