5318

Reviews
Shared by: Daryl
Categories
Tags
Stats
views:
36
rating:
not rated
reviews:
0
posted:
10/31/2007
language:
English
pages:
0
AIR FORCE FAR SUPPLEMENT PART 5318 — RESERVED AFFARS LIBRARY Laws / Regulations / Policy Informational Guidance Training Community Advice Suggestion Box PART 5318 Emergency Acquisitions [Revised March 14, 2007] SUBPART 5318.1 — AVAILABLE ACQUISITIONFLEXIBILITIES 5318.104 Unusual and compelling urgency. The Life Cycle Management Plan (LCMP)/Single Acquisition Management Plan (SAMP)/Acquisition Plan (AP) approval authority is authorized to sign and approve the Determination and Findings (D&F) required by FAR 6.202(b)(1). See 5306.302-2. 5318.2 EMERGENCY ACQUISITION FLEXIBILITIES 5318.201 Contingency Operations. (1)(a) Selection, appointment, and termination of contingency contracting officer appointment. See Appendix CC-203, Selection of contingency contracting officers, and CC-204, Appointment of contingency contracting officers. See also AFFARS Library Appendix CC - Contingency Contracting. (1)(B) Delegation from head of the agency to Heads of Contracting Activities (HCAs) for micropurchases and simplified acquisitions of supplies or services as used in support of a contingency operation or to facilitate defense against or recovery from nuclear, biological, chemical, or radiological attack. See 5313.003(i) and 5301.601(a)(i)(A)-(D). (9) Authorization Acts, Appropriation Acts, and other statutory restrictions on foreign acquisition. When the contracting officer determines, through market research, that an article or suitable substitute is not available from a domestic source the contracting officer shall submit a determination and finding (D&F). See 5325.7002-2(b), and MP5325.7002-2. (11) For information on Air Force Contingency Contracting policies, responsibilities and implementing procedures, see the Air Force Contingency Operational Contracting Support Program (COCSP), AFFARS Library Appendix CC - Contingency Contracting. 5318.203 Incidents of national significance, emergency declaration, or major disaster declaration. 2002 Edition 5318-1 AIR FORCE FAR SUPPLEMENT PART 5318 — RESERVED (1) Establishing or maintaining alternative sources. The Life Cycle Management Plan (LCMP)/Single Acquisition Management Plan (SAMP)/Acquisition Plan (AP) approval authority is authorized to sign and approve the Determination and Findings (D&F) required by FAR 6.202(b)(1). See 5306.202 and 5307.104-90. 2002 Edition 5318-2

Related docs
5318
Views: 0  |  Downloads: 0
Proposal Quotation Specialist Mechanical
Views: 21  |  Downloads: 1
APPENDIX B TO SUBPART I OF PART 103 –
Views: 0  |  Downloads: 0
276,567 I[439]
Views: 0  |  Downloads: 0
Other docs by Daryl
a-1
Views: 135  |  Downloads: 0
ROSAMNTC
Views: 129  |  Downloads: 0
H-6.NEW4
Views: 135  |  Downloads: 0
DirectDeposit
Views: 184  |  Downloads: 0
Cr_b-1
Views: 113  |  Downloads: 0
b-92
Views: 123  |  Downloads: 0
b-91
Views: 112  |  Downloads: 0
b85
Views: 121  |  Downloads: 0
B48
Views: 107  |  Downloads: 0
b47
Views: 113  |  Downloads: 0
B44 WORKSHEET
Views: 182  |  Downloads: 0
b43template
Views: 59  |  Downloads: 0
b43form
Views: 113  |  Downloads: 0
b34
Views: 60  |  Downloads: 0
b-33
Views: 78  |  Downloads: 0