									Training Program for Technicians Distribution Reform, Upgrades and Management (DRUM) Training Program

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LIMITED
As per Section 5 of the Indian Electricity (Supply) Act 1948, Electricity Boards came into existence in India in the Year 1954. In Maharashtra, Maharashtra State Electricity Board was formed in 1960. For the past 45 years the Maharashtra State Electricity

Board has successfully carriedout the work of Generation, transmission and distribution of electricity. In the course of time electricity act 2003 was made applicable by the central government and the Maharashtra State Electricity Board was divided in four Government owned Companies.
1. M.S.P.G.C.L. (Generation) 2. M.S.E.T.C.L.(Transmission) 3. M.S.E.D.C.L. (Distribution) 4. M.S.E.B. HOLDING COMPANY. The work of transmission of electricity power generated by generating Station to the distribution Company is entrusted to M.S.E.D.C.L. For the purpose of transmission of power, at present, the transmission company is having transmission lines of 66 KV and above and also to load dispatch centres. The Maharashtra grid of power is controlled by load dispatch centres. The work of distribution of electricity to the consumers is done by the distribution company. GENERATING STATION IN MAHARASHTRA : 1. Power Generating Station Thermal- 7 Nos. 1. Koradi 5. Paras 2. Bhusawal 3. Parali-Vaijanath 4. Chandrapur

6. Khaperkheda 7. Nashik.

2. Hydro Power Generating Stations – 32 Nos. 1. Koyana 2. Vaitarna 3. Bhira- Tailrace 8. Bhandardara 4. Tillari 5. Bhatghar

6. Radhanagari 3. Automic Power Station : 1. Tarapur .

7. Paithan

9. Bhatsa ….. etc.

4. Power Generating Station – Gas. 1. Uran. TRANSMISSION LINES & SUB-STATIONS : 1 ± 500 kV H.V.D.C. 5. 66 kV 2. 400 KV 3. 220 KV 4.132 kV ,110 kV , 100 kV

Space for Institution Logo

Power Finance Corporation Ltd.
(A Govt. of India Undertaking)

1

Training Program for Technicians Distribution Reform, Upgrades and Management (DRUM) Training Program

LOAD DESPATCH CENTRES : 1. Kalwa 2. Ambazari

As per the changes in the electricity act the distribution company shall be responsible for the distribution losses. From this view it is necessary to clamp and implement the work. While working in distribution company it is expected to bring down the distribution losses and to remove obstacles from availability of electricity Supply. For achieving the targets it is absolutely necessary update our knowledge and to work hard. Goals of Electricity Companies :- Continious supply to the consumers : 1. At proper voltage and tariffs – Planning and implementation of schemes for the same. i) To generate adequate electric power (Generation) ii) Transmission of electricity (Transmission). iii) Distribution of electricity to the consumers (Distribution). iv) Billing and recovery of bills for electricity used. … … …. Sub-Stations in Maharashtra : Electricity is generated at 11Kv to 15Kv voltage. If it is transmitted at the low voltage upto the consumers ,there will be huge line loss. Line loss is Proportional to the area of cross section of the conductor and the current flow. If voltage is increased, the current is reduced for transmission of same amount of power. And therefore for transmitting the power generated, voltage is increased. This voltage can be steped up or steped down at sub-stations, as per requirement of utilization. Sub-transmission lines are then taken out from sub-station. Their voltages can also be changed as required then onwards HT distribution lines are taken out. The voltage of the HT Lines is further reduced upto 440 volts and low voltage lines are then used for distribution of power to general consumers. The Station (location) where voltage is steped up or steped down is called a sub-stationn Types of Lines 1. L.T. Distribution : Low Voltage Single Phase 230 Volts and medium voltage 3 Phase 400 Volts 2. H.T. Distribution : High voltage line – 11KV to 33 KV 3. Sub-Transmission : Extra High Voltage Line 66 kV to 110 kV . 4. Transmission lines 132 KV to 400KV .

