PGI 206_3

Document Sample

Shared by: Daryl
Categories
Tags
Stats
views:
115
posted:
10/31/2007
language:
English
pages:
1
DFARS Procedures, Guidance, and Information

PGI 206—Competition Requirements



PGI 206.3--OTHER THAN FULL AND OPEN COMPETITION PGI 206.302 Circumstances permitting other than full and open competition. PGI 206.302-2 Unusual and compelling urgency. (b) Application. The circumstances under which use of this authority may be appropriate include, but are not limited to, the following: (i) Supplies, services, or construction needed at once because of fire, flood, explosion, or other disaster. (ii) Essential equipment or repair needed at once to— (A) Comply with orders for a ship; (B) Perform the operational mission of an aircraft; or (C) Preclude impairment of launch capabilities or mission performance of missiles or missile support equipment. (iii) Construction needed at once to preserve a structure or its contents from damage. (iv) Purchase requests citing an issue priority designator under DoD 4140.1-R, DoD Materiel Management Regulation, of 4 or higher, or citing “Electronic Warfare QRC Priority.”



2004 EDITION



206.3-1




Share This Document


Related docs
Other docs by Daryl
IG5336.9201-ch4-5
Views: 78  |  Downloads: 0
IG5317.9500
Views: 156  |  Downloads: 0
Dfars 231
Views: 285  |  Downloads: 0
Lease Amending Agreement
Views: 116  |  Downloads: 4
b32c
Views: 114  |  Downloads: 0
52_248m
Views: 61  |  Downloads: 0
PGI 201_1
Views: 148  |  Downloads: 0
PGI 207_5
Views: 42  |  Downloads: 0
MP5303
Views: 80  |  Downloads: 0
by registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!