BF146 - Welcome to the Unive

Document Sample
BF146 - Welcome to the Unive Powered By Docstoc
					BF 146 Module specification

s

Title Code Level Credit rating Pre-requisites Type of module Aims

Learning outcomes/objectives

Comments/notes Specification, Measurement & Pricing B BF 146 One 10 CAT Points None Delivered over one semesters ( Sem 2)  To further develop an ability to measure and describe building work from drawings, to derive unit rates for various items of work  To develop the understanding and ability to build up rates and pricing strategy for the preliminaries and tender sums of a building project. By the end of the module the students should be able to: 1. Translate drawn information into a descriptive and tabulated form 2. Interpret and apply aspects of the Standard method of Measurement (SMM) to a building project. 3. Measure building work from various drawn forms, in accordance with recognised practice and to derive cost components of the work 4. Produce a written ‘Specification of Work’ to comply with client requirements and to facilitate the establishment of unit rates. 5. Prepare items for inclusion in Bills of Quantities and related documentation The purpose and role of building measurement; The Standard method of Measurement (SMM); Procedure for taking-off dimensions from drawings; Transferring dimensions to Bills of Quantities; Pricing building work; Tendering procedure; Identify sources of data and deriving and illustrating the use of unit rates Single Module ~ 100 study hours: This module will be delivered through a combination of lectures, seminars and laboratory work. Indicative Reading List:

Content

Teaching and learning strategies

Learning support

Ashworth A, (2002) Pre-contract studies - Development economics, Tendering & Estimating, Blackwell Brook, M.(2004) Estimating and Tendering for Construction Work. Elsevier Kwakye, A. A.. (1994) Understanding tendering and estimating, Gower SMM7 (1988) SMM7: standard method of measurement of building works : authorised by agreement between the Royal Institution of Chartered Surveyors and the Building Employers Confederation, London : Royal Institution of Chartered Surveyors Assessment tasks Coursework 1 (100%) Code BF101/1: (LO1, LO2, LO3, LO4, LO5) Using typical tender documentation: measure and describe the building works from drawings and prepare a pricing schedule using professionally recognised estimating and tendering procedures. Explaining the tendering and estimating processes, sources of data and deriving and illustrating the use of unit rates for pricing building work Principles and documentation of building measurement and the use of the Standard Method of Measurement (SMM). The approach to and method of measuring building work. The relationship between estimating and tendering Built Environment & Civil Engineering Area Examination Board ML: David Clifford, Noel Painting Semester 2 Moulsecoomb 2007 July 2007 Aug 2008 Rev.1 ~ Review + Examination Board

Brief description of module content and/or aims (maximum 80 words)

Area examination board to which module relates Module team/authors/coordi nator Semester offered, where appropriate Site where delivered Date of first approval Date of last revision Date of approval of this version Version number Replacement for

previous module Field for which module is acceptable and status in that field Course(s) for which module is acceptable and status in that course School home External examiner

FdSc Architectural Technology: Compulsory FdSc Building Surveying: Compulsory FdSc Construction Management: Compulsory School of Environment & Technology Dr J Littlewood


				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:7
posted:12/13/2009
language:English
pages:3