Space for Institution Logo

Power Finance Corporation Ltd.
(A Govt. of India Undertaking)

2

Training Program for Technicians Distribution Reform, Upgrades and Management (DRUM) Training Program

Types of Sub-Stations are as follows : 1. 2. 3. 4. 5. Major Sub-Station : Incomming transmission line voltages are 66 KV and above. Minor Sub-Station : Incomming transmission line voltage is below 66KV. Stepup Sub-Station: Sub-Station in which voltage is increased. These are generally located near generating station. Stepdown sub-station: In this sub-station voltage is reduced. Switching Station : In this sub-station voltage is not changed only nos. of feeders are increased.

In Maharashtra, the Electricity Board has achieved major progress from its formation. It ranks first in India. The progress achieved by the Board as on 31-122004, in brief , is as shown below : Installed Generating capacity : 14363.6 MW. Nos. of consumers : 1,35,32,398. Installed Electricity Generating Capacity of Maharashtra State (as on March,2004) in MW . Hydro 2434 444 2878 Thermal 6425 1150 500 1481 9556 Gas 912 180 455 1547 Nuclear 190 253 443 Others 728 728 Total 9771 1774 500 190 728 2189 15152

Mahagenco TATA BSES TARAPUR DABHOL CENTRAL SECTOR SHARE TOTAL :

M.S.E.T.C.L. Network as on March,2003 . Sr.No. 1. 2. 3. 4. 5. 6. 7. 8. Voltage KV ± 500KV HVDC 400KV 220 KV 132 KV 110 KV 400 KV 66 KV 33KV No.of S/Stn. 02 19 112 205 31 21 51 1630

Space for Institution Logo

Power Finance Corporation Ltd.
(A Govt. of India Undertaking)

3

Training Program for Technicians Distribution Reform, Upgrades and Management (DRUM) Training Program

400 KV Transmission Network : 400 KV lines : 1. Koradi–Bhusawal 3. Bhusawal-Babhaleshwar 5. Dhule-Babhaleshwar 7. Chandrapur-Parali 9. Padghe-Kalwa 11. Karad-Lonikand 13. Lonikand- Kharghar-Kalwa 15. Dabhol-New Koyana 17. Dhule- Kasore 19. Karad-Kolhapur 21. Parali-Solapur 23. Nagothane-Padgha 400 KV Sub-Station : 1. Babhaleshwar 4. Kalwa 7. Lonikand 10. Dhule 13. Nagothane 16. Dabhol 19. Jejuri 2.Bhusawal-Aurangabad 4. Babhaleshwar-Kalwa 6. Koradi-Chandrapur 8. Parali-Karad 10. Parali-Lonikand 12. Lonikand-Kalwa 14.New Koyana-Lonikand 16. New Koyana-Karad 18. Karad-Solapur 20. Aurangabad-Babhaleshwar 22. New Koyana-Nagothane 2. Bhusawal 5. Karad 8. Koradi 11.Kharghar 14. Aurangabad 17. Solapur 3.Chandrapur 6. Padghe 9. Parali 12. New Koyana. 15. Kolhapur 18.Lamboti

INTER-STATE LINES :

1. Koradi-Satpura - 400KV 2. Ambajhari-Satpura -220 KV 3. Bhusawal –Chandani -132KV 4. Kanhan-Pench-132 KV 5. Dhule-Itarshi – 400 KV

Maharashtra – Chhatisgarh : 1. Koradi-Bhillai- 400KV. 2. Chandrapur-Bhillai- 400 KV. Maharashtra-Gujarat : 1. Nashik- Navsari – 220 KV 2. Tarapur-Vapi-Navsari-220 KV 3. Padghe-Gandhar-400 KV 4. Dhule-Kasore -400KV Other States : 1. Kolhapur-Belgaon- 220KV (Karnatak). 2. Kolhapur-Tillari – Fonda -220KV (Goa). *****