Project Planning & Tracking
1/26
1
Software Cost Estimation
• Most planning efforts begin with an
estimate of the cost, in terms of
time, money, or effort, of a project
• Cost estimation is very difficult in
software development because it
depends on so many factors
2/26
2
Cost Factor: Programmer Ability
A famous 1968 study by Harold Sackman
revealed the following differences between
programmers:
Measure Best : Worst
Debugging time 28:1
CPU development time 8:1
Coding time 16:1
Program size 6:1
Running time 5:1
3/26
3
Cost Factor: Product Complexity
Program effort increases by a factor of
about 1.5 between each of the following
categories:
– business application programs (payroll)
– scientific application programs (stress analysis)
– software tools (compiler)
– system software (operating system)
– embedded systems (avionics)
There is a total increase in effort of a factor
of about 7.5 across this spectrum
4/26
4
Cost Factor: Program Size
Large programs are much more difficult
to develop than small ones. Effort
seems to be an exponential function of
program size:
f
effort = k * size
where f is a factor usually estimated
between 1.05 and 1.83
5/26
5
Cost Factor: Level of Reliability
• Reliability is the probability that a program
will perform correctly under stated
conditions for a given period of time
• Reliability can be low for programs whose
failure only causes inconvenience, or very
high when human life is at stake
• Effort varies by a factor of about 2 for
programs at opposite ends of this
spectrum
6/26
6
Cost Factor:
Development Environment
• Productivity increases by a factor of
between 5 and 10 when a high level
language is used instead of
assembler
• Effort decreases by about half when
developers work in an excellent
development environment
7/26
7
Cost Factors: Summary
Taken together, these (and other)
cost factors make it clear that effort
for developing a program can vary
over several orders of magnitude,
thus making software project cost
estimation very hard.
8/26
8
Cost Estimation: Analogy
An expert estimates the cost of the
current project by comparing it with
past, similar projects.
– cheap, easy, and often accurate technique
– fails when there is no experience with
similar projects in the past
– fails when estimators overlook important
cost factors
9/26
9
Cost Estimation: Delphi Method
Developed at the Rand Corporation in 1948 for
achieving expert consensus without group
conflict:
– a team of experts is formed and asked not to discuss
their work with one another
– a coordinator provides each expert with project
information and asks for an estimate
– coordinator distributes anonymous estimates, with
comments, and asks for revised estimates
– process continues until consensus is reached
Usually works well, but is expensive and time
consuming.
10/26
10
Cost Estimation: Bottom-Up Technique
• Breaks a project into parts, estimates
the cost of the parts, then combines
all estimates to achieve an overall
estimate
• Projects may be broken down by:
– sub-systems or modules
– life cycle phases
– project tasks
– work assignments
11/26
11
Work Breakdown Structure
A work breakdown structure (WBS)
is a tree whose root represents an
entire project or product, and
whose other nodes represent a
hierarchical decomposition of the
project or product.
12/26
12
Bottom-Up Techniques
Advantages and Disadvantages
+ Make all project or product parts
explicit, thus providing a basis for
scheduling and resource assignments
+ Easy and cheap method to apply
– Low level estimates are usually made
by analogy, and so may fail for new
products or tasks
13/26
13
Cost Estimation: Algorithmic Cost Models
• Provide computational means for deriving
estimates as functions of important cost
factors
• Functions used contain constants derived
from statistical analysis of data from past
projects:
– can only be used if data from past projects is
available
– must be calibrated by knowledgeable analysts
– relies on initial size and cost factor estimates which
themselves are questionable
14/26
14
Scheduling & Resource Assignment
Scheduling is planning when a
task will occur.
Resource assignment is
planning which people and other
assets to use for a task.
Control, tracking, or monitoring
is comparing plans to reality and
adjusting plans as needed.
15/26
15
Scheduling & Resource Assignment Tools
Two graphical tools are widely used
for these scheduling and resource
assignment:
– Gantt Charts
– PERT/CPM Charts
Gantt and PERT charts are
sometimes combined to incorporate
the advantages of both.
16/26
16
Gantt Chart
A Gantt chart is a bar
chart that plots tasks or
resources against time.
17/26
17
Gantt Example—Resources
Week 1 Week 2 Week 3 Week 4
Front-Loader
Dump-Truck 1
Dump-Truck 2
Supervisor
18/26
18
Gantt Chart
Advantages and Disadvantages
+ Gantt charts are simple and can show
many aspects of tasks and resources
clearly
– Gantt charts do not lend themselves to
computation of schedule attributes like
completion dates, slack time, etc.
– Gantt charts are difficult to use for project
tracking without computer support
19/26
19
PERT/CPM Chart
A PERT/CPM chart is a directed
graph that shows tasks, their
durations, and their
precedence relationships, and
allows estimation of project
completion times.
20/26
20
PERT Example
Task 2
6 units
Task 1 Task 5
4 units 3 units
Task 3 Task 4
2 units 3 units
21/26
21
PERT Chart
Advantages and Disadvantages
+ PERT charts support sophisticated
techniques for analyzing schedules
– PERT charts do not show task durations
graphically and may be difficult to read
– PERT charts are difficult to analyze
without computer support
– PERT charts are difficult to use for project
tracking without computer support
22/26
22
Hybrid Gantt/PERT Charts
Hybrid charts that show task
durations like Gantt charts, and
task precedence relationships
like PERT charts, can provide
the advantages of both tools.
23/26
23
Project Management Software
Improved Planning—all tasks and their
relationships must be considered and
documented in detail
Improved Cost & Time Estimation—the software
computes them correctly and consistently
Improved Communication—detailed, up-to-date
reports are easily generated
Improved Tracking—actual completion dates
and resource costs are easy to add and
incorporate into schedules and estimates
Overall Improvement—many inconsistencies are
detected by the software
24/26
24
Project Planning & Estimating Tools
Activity Percent of Projects With Automation
Sizing 15
Cost estimating 25
Quality estimating 3
Planning 65
Tracking 35
Measuring productivity 5
Measuring quality 15
Assessing 10
25/26
25
Advantages of Tool Use
For large projects (more than 250 KLOC):
– Manual planning and estimating:
» 40% at least 6 months late
» 15% at least 12 months late
– Automated planning or estimating, but not both:
» 12% at least 6 months late
» 5% at least 12 months late
– Both automated planning and estimating:
» 5% at least 6 months late
» 1% at least 12 months late
26/26
26