Municipal Maintenance Agreements
Document Sample


Municipal Maintenance Agreements Computerized Traffic Signal Systems Schedule “D” Greg Fuller, PE Traffic Management Systems Engineer Schedule “D” Maintenance and Operation of Traffic Signal Systems 13 statewide Key Components of Agreement – – – – – Central Computer and Head-End Equipment Communications Infrastructure System Detectors CCTV Cameras System Operations Engineer(s) Shared Cost Participation Performance Audits Key Components of “Good” Level of Service + 80% of signals controlled by system Timing plans evaluated every 18 months - implemented within 6 months Implement new plans on significant growth corridors annually Maintain active traffic data collection program – 80% of system detectors operational – Maximum time to repair is 60 days New intersections have timing plans implemented within 30 days Perform PM every 6 months Control Center is staffed during AM & PM peak hours and special events Traffic responsive plans used where appropriate System Operations Engineer Education and Experience – BSCE & 3 years of Transportation Engineering Experience – Knowledge of signal timing and optimization software Essential Duties – Evaluate existing traffic conditions – Develop and implement new timing plans – Implement temporary timing plans for local loop malfunctions – Coordinate with Department on roadway construction projects Full-Time System Operations Engineer/200 Signals Where Do We Go Now? Finalize Draft with Traffic Engineering Council of NCSITE Regional Meetings with Divisions and Municipalities Proposed Schedule “D” Complete by Spring 2001
Related docs
Get documents about